We have one net plot area of size 1515 sqm , having 2 main entrance and 2 exit gate from the front road, Demarcated by its boundaries -North - 31.20 m , South - 31.50 m, East - 27.80 m, West - 27.50 m
6 feet height and 230mm thick rcc/ms 1 section work which give a beautiful iconic design boundary wall to be made with 4 number of gates.
FROM THE MAIN ENTRANCE /EXIT GATE WE HAVE 100MM THICK , 6 MTR WIDE RCC ROAD THROUGH OUT THE PROJECT.
WE WOULD PROVIDE FOOTHPATH THROUGH 5 FEET WIDE CC .
OVERHEAD TANK (15000 LITRES), BOREWELL, GOVERNMENT WATER SUPPLY . EACH FLOOR WILL HAVE SEPARATE DRINKING WATER FACILITIES. WE WILL PROVIDE PUMPS FOR THE REQUIREMENTS OF BLOCKS THROUGH PIPELINES.
4 INCH PVC PIPELINE CONNECTED WITH 6INCH PIPELINE TO MAN HOLES. MODULAR SEWERAGE SSYETM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND SFTER TERATMENTS RE-USE IN FLUSH AND GARDEN . OVERFLOW FROM THE STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSYTEM. WHEN COME INTO FORCE..
RECHARGE WELL AND WASTE WATER PIPELINE TO BE CONNECT IN NEARBY GOVERNMENT PROVIDED MAIN HOLE. STORM WATER SHALL BE PROVIDED. STORM WATER FROM TERACES, ROADS, AND OTHER LANDSCAPE AREA SHALL BE CONNECT TO THE STORM WATER DRAIN CHANNEL AND GO TO THE RAIN WATER HARVESTING PIT FOR RECHARGE THE GROUND WATER AND OVERFLOW SHALL E CONNECT WITH MUNICIPAL DRAIN LINE.
NA
WE WILL PROVIDE 4 NUMBER TREES ALL ALONG THE BOUNDARY WALL AND GREEN AREA.
ELECTRICITY SUPPLY WILL BE PROVIDED AS PER SERVICE DRAWINGS , STREET LIGHTING NOT REQUIRED.WE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOARD AND WILL CONSIDER CENTRALIZED , TRANSFORMER, HT PANEL, LT PANEL, FEEDER PILLER AND DG BACK FOR COMMON SERVICES LIKE EXTERNAL LIGHTING, FOUNTAIN, STP, PUMP ROOM ETC.
NA
AS PER SERVICE PLAN TO BE CONNECT INTO GOVERNMENT AVAILED SEWER LINE. MODULAR SEWERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND SFTER TREATMENT RE-USE IN FLUSH . OVERFLOW FROM STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSTEM. WHEN COME INTO FORCE.
TO BE PROVIDED AS PER GOVERNMENT GUIDELINES. SOLID WASTE TO BE COLLECTED FROM STORED IN GARBAGE ROOM.
WE WILL SUGGEST TO INDIVIDUAL TO USE LOW FLOW FIXTURES AS WELL DUAL FLUSH CISTERN AND RAW WATER HARVESTING SYSTEM WILL BE PROVIDED TO REDUCE THE WATER CONSUMPTION AND IMPROVE THE GROUND WATER LEVEL.
NA
PROVISIONAL NOC HAS BEEN RECEIVED FROM FIRE DEPARTMENT AND ALL PROVISIONS SHALL BE MADE AS PER PROVISIONAL NOC AND DRAWING SUBMITTED TO THE FIRE DEPARTMENT. FIRE FIGHTING SYSTEM, FA SYSTEM AS WILL BE PROVIDED LOCAL AUTHORITIES REQUIREMENT.
TOILET BLOCK, CLENA DRINKING WATER, FIRSTAID BOX.
WE WILL HAVE FIRE STAIRCASES WHICH WILL BE PROVIDED WITH EMERGENCY EXIT DOORS , SHALL BE PROVIDED AS PER FIRE DEPARTMENT PROVISIONAL NOC.
At this stage all the development plans have already been shared above by us if there will be any further development it will be reported in future.
Showing 1 blocks with 4 units
Total Carpet Area
1759.65 m²
18940.70 ft²
Total Units
4
1 different types
Blocks & Floors
1
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1515.00 m²
16307.31 ft²