Have queries on this Project?
28.723089
77.745126
Showing 1 blocks with 459 units
Total Carpet Area
13571.37 m²
146080.87 ft²
Total Units
912
2 different types
Blocks & Floors
1
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
10850.00 m²
116788.32 ft²
TOTAL PLOT AREA OF 10850 SQM. DEMARCATED AS PER APPROVED PLAN BY HAPUR DEVELOPMENT AUTHORITY.
70 METER LONG AND 2.4 METER HIGH BOUNDARY WALL WITH RCC COLUMNS AND BLOCK WORK COMBINATION.
765-METER-LONG 7.5M/8.5M/6M WIDE ROAD PROPOSED WITH TRIMIX CONCRETE/BLACK TOP FLOORING AND PAVERS IN MIXED
8M/9M WIDE FOOTPATH ALONG WITH BUILDING ENVELOPE DESIGNED IN A COMBINATION OF PAVERS.
WATER CONNECTION MUNICIPAL/TANKER
SEWER PIPE LINE IS RUNNIG AT BASEMENT CEILING VAI GRAVITY UP TO STP
1. WASTE, SOIL DRAIN PIPE LINE IS RUNNING AT BASEMENT CEILING VAI GRAVITY UP STP. 2. STROM WATER PIPE IS RUNNING EXTERNALLY TO RECHARGE PIT
3283.28 SQ.MT. OF GREEN AREA IS PROPOSED
200 NOS. OF TREES MIXED SPECIES OF EVERGREEN AND DRAUGHT RESISTANT TREES.
30 NOS. OF POLE EXTERNALLY AND BOLLARDS LIGHTS AS PER LANDSCAPE PROPOSED CAPACITY OF TRANSFORMERS PROPOSED 2NOS 1600 KVA OF TRANSFORMER TOTAL IMD 4052.00 KW
N/A
STP CAPACITY 165 KLD MBBR SYSTEM
ORGANIC WASTE COMPOSTER WILL BE INSTALLED FOR SOLID WASTE MANAGEMENT AND DISPOSAL OF ORGANIC WASTE AS PER LOCAL BY LAWS
RECHARGE PIT 5 NOS
SOLAR CAPACITY 80 KW LED LIGHTS AND WE ARE USING HIGH ENERGY EFFICIENT FAN PUMPS AND EQUIPMENTS. EV CHARGING POINT CHARGING40 AT THE RATE OF 10 KW
AS PER NBC 2016 BUILDING COVERED WITH AUTOMATIC ADDRESSABLE FIRE ALARM DETECTION SYSYEM, PA SYSTEM, AUTOMATIC SPRINKLER SYSTEM. BASEMENT FIRE CURTAIN SYSTEM, BASEMENT VENTILATION, STAR CASE PRESSURIZATION, LIFT WELL PRESSURIZATION, LIFT LOBBY PRESSURIZATION, LIFT WELL PRESSURIZATION, LIFT LOBBY PRESSURIZATION SYSTEM, INTERNAL FHC, EXTERNAL FIRE HYDRANT SYSTEM, INTERNAL FHC, EXTERNAL FIRE HYDRANT SYSTEM TOTAL 60 NOS OF HYDRANT IN THE COMPLEX . GAS FLOODING SYSTEM IN ELECTRICAL PANEL.
COMMON TOILET AT EACH FLOOR
AS PER NBC 2016
25 NOS OF CCTV