NEWActive

TARC ISHVA

GURUGRAM, GURGAON
image
image
image
image
image
image
image
09-08-2024
Launch Date
NEW
Type
2031-12-31
Completion Date

Overview

Launch Date

09-08-2024

Completion Date

2031-12-31

Configurations

3 BHK, 4 BHK

Sizes

2858 - 3883 sq.ft.

Project Size

5 Buildings - 386 units

Total Floors

38

Launch Price

20500 /sq.ft

Current Price

25000 /sq.ft

RERA ID

RERA-GRG-1704-2024

Basic Details

Project NameTARC ISHVA
Project IDRERA-GRG-1704-2024
Project TypeNEW
Applicant TypeCompany
Submission Date09-08-2024 02:34:22 PM
Builder NameTARC LIMITED
CINL70100DL2016PLC390526
PANXXXX650B
Emailajay.pathania@tarc.in
Websitehttps://www.tarc.in/
Phone (Mobile)9810585435
Phone (Landline)1141244344
Registered Address2ND FLOOR, C-3, QUTAB INSTITUTIONAL AREA ROAD, BLOCK C, KATWARIA SARAI, NEW DELHI, DELHI 110016
Project AddressSECTOR 63A GURUGRAM
DistrictGURUGRAM
TehsilGURGAON

Virtual Tour

Premium
Loading

Location

Tarc Ishva Location
Tarc Ishva Location

Layout

Loading
Tarc Ishva Master layout
Tarc Ishva Master layout

Payment Plans

Loading
TARC Ishva Payment Plan
TARC Ishva Payment Plan

Floor Plan

Loading
Configuration
Super Area
Unit Details
Carpet Area
1658 sq.ft
Built Up Area
2060 sq.ft
Carpet Efficiency
56%
Built Up Efficiency
70%
Parkings
2

Brochures

Loading

Walkthrough

Loading

Bank Details

Bank NameKOTAK MAHINDRA BANK ADDRESS AMBADEEP BUILDING, KG MARG, NEW DELHI
Account Number8947709925
IFSC CodeKKBK000172
MICR Code110485003
Branch Code000172

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)RAJEEV TREHAN ADDRESS: C-3, Qutab Institutional Area Road, Block C, Katwaria Sarai, New Delhi
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)YES

Development Details

Land Area6.9500 (Acre)
Proposed FAR3.149
Permissible FAR3.15
Total Licensed Land6.9500 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.8291
CONSTRUCTION OF ROADS3.1430
PAVEMENTS0
PARKS AND PLAYGROUNDS1.9031
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0.1606
CLUB HOUSE0.2917
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0.6225
Total6.95

Cost Details

Land Cost2540.03 Lakhs
Other Cost62217.26 Lakhs
Estimated Project Cost125948.91 Lakhs
Estimated Infrastructure Cost10426.26 Lakhs
Estimated Apartment Construction Cost50765.33 Lakhs

Documents

ELECTRICA LOAD AVAILABILITY

Uploaded on: 01-08-2024

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 09-08-2024

FOREST NOC

Uploaded on: 01-08-2024

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 09-08-2024

ASSURANCE FOR STORM WATER CONNECTION

Uploaded on: 01-08-2024

HUDA CONSTRUCTION

Uploaded on: 01-08-2024

JAMABANDI COPY

Uploaded on: 02-08-2024

AAI NOC

Uploaded on: 01-08-2024

ASSURANCE FOR SEWERAGE CONNECTION

Uploaded on: 01-08-2024

LC-IV

Uploaded on: 02-08-2024

LOI

Uploaded on: 02-08-2024

MUTATION COPY

Uploaded on: 02-08-2024

AKS-SHAJRA

Uploaded on: 02-08-2024

POWER SHIFTING LINE NOC

Uploaded on: 02-08-2024

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 09-08-2024

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 09-08-2024

BRIII

Uploaded on: 03-09-2024

T-5-E-2 ELEVATION

Uploaded on: 03-09-2024

T-5-E-2 ELEVATION

Uploaded on: 03-09-2024

NON ENCUMBRANCE CERTIFICATE

Uploaded on: 03-09-2024

T-1-P-3

Uploaded on: 03-09-2024

T-5-E-1 ELEVATION

Uploaded on: 03-09-2024

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 03-09-2024

SIZERA PLAN OVERLAP SITE PLAN

Uploaded on: 03-09-2024

E-1 ELEVATION

Uploaded on: 03-09-2024

E-2 ELEVATION

Uploaded on: 03-09-2024

TARC CA CERTIFICATE INCURRED COST

Uploaded on: 03-09-2024

TRANSFER DEED- 63 A

Uploaded on: 03-09-2024

B-2 PARKING

Uploaded on: 03-09-2024

TARC CA CERTIFICATE (INVENTORY)

Uploaded on: 03-09-2024

T-3-E-2 ELEVATION

Uploaded on: 03-09-2024

T-3-P-2

Uploaded on: 03-09-2024

T-5-P-4

Uploaded on: 03-09-2024

ZONING PLAN

Uploaded on: 03-09-2024

S-1SECTION

Uploaded on: 03-09-2024

T-1-P-2

Uploaded on: 03-09-2024

T-3-E-1 ELEVATION

Uploaded on: 03-09-2024

T-3-E-2 ELEVATION

Uploaded on: 03-09-2024

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 03-09-2024

LAND TITLE SEARCH REPORT

Uploaded on: 03-09-2024

WATER ASSURANCE PDF

Uploaded on: 03-09-2024

T-3-P-4

Uploaded on: 03-09-2024

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 03-09-2024

B-1 PARKING

Uploaded on: 03-09-2024

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 03-09-2024

T-5-P-3

Uploaded on: 03-09-2024

INFORMATION OF REVENUE DEPARTMENT

Uploaded on: 03-09-2024

C-2 SECTION

Uploaded on: 03-09-2024

T-1-P-4

Uploaded on: 03-09-2024

T-3-P-1

Uploaded on: 03-09-2024

BANK AFFIDAVIT

Uploaded on: 03-09-2024

SALE DEED

Uploaded on: 03-09-2024

C-1 SECTION

Uploaded on: 03-09-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 03-09-2024

T-1-E-1 ELEVATION

Uploaded on: 03-09-2024

T-1-E-2 ELEVATION

Uploaded on: 03-09-2024

T-1-P-1

Uploaded on: 03-09-2024

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 03-09-2024

T-3-P-3

Uploaded on: 03-09-2024

T-5-P-1

Uploaded on: 03-09-2024

T-5-P-2

Uploaded on: 03-09-2024

DEMARCATION PLAN

Uploaded on: 03-09-2024

BANK UNDERTAKING

Uploaded on: 03-09-2024

Statutory Approvals

WATER SUPPLYDate: 25-08-2023Status: ALREADY BEEN OBTAINED
SEWAGE DISPOSALDate: 23-08-2023Status: ALREADY BEEN OBTAINED
STORM WATER DRAINAGEDate: 23-08-2023Status: ALREADY BEEN OBTAINED
ELECTRICAL LOADDate: 24-11-2023Status: ALREADY BEEN OBTAINED
AIRPORT HEIGHT CLEARANCEDate: 28-03-2023Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 15-11-2022Status: ALREADY BEEN OBTAINED
POWER LINE SHIFTING NOCDate: 10-11-2022Status: ALREADY BEEN OBTAINED
HUDA CONSTRUCTIONDate: 10-10-2023Status: ALREADY BEEN OBTAINED
BUILDING PLANDate: 14-08-2024Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
SEWERAGE SYSTEMAS PER PROJECT REPORT
PARKINGAS PER PROJECT REPORT
UNDERGROUND WATER TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
STPAS PER PROJECT REPORT
ELECTRICAL SUB STATIONAS PER PROJECT REPORT

NOC

ROADSProvider: ALREADY CONNECTEDApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

AJAY SINGH PATHANIA
Name
AJAY SINGH PATHANIA
PAN
XXXX410Q
Email
ajay.pathania@tarc.in
Mobile
9810585435
Landline
1141244344
Address
575 DDA FLAT LIG POCKET 13 PHASE - 1 DWARKA SOUTH WEST DELHI DELHI -110016

Managing Director/CEO

AMAR SARIN
Name
AMAR SARIN
PAN
XXXX120J
Email
tarc@tarc.in
Mobile
9810585435
Landline
1141244344
Address
ARA FARM HOUSE CHANDAN HOLLA CHHATTARPUR DELHI-110074

Directors

MUSKAAN SARIN
Name
MUSKAAN SARIN
PAN
XXXX698A
Email
muskaan@tarc.in
Mobile
9810585435
Landline
1141244344
Address
ARA FARM HOUSE CHANDAN HOLLA CHHATTARPUR DELHI-110074
AMBARISH CHATTERJEE
Name
AMBARISH CHATTERJEE
PAN
XXXX232E
Email
tarc@tarc.in
Mobile
9810585435
Landline
1141244344
Address
A-395 SECTOR-19 NOIDA UTTAR PRADESH 201301
MIYAR RAMANATH NAYAK
Name
MIYAR RAMANATH NAYAK
PAN
XXXX456J
Email
mrnayak@outlook.com
Mobile
9810585435
Landline
1141244344
Address
1106B TOWER 1 BRIGADE PALM SPRING 24TH MAIN ROAD PUTTENAHALLI J. P. NAGAR 7TH PHASE BENGALURU-560078

Contact Details

Project ContactEmail: tarc@tarc.inMobile: 9810585435Landline: 1141244344
Project Contact PersonName: RATNADEEP PAULEmail: ratnadeep.paul@tarc.inMobile: 9958112270Landline: 1141244344

Land Details

Land Area6.9500 (Acre)
Proposed FAR3.149
Permissible FAR3.15
Total Licensed Land6.9500 (Acre)

Land Usage

Land Cost2540.03 Lakhs
Other Cost62217.26 Lakhs
Estimated Project Cost125948.91 Lakhs
Estimated Infrastructure Cost10426.26 Lakhs
Estimated Apartment Construction Cost50765.33 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres053.6182.33118.18
Electrical sub station----
Electricity Supply System0000
Other0000
Parking----
Parks and Playgrounds0000
Rain water harvesting----
Renewable energy system----
Roads & Pavements102.79102.79102.79102.79
STP06.566.566.56
Security and Fire Fighting0006.04
Security and fire and fighting----
Sewerage system----
Sewerage treatment & garbage disposal0000
Shopping area06.249.5814.26
Storm Water Drainage0000
Street Lighting----
Underground water tank0444
Water Supply System00035.54
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres114.88114.88155.6201.55
Electrical sub station--00
Electricity Supply System124.97124.97124.97124.97
Other0000
Parking36.1636.1636.1636.16
Parks and Playgrounds46.5846.5846.5846.58
Rain water harvesting2.262.262.262.26
Renewable energy system3.053.053.053.05
Roads & Pavements102.79102.79102.79102.79
STP6.566.566.566.56
Security and Fire Fighting----
Security and fire and fighting6.046.046.046.04
Sewerage system11.5211.5211.5211.52
Sewerage treatment & garbage disposal0000
Shopping area14.314.318.3122.61
Storm Water Drainage12.9412.9425.8825.88
Street Lighting2.882.882.882.88
Underground water tank4444
Water Supply System35.5435.5435.5471.08
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres86.6892.4296.95111.74
Electrical sub station029.7359.4659.46
Electricity Supply System249.93249.93249.93249.93
Other0000
Parking72.3272.3272.3272.32
Parks and Playgrounds93.1593.1593.1593.15
Rain water harvesting4.514.514.514.51
Renewable energy system6.16.16.16.1
Roads & Pavements102.79102.79205.58205.58
STP6.566.566.5613.13
Security and Fire Fighting----
Security and fire and fighting6.0412.0712.0712.07
Sewerage system23.0423.0423.0423.04
Sewerage treatment & garbage disposal0000
Shopping area8.328.869.3110.73
Storm Water Drainage25.8825.8825.8825.88
Street Lighting5.765.765.765.76
Underground water tank4448
Water Supply System71.0871.0871.0871.08
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres111.74125.32136.8168.93
Electrical sub station59.4659.4659.4689.19
Electricity Supply System249.93249.93249.93249.93
Other0000
Parking72.3272.3272.3272.32
Parks and Playgrounds93.1593.1593.1593.15
Rain water harvesting4.514.514.514.51
Renewable energy system6.16.16.16.1
Roads & Pavements205.58205.58205.580
STP13.1313.1313.1313.13
Security and Fire Fighting----
Security and fire and fighting12.0712.0712.0712.07
Sewerage system23.0423.0423.0423.04
Sewerage treatment & garbage disposal0000
Shopping area10.7312.0713.146.46
Storm Water Drainage25.8825.8825.880
Street Lighting5.765.765.765.76
Underground water tank8888
Water Supply System71.0871.0871.080
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres34.4634.46--
Electrical sub station89.1989.19--
Electricity Supply System00--
Other00--
Parking----
Parks and Playgrounds00--
Rain water harvesting----
Renewable energy system----
Roads & Pavements00--
STP----
Security and Fire Fighting----
Security and fire and fighting----
Sewerage system----
Sewerage treatment & garbage disposal00--
Shopping area3.233.23--
Storm Water Drainage00--
Street Lighting----
Underground water tank----
Water Supply System00--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILE/WOODEN FLOORING/MARBLE
WALL FINISHING DETAILSACRYLIC EMULSION PAINT
KITCHEN DETAILSSINGLE LEVER COUNTER TOP
BATHROOM FITTINGSCHINAWARE , SINGLE LEVER COUNTER TOP
WOOD WORK ETCNO
DOORS AND WINDOS FRAMESWINDOWS - ALUMINIUM POWDER-COATED SECTIONS AND FLUSH DOOR
GLASS WORKWINDOWS- ALUMINIUM POWDER-COATED SECTIONS
ELECTRIC FITTINGSFAN AND ELECTRIC POINT
CONDUCTING AND WIRING DETAILSHEAVY DUTY , MODULAR
CUPBOARD DETAILSNA
WATER STORAGEYES
LIFT DETAILS2 PASSENGER LIFTS SERVING EVERY APARTMENT
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSWINDOWS- ALUMINIUM POWDER COATED SECTIONS
DOORSFLUSH DOOR
MAIN DOORSFLUSH DOOR
INTERNAL DOORSFLUSH DOOR
AIR CONDITIONINGVARIABLE RATE FLOW SYSTEM
ELECTRICAL FITTINGSHEAVY DUTY CONDUTING MODULAR SWITCHES, C CURVE MCB
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE TEXTURE PAINT
INTERNAL FINISHINGACRYLIC EMULSION PAINT

Unit-wise Specifications

TOILET
FLOORTILE
WALLSTILE
CEILINGFALSE CEILING
COUNTERSVANITY COUNTER
SANITARY WARE/CP FITTINGSCP FITTING & CERAMIC FIXTURES
FIXTURESSINGLE LEVER COUNTER TOP
KITCHEN
FLOORMARBLE
WALLSACRYLIC EMULSION PAINT
CEILINGPOP CEILING
COUNTERSMARBLE/KOREAN
FIXTURESCP FITTING & FIXTURES
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORTILE
WALLS & CEILINGOBD PAINT
RAILINGSMETAL
FIXTURESNA
BED ROOMS
FLOORWOODEN FLOORING
WALLSACRYLIC EMULSION PAINT
CEILINGPOP CEILING
WARDROBESNO
MASTER TOILET
FLOORMARBLE
WALLSMARBLE
CEILINGFALSE CEILING
COUNTERSVANITY COUNTER
SANITARY WARE/CP FITTINGSSINGLE LEVER COUNTER TOP
FITTING/FIXTURESSINGLE LEVER COUNTER TOP
MASTER BEDROOM/DRESSROOM
FLOORWOODEN
WALLSACRYLIC EMULSION PAINT
CEILINGPOP CEILING
MODULAR WARDROBESNO
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORMARBLE
WALLSACRYLIC EMULSION PAINT
CEILINGPOP CEILING
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORTILE
WALLS & CEILINGOBD PAINT
TOILETTILE
BALCONYTILE

Fee Details

Payment 1
amount:1775000
cheque no:589017
draft date:06-07-2024
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK
Payment 2
amount:887000
cheque no:589016
draft date:06-07-2024
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK
Payment 3
amount:886500
cheque no:589027
draft date:19-08-2024
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK
Payment 4
amount:27000
cheque no:589031
draft date:27-08-2024
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK
TARC ISHVA by TARC LIMITED | ReraTracker