Launch Date
Completion Date
RERA ID
26.901786
26.901659
This is single plot rectangle shaped, having total 1 number of exit gate from the 9 meter wide front road and 7 meter internal road. site is surrender by the other on one side.
1.8-2.1 meter high nad 230mm thick boundary wall design. MS board entrance and exit gates are developed with boundary.
concrete road with high quality concrete rigid pavers will be used as per design suggest by the architect fir internal road.
all internal road will have narrow footpath red sand stone pavers or equipment finishes.
Ground water may also be used, also end user shall be used there individual RO System as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity.
Centralized Sewerage system shall be provided. All sewerage water shall be go to the STP for treatment after treatment, water shall be recycle and it will use in gardening, Flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal Sewerage system
Storm water system shall be provided. Storm water from roads and other landscape area shall be connect to the storm water drain channel and go to the rain water harvesting Pit for recharge the ground water and overflow shall be connect with municipal drain line.
N.A.
Tree plantation shall be as per norms applicable.
We have designed thew system as per local electricity board and consider centralized transformer, HT panel, LT panel, feeder pillar and DG back for common service like external lighting.
N.A.
Centralized sewerage system shall be provided. all sewerage water shall be go to the STP for treatment after treatment, water shall be recycle at it will be use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the municipal sewerage system.
There is proper garbage collection area provided for the solid waste management.
A well designed rain water harvesting system shall be provided for the whole building complex to conserve water.
We will use LED lights fitting in external area as well as solar lights. in STP and pump room all the equipment shall have energy efficient motor.
All the fire norms shall be followed as NBC and approval of fire department.
Water for domestic use and flushing go down through gravity from domestic as well as flushing tanks. all sewerage shall be go to the STP for recycling the water. Storm water for roof, roads and other area shall be connect to the storm water drain channel and go to the rain water harvesting Pit for recharge the ground water and overflow shall be connect with Municipal drain.
Fire staircase provided in each block.
N.A.
Showing 2 blocks with 14 units
Total Carpet Area
6992.40 m²
75265.49 ft²
Total Units
240
1 different types
Blocks & Floors
2
7 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4465.14 m²
48062.32 ft²