Launch Date
Completion Date
RERA ID
26.773003
81.001122
With 230mm common Brick wall. 150mm above the Road level- Approximately 5200 Rmt
Refurbishing of existing RCC Column & Beam with Brick in fills. Approximately 950 Rmt
One Layer (200mm) of GSB & One Layer (150mm) of WMM, One Layer of DLC (100mm) and 60mm thick Concrete Paver over Sand bed. – Approximately 1424 Rmt
60mm thick Concrete paver with sand bed over compacted Brick Jelly base. Approximately 2800 Rmt
Internal supply network with HDPE / MDPE pipes of adequate size. The main supply of water shall be sourced by Township Developer, M/s. Ansal Properties & Infrastructure Ltd. Approximately 2000 Rmt.
Internal sewer network as per G.O.I. manuals to which all plots will be connected through chambers & ultimately connected to the trunk sewer network of Sushant Golf City. Approximately 1100 Rmt
The roof top water shall be collected through manholes connected with DWC pipes and guided to Rain Water Harvesting Pits. The surface run-off shall be collected through chambers and DWC pipes and finally connected to Township level Trunk Lines for STORM water. Approximately 2200 Rmt.
All the parks and green areas shall be developed with required pathways, Grass, shrubs, plants along with play areas for children and Open Gym area for adults. (Approximately 4570 SQM)
Enough trees will be planted in Parks, Green Areas and along the roadsides.
Based on the Electricity Code-2005 and subsequent amendments to this code of Govt. of Uttar Pradesh the load of this development will be worked out & substation will be provided as per regulations.
NIL. The community buildings provided by the master developer at the township level for the population of this development as well.
The sewage and sullage water will be treated in the township level operational. S.T.P (designed capacity of 23MLD)
Both, the dry & wet garbage generated will be handed over to the maintenance agency of the township for further disposal by the licensed garbage disposal agency hired by them for such processing.
Rainwater Harvesting Pits are proposed in the development areas and the rooftop water is guided to these pits through pipes and collection chambers. Overflow of the Rainwater Harvesting Pits will be disposed in the storm water network which in turn will be connected to the township trunk drainage network.
Sensor based Street lights are proposed.
Fire hydrants are proposed in the development areas as per the guidelines of fire department.
This development is an integral part of SUSHANT GOLF CITY and all such facilities for the population of this development are provided at township level by the promoter of SUSHANT GOLF CITY.
This is a plotted development. However, green areas are provided with lawns, etc. where residents can assemble in the event of any emergency.
NA
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
46389.34 m²
499330.25 ft²