Launch Date
Completion Date
RERA ID
26.836883
80.896117
Plot is already demarcated. all the development and construction work will be done under the demarcated plot.
Brick work boundary wall at the height of 1800 mm and 600 mm high MS grill. Combination of RCC is proposed around the project as per sanctioned plan.
6.00 M & 9.0 M. Wide Cement concrete pavement with vacuum dewatered concrete is proposed around the building as per sanctioned plan.
A footpath with a PCC base, 60 mm thick paver blocks, and kerb stone edging shall be provided as per the proper standard practice in the city
Main Supply Line: Secure main water supply with adequate pressure. o Distribution: Plan vertical risers and horizontal distribution for all floors. o Sewage and Vent: -Double-stack system with vent arrangement is designed for proper disposal of sewage from the site. The water line is connected to the water source, which is tubwell,Pipelines, pumping sets, and control valves are installed to convey water from the main pump station to various parts of the building and site . The distribution network is designed to optimize flow rates, pressure levels, and water quality throughout the system.
A separate sewerage network will be provided. An R.C.C. sewer line will be installed. Manholes of 900 mm diameter will be provided as per the MEP system design. The proposed network will discharge the sewage into the existing municipal sewerage system
Storm water drainage system with ground water recharge provision (for rain water harvesting) will be provided which will be connected to the Municipal drain line as per specified plan.
As per sanctioned plan.
Many types of bushes and tree will be planted. Planted trees and bushes is the part of green area as per sanctioned plan.
A Centralized transformer, HT panel, LT panel, Feeder Pillar, and DG backup for common services like external lighting. is proposed as per sanctioned plan. L.T./L.V. line, Feeder pillar, Ip-43, Street lights, will be provided. A 600x600 mm manhole will be provided for the L.T., L.V., and H.T. lines
There is a Club house building proposed in our project with all required amenities.
A centralized sewage treatment plant has been planned in site premises.
For Waste management and garbage collection Dust-bins are proposed in open areas. After completing the project, it will be operated by the local municipal corporation.
A well-designed groundwater recharge arrangement as rainwater harvesting system shall be provided.
We will use LED lights as well assolar lightsin external areas for energy management system.
Fire norms shall be followed as per NBC and approval of the fire department which shall include the following: o Smoke detectors, heat detectors, and manual pull stations throughout the building. o Centralized monitoring with integration for emergency response. o A comprehensive wet riser & automatic sprinkler system with static underground water storage as per standards. o Hydraulically calculated pipework for adequate water supply and pressure requirements.
As per sanctioned plan.
The staircase will be provided with emergency exit doors in each floor as per fire department specifications.
Entrance lobby shall be provided & garden at Podium level is provided.
Showing 4 blocks with 119 units
Total Carpet Area
249434.93 m²
2684892.64 ft²
Total Units
1667
3 different types
Blocks & Floors
4
29 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
17911.00 m²
192792.21 ft²