Front boundary shall be redone. other are completed.
Road work shall be done after the services are completed.
walk ways shall be done after the services are completed.
water supply through 3 Borewells to underground tank. and then to overhead tank
All sewer lines to the sewage treatment plant treatd water to the sewer mains.
under construction
Land filling is being done
Land filling is being done
Electric supply shall be as per prevelant rules.
Club House proposed
Under Construction.
Under Construction.
Rain water harvesting is proposed
Solar water heating system to be installed
provision are being made as per provisional fire NOC
Gymnasium, Swimming Pool, Club house for indoor games, Green areas are proposed
Emergency Exits shall be provided
Landscaping of entire area.
Showing 3 blocks with 44 units
Total Carpet Area
10376.00 m²
111686.23 ft²
Total Units
152
3 different types
Blocks & Floors
3
18 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
13275.00 m²
142890.77 ft²