Launch Date
Completion Date
RERA ID
26.4758
81.0059
Plot demarcation is one of the earliest activity it defines property boundaries, parcel shapes and plot location. That the owner of the property is interested to know concerns the boundaries of his/her plot/property. In this project all plots are well demarcated as per approved plan and easy for physical handing over the plots.
A boundary wall is "any wall constructed on, above, or over the physical border between two properties so that is stands on or occupies space on both properties at least partially". The boundary wall offers the property and its occupants a sense of protection and security. Height Specification of the boundary wall of this project is "height of the boundary wall will be 2100MM and width of the boundary wall will be 230MM.
Project has 9 mtrs 7.5 mtrs internal road. the approach to the plot in throughout of the site is well managed for vehicle/pedestrian movement has been designed to minimize conflicts between vehicles and pedestrians. Maximum utilization of the site has been planned. Every plot is provided with approach from vehicular road. Pedestrian pathways which are traffic free connect the plots with the road as well as make the movement uninterrupted. In this project we provide metal road with bituminous cove/ high strength concrete pavers/tiles will be used as per designed by the architect for internal road. In this project one entry gate from 45 mtrs wide road and one exit gate from 12 mtrs wide road (including nala).
Comfort, Continuity, and safety are the governing criteria for the design and construction of pedestrian facilities. A footpath is a type of route designed just for pedestrians and not for other types of traffic such as cars or bicycles. We will provide footpath as per design and the requirement .
Safe drinking water, sanitation, and hygiene are fundamental to improving standards of living for people. In our project ground water will be used. End user shall use their individual RO system as per their requirement. All plot owners will mandatory, have ball cock in their water tank to stop overflow and avoid wastage of water.
The sewerage system is an essential part of every human settlement. Since combined sewerage system invariably suffers from main disadvantage of sluggish flow during most period of the year leading to deposition of sewage solids creating foul and offensive conditions, hence sewerage and drainage systems shall be proposed separately. Since, it is both difficult and uneconomical to augment the capacity of the sewerage system later, the proposed sewers shall be designed for maximum expected discharge to cater the requirement of the ultimate development of the said project. Sewage Treatment plant shall be proposed for the treatment of sewage that would generate in the Normal housing. Sewage treatment plants process and treat wastewater/sewage, breaking it down into a cleaner "effluent" that can be returned back to nature in a safer, eco-friendly form. they help restore groundwater balance, curb diseases and stop degradation and pollution of the environment. Centralized sewerage system shall be provided to reduce the fresh water demand of the project, waste water from the Normal Housing units will be treated in a STP and recycled for landscaping.
A detailed storm water drainage system and water harvesting procedures are proposed to recharge groundwater. The prime activities for providing Drainage System comprise of; Internal Drainage System. Ultimate Disposal Norms Adopted. In order to determine total run off, Rational formula shall be used . Underground water recharge pits with perforated filter media shall be used for rain water harvesting. Coefficient of run off shall be adopted as per Manual on Rain harvesting and conservation.
There is four lush green parks, green space and open space in the form of park and garden for every age group as per architect plan. There are several instances where the green cover has been reported the ambient temperatures.
There will be various types of plants as per architect plan. Evergreen plants are proposed to be planted inside the site. Parks shall be developed by the project prominent. Variety of plants shall be provided for the project for along with the roads/ walkway and also in green area.
We have designed the system as per local electricity board along with transformer, HT Panel, LT Panel, Feeder pillar and DG back for common service like external lighting, STP, Pump room etc.
Not Applicable
Sewage treatment plant (STP) will be provided as per architect plan. An sewage network shall collect the sewage and flow by gravity to the proposed sewage treatment plant. Sludge generated from STP shall be rich in organic content and act as excellent fertilizer.
There is proper garbage collection area as per architect plan for the solid waste management. Project will adopt a systematic approach for solid waste collection and disposal. The solid waste shall be first segregated as per plastic, glass. paper and other waste separately.
A well designed rain water harvesting system as per architect plan shall be provided for parks to conserve water. The project is also committed towards conservation of water, this includes use of treated water, rainwater harvesting, provision of low water flow fixtures and raising awareness on means of water conservation.
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
21577.00 m²
232252.67 ft²