NEWActive

SOBHA CITY PHASE IV

GURUGRAM, GURGAON
31-12-2018
Launch Date
NEW
Type
2024-12-31
Completion Date

Overview

Launch Date

31-12-2018

Completion Date

2024-12-31

RERA ID

RERA-GRG-139-2018

Basic Details

Project NameSOBHA CITY PHASE IV
Project IDRERA-GRG-139-2018
Project TypeNEW
Applicant TypeCompany
Submission Date31-12-2018 02:12:06 AM
Builder NameSOBHA LTD.
CINL45201KA1995PLC018475
PANXXXX723E
Emailharyana.rera@sobha.com
Websitehttps://www.sobha.com/
Phone (Mobile)9871196826
Phone (Landline)8049320000
Registered AddressSOBHA, SARJAPUR-MARATHALLI OURE RING ROAD, BANGLORE- 560103
Project AddressSECTOR-108, GURUGRAM
DistrictGURUGRAM
TehsilGURGAON

Location

Brochures

Loading

Bank Details

Bank NameSTANDARD CHARTERED BANK, KORAMANGALA, BENGALORE
Account Number45505402166
IFSC CodeSCBL003607
MICR Code560036002
Branch Code036073

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr. J C Sharma (Managing Director) Mr. Subhash Mohan Bhat (Chief Financial Officer) Mr. Vigneshwar G Bhat (Company Secretary) Mr. Ramesh Babu K (Vice President – Finance) Mr. M Radhakrishnan (Deputy General Manager) Mr. Chandrashekhar Gowda (Senior Manager – Finance) Ms. Lakshmi Anand (Senior Manager- Internal Audit), SOBHA Limited, Sarjapur-Marathahalli, Outer Ring Road (ORR), Devarabisanahalli, Bellandur Post, Bangalore KA 560103.
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Yes

Development Details

Land Area2.6778 (Acre)
Proposed FAR0.16
Permissible FAR1.75
Total Licensed Land39.375 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.5129
CONSTRUCTION OF ROADS0.47516
PAVEMENTS0
PARKS AND PLAYGROUNDS0.81689
GREEN BELTS0
VEHICLE PARKINGS0.15443
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0.7184
Total2.67778

Cost Details

Land Cost5730 Lakhs
Other Cost20110 Lakhs
Estimated Project Cost40470 Lakhs
Estimated Infrastructure Cost368 Lakhs
Estimated Apartment Construction Cost14262 Lakhs

Documents

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 28-12-2018

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 28-12-2018

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 29-12-2018

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 29-12-2018

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 29-12-2018

DEMARCATION PLAN

Uploaded on: 29-12-2018

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 29-12-2018

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 29-12-2018

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 25-03-2019

ZONING PLAN

Uploaded on: 25-03-2019

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 25-03-2019

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 25-03-2019

Statutory Approvals

LICENCEDate: 27-05-2008Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 23-10-2013Status: ALREADY BEEN OBTAINED
NATURAL CONSERVATION ZONE NOCDate: 05-11-2013Status: ALREADY BEEN OBTAINED
AIRPORT HEIGHT CLEARANCE NOCDate: 24-11-2017Status: ALREADY BEEN OBTAINED
HUDA CONSTRUCTION WATER NOCDate: 03-04-2017Status: ALREADY BEEN OBTAINED
ELECTRICAL LOAD AVAILABILITYDate: 06-10-2016Status: ALREADY BEEN OBTAINED
ENVIRONMENTAL CLEARANCEDate: 29-08-2017Status: ALREADY BEEN OBTAINED
CONSENT TO ESTABLISHDate: 30-11-2017Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVALDate: 24-05-2017Status: ALREADY BEEN OBTAINED
SERVICES ESTIMATES AND PLANSDate: 12-03-2018Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERYET TO BE PREPARED
UNDERGROUND TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
STPAS PER PROJECT REPORT

NOC

ROADSProvider: HUDAApproval Status: Approved
WATER SUPPLYProvider: HUDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HUDAApproval Status: Approved
STORM WATER DRAINAGEProvider: HUDAApproval Status: Approved

Project Team

Authorized Representative

MR JAGADISH NANGINENI
Name
MR JAGADISH NANGINENI
PAN
XXXX886F
Email
Jagadish.nangineni@sobha.com
Mobile
9871196826
Landline
01244855555
Address
912 Ivory Tower Unitech- Retreat South City-1 Gurgaon- 122002

Managing Director/CEO

MR JAGDISH CHANDRA SHARMA
Name
MR JAGDISH CHANDRA SHARMA
PAN
XXXX940E
Email
mdsoffice@sobha.com
Mobile
9880034885
Landline
08049320000
Address
B-2 291 Sobha Ivory No 71 St. Johns Road Bangalore-560042

Directors

MR RAMACHANDRA VENKATASUBBA RAO
Name
MR RAMACHANDRA VENKATASUBBA RAO
PAN
XXXX157L
Email
rvsraoin@yahoo.com
Mobile
9845014688
Landline
08049320000
Address
3326 GURU KRIPA 14TH MAIN RMV-SADASHIVANAGAR BANGALORE 560080
MR SAIBAL KANTI GUPTA
Name
MR SAIBAL KANTI GUPTA
PAN
XXXX633J
Email
saibalkgupta@gmail.com
Mobile
9480693998
Landline
08049320000
Address
No. 14 Singapore Gardens Kanakapura Road Doddakalasandra PO Bangalore - 560 062
MR ANUP SANMUKH SHAH
Name
MR ANUP SANMUKH SHAH
PAN
XXXX340N
Email
anup@anupshahlawfirm.com
Mobile
9886127835
Landline
08049320000
Address
1296th Main P and T Colony.sanjay Nagar. Bangalore 560094
MS PUNITA KUMAR SINHA
Name
MS PUNITA KUMAR SINHA
PAN
XXXX631M
Email
officeofpunitakumarsinha@gmail.com
Mobile
9833363533
Landline
08049320000
Address
51 Gate House Road Newton MA Massachusetts 024671320 United States of America

Contact Details

Project ContactEmail: scg.rera@sobha.comMobile: 9870429922Landline: 01244855555
Project Contact PersonName: JOBY FRANCISEmail: joby.francis@sobha.comMobile: 8800389988Landline: 01244855555

Land Details

Land Area2.6778 (Acre)
Proposed FAR0.16
Permissible FAR1.75
Total Licensed Land39.375 (Acre)

Land Usage

Land Cost5730 Lakhs
Other Cost20110 Lakhs
Estimated Project Cost40470 Lakhs
Estimated Infrastructure Cost368 Lakhs
Estimated Apartment Construction Cost14262 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting----
Renewable Energy System----
Roads & Pavements0000
STP0000
STREET LIGHTING----
STREETLIGHTING----
Security and Fire Fighting----
Security and Fire Fighting Services----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Light----
Underground Tank----
Water Supply System0000
2020 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting-000
Renewable Energy System----
Roads & Pavements5566
STP00--
STREET LIGHTING----
STREETLIGHTING----
Security and Fire Fighting--00
Security and Fire Fighting Services----
Sewerage treatment & garbage disposal2233
Shopping area0000
Storm Water Drainage1123
Street Light-011
Underground Tank000-
Water Supply System5566
2021 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting0---
Renewable Energy System----
Roads & Pavements6666
STP----
STREET LIGHTING----
STREETLIGHTING----
Security and Fire Fighting----
Security and Fire Fighting Services0000
Sewerage treatment & garbage disposal4433
Shopping area0000
Storm Water Drainage3333
Street Light2322
Underground Tank----
Water Supply System6666
2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting----
Renewable Energy System----
Roads & Pavements6677
STP----
STREET LIGHTING----
STREETLIGHTING----
Security and Fire Fighting----
Security and Fire Fighting Services0000
Sewerage treatment & garbage disposal4444
Shopping area0000
Storm Water Drainage3344
Street Light2333
Underground Tank----
Water Supply System6677
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds1111
Rain Water Harvesting----
Renewable Energy System--00
Roads & Pavements6777
STP----
STREET LIGHTING----
STREETLIGHTING----
Security and Fire Fighting----
Security and Fire Fighting Services0000
Sewerage treatment & garbage disposal4444
Shopping area0000
Storm Water Drainage3322
Street Light10--
Underground Tank----
Water Supply System6777
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting----
Renewable Energy System0000
Roads & Pavements3210
STP----
STREET LIGHTING00--
STREETLIGHTING--00
Security and Fire Fighting----
Security and Fire Fighting Services0000
Sewerage treatment & garbage disposal6410
Shopping area0000
Storm Water Drainage3210
Street Light----
Underground Tank----
Water Supply System81210

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSELAMINATED WOODEN FLOORING AND SKIRTING / VITRIFIED TILE FLOORING AND SKIRTING /CERAMIC TILE.
WALL FINISHING DETAILSFOR INTERNAL WALLS, PLASTIC EMULSION PAINT / CERAMIC WALL TILING WHEREVER APPLICABLE & TEXTURED PAINT FOR EXTERNAL WALLS.
KITCHEN DETAILSCERAMIC TILE FLOORING, WALL TILING & PLASTIC EMULSION PAINT FOR CEILING.
BATHROOM FITTINGSREPUTED MAKE OF CP FITTINGS & SANITARY WARE.
WOOD WORK ETC-
DOORS AND WINDOS FRAMESFRAME – TIMBER FRAME & SHUTTERS – WITH BOTH SIDE MASONITE SKIN.
GLASS WORK-
ELECTRIC FITTINGSFITTING OF REPUTED MAKE APPROVED BY ISI & IS SPECIFICATION.
CONDUCTING AND WIRING DETAILSPVC CONDUITS AND COPPER CABLES OF REPUTED MAKE AS PER ISI AND IS SPECIFICATION.
CUPBOARD DETAILS-
WATER STORAGECOMMON UGR OF 690 KL.
LIFT DETAILSCAPACITY - 2 NOS. OF 8 PASSENGER LIFT OF REPUTED MAKE IN ALL TOWERS.
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSHEAVY-DUTY ALUMINIUM GLAZED SLIDING WINDOWS & FRENCH WINDOWS MADE FROM SPECIALLY DESIGNED AND MANUFACTURED SECTIONS.
DOORSNA
MAIN DOORSFRAME – TIMBER. SHUTTERS – WITH BOTH SIDE MASONITE SKIN.
INTERNAL DOORSMAIN DOOR & BEDROOM DOORS • FRAME – TIMBER. • SHUTTERS – WITH BOTH SIDE MASONITE SKIN. TOILET DOOR • FRAME – TIMBER SHUTTERS –WITH OUTSIDE MASONITE AND INSIDE LAMINATE.
AIR CONDITIONINGPOWER CONNECTION MADE AVAILABLE FOR SPLIT AC IN LIVING, DINING AND ALL THE BED ROOMS.
ELECTRICAL FITTINGSFITTINGS OF REPUTED MAKE APPROVED BY ISI & IS SPECIFICATION
CNG PIPE LINE-
PROVISION OF WIFI AND BROADBAND FACILITYCONDUIT PROVISION FOR DEDICATED INTERNET CONNECTION MADE AVAILABLE WITH RJ-45 SOCKET OUTLET IN ONE OF THE BEDROOMS.
EXTERNAL FINISHING/COLOUR SCHEMEALL WALLS PAINTED IN TEXTURED PAINT.
INTERNAL FINISHINGPLASTIC EMULSION PAINT FOR WALLS & CEILING.

Unit-wise Specifications

TOILET
FLOORSUPERIOR QUALITY CERAMIC TILE FLOORING.
WALLSSUPERIOR QUALITY CERAMIC WALL TILING UP TO FALSE CEILING.
CEILINGFALSE CEILING WITH GRID PANELS.
COUNTERSNATURAL / ENGINEERED STONE VANITY COUNTERS.
SANITARY WARE/CP FITTINGSEUROPEAN WATER CLOSET WALL HUNG, COUNTER TOP WASH BASIN
FIXTURESCHROMIUM PLATED FITTINGS :- S/L DIVERTER BATH SPOUT OVERHEAD SHOWER S/ L BASIN MIXER ANGULAR STOP COCK HEALTH FAUCET CP P-TRAP WASTE COUPLING METRO POLE FLUSH VALVE COCKROACH TRAP GEYSER – HORIZONTAL OF 25 LTR CAPACITY
KITCHEN
FLOORSUPERIOR QUALITY CERAMIC TILE FLOORING.
WALLSSUPERIOR QUALITY CERAMIC TILING UP TO CEILING.
CEILINGPLASTIC EMULSION PAINT FOR CEILING.
COUNTERS-
FIXTURESSINK MIXER (WALL MOUNTED) SINGLE BOWL SINGLE DRAIN SS SINK IN UTILITY 2 IN 1 BIB COCK IN UTILITY ANGULAR STOP COCK COCKROACH TRAP BIB COCK WITH NOZZLE IN LIVING / DINING SIT OUT (WHEREVER APPLICABLE
KITCHEN APPLIANCES-
SIT-OUTS
FLOORSUPERIOR QUALITY CERAMIC TILE FLOORING AND SKIRTING.
WALLS & CEILINGPLASTIC EMULSION PAINT FOR CEILING. ALL WALLS PAINTED IN TEXTURED PAINT
RAILINGSNATURAL / ENGINEERED STONE COPING FOR PARAPET/MS HANDRAIL AS PER DESIGN.
FIXTURES-
BED ROOMS
FLOORSUPERIOR QUALITY VITRIFIED TILE FLOORING AND SKIRTING.
WALLSPLASTIC EMULSION PAINT FOR WALLS.
CEILINGPLASTIC EMULSION PAINT FOR CEILING.
WARDROBES-
MASTER TOILET
FLOORSUPERIOR QUALITY CERAMIC TILE FLOORING.
WALLSSUPERIOR QUALITY CERAMIC WALL TILING UP TO FALSE CEILING
CEILINGFALSE CEILING WITH GRID PANELS.
COUNTERSNATURAL/ENGINEERED STONE VANITY COUNTERS.
SANITARY WARE/CP FITTINGSEUROPEAN WATER CLOSET WALL HUNG, COUNTER TOP WASH BASIN
FITTING/FIXTURESCHROMIUM PLATED FITTINGS :- S/L DIVERTER BATH SPOUT WITH BUTTON OVERHEAD SHOWER TELEPHONIC SHOWER S/ L BASIN MIXER ANGULAR STOP COCK HEALTH FAUCET CP P-TRAP WASTE COUPLING METRO POLE FLUSH VALVE COCKROACH TRAP GEYSER – HORIZONTAL OF 25 LTR CAPACITY
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORING AND SKIRTING.
WALLSPLASTIC EMULSION PAINT FOR WALLS.
CEILINGPLASTIC EMULSION PAINT FOR CEILING.
MODULAR WARDROBES-
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORSUPERIOR QUALITY VITRIFIED TILE FLOORING AND SKIRTING.
WALLSPLASTIC EMULSION PAINT FOR WALLS.
CEILINGPLASTIC EMULSION PAINT FOR CEILING.
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOOR-
WALLS & CEILING-
TOILET-
BALCONY• SUPERIOR QUALITY CERAMIC TILE FLOORING AND SKIRTING. • NATURAL / ENGINEERED STONE COPING FOR PARAPET/MS HANDRAIL AS PER DESIGN. • PLASTIC EMULSION PAINT FOR CEILING. ALL WALLS PAINTED IN TEXTURED PAINT.

Fee Details

Payment 1
amount:653792
cheque no:17309
draft date:21-12-2018
payable to:HRERA Gurugram
payee bank:AXIS BANK LIMITED
Payment 2
amount:373595
cheque no:17575
draft date:08-02-2019
payable to:HRERA Gurugram
payee bank:AXIS BANK