ONGOINGActive

SOBHA CITY, PHASE-1, PART-2

GURUGRAM, GURGAON
29-11-2019
Launch Date
ONGOING
Type
2022-05-01
Completion Date

Overview

Launch Date

29-11-2019

Completion Date

2022-05-01

RERA ID

RERA-GRG-376-2019

Basic Details

Project NameSOBHA CITY, PHASE-1, PART-2
Project IDRERA-GRG-376-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date29-11-2019 04:31:31 AM
Builder NameSOBHA LIMITED
CINL45201KA1995PLC018475
PANXXXX723E
Emailharyana.rera@sobha.com
Websitehttps://www.sobha.com/
Phone (Mobile)0804932000
Phone (Landline)0804932000
Registered AddressSOBHA, SARJAPUR-MARATHAHALLI OUTER RING ROAD (ORR) DEVARABISANAHALLI, BELLANDUR POST, BANGALORE KA 560103
Project AddressREVENUE ESTATE OF BABUPUR VILLAGE, VILLAGE BABUPUR, SECTOR-108, GURUGRAM, HARYANA
DistrictGURUGRAM
TehsilGURGAON

Location

Brochures

Loading

Bank Details

Bank NameSTANDARD CHARTERED BANK, KORAMANGALA, BANGALORE
Account Number45505376092
IFSC CodeSCBL0036073
MICR Code560036002
Branch Code036073

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr. J C Sharma (Managing Director) Mr. Subhash Mohan Bhat (Chief Financial Officer) Mr. Vigneshwar G Bhat (Company Secretary) Mr. Ramesh Babu K (Vice President – Finance) Mr. M Radhakrishnan (Deputy General Manager) Mr. Chandrashekhar Gowda (Senior Manager – Finance) Ms. Lakshmi Anand (Senior Manager- Internal Audit)
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Already Attached

Development Details

Land Area0.76635 (Acre)
Proposed FAR0.22813
Permissible FAR1.75
Total Licensed Land39.375 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.41927
CONSTRUCTION OF ROADS0
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0.34708
Total0.76635

Cost Details

Land Cost5345 Lakhs
Other Cost14917 Lakhs
Estimated Project Cost33904 Lakhs
Estimated Infrastructure Cost342.95 Lakhs
Estimated Apartment Construction Cost13299 Lakhs

Documents

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 25-11-2019

DEMARCATION PLAN

Uploaded on: 26-11-2019

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 29-11-2019

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 26-11-2019

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 26-11-2019

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 26-11-2019

ZONING PLAN

Uploaded on: 26-11-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 26-11-2019

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 29-11-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 25-11-2019

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 25-11-2019

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 26-11-2019

SERVICE PLAN APPROVAL LETTER

Uploaded on: 21-01-2020

LC-IV

Uploaded on: 21-01-2020

NON ENCUMBRANCE CERTIFICATE

Uploaded on: 21-01-2020

LOI

Uploaded on: 21-01-2020

ENVIRONMENT CLEARANCE

Uploaded on: 21-01-2020

FOREST NOC

Uploaded on: 21-01-2020

AIRPORT HEIGHT CLEARANCE

Uploaded on: 21-01-2020

SERVICE ESTIMATES PLAN

Uploaded on: 21-01-2020

BUILDING PLAN APPROVAL

Uploaded on: 21-01-2020

ASSIGNMENT OF DEVELOPMENT RIGHT

Uploaded on: 21-01-2020

BOARD RESOLUTION FOR OPERATING BANK ACCOUNT

Uploaded on: 21-01-2020

FIRE NOC

Uploaded on: 21-01-2020

Statutory Approvals

SERVICE ESTIMATES PLANDate: 12-03-2019Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVALDate: 24-05-2017Status: ALREADY BEEN OBTAINED
CONSENT TO ESTABLISHDate: 30-11-2017Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 29-08-2017Status: ALREADY BEEN OBTAINED
ELECTRICAL LOAD AVAILABILITYDate: 06-10-2016Status: ALREADY BEEN OBTAINED
HUDA CONSTRUCTION WATER NOCDate: 30-04-2017Status: ALREADY BEEN OBTAINED
AIRPORT HEIGHT CLEARANCEDate: 24-11-2017Status: ALREADY BEEN OBTAINED
NATURAL CONSERVATION ZONE NOCDate: 05-11-2013Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 30-10-2013Status: ALREADY BEEN OBTAINED
LICENCEDate: 27-05-2008Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: No
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED

NOC

ROADSProvider: HSVPApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

MR JAGADISH NANGINENI
Name
MR JAGADISH NANGINENI
PAN
XXXX886F
Email
Jagadish.nangineni@sobha.com
Mobile
9871196826
Landline
01244855555
Address
912 Ivory Tower Unitech- Retreat South City-1 Gurgaon- 122002

Managing Director/CEO

MR JAGDISH CHANDRA SHARMA
Name
MR JAGDISH CHANDRA SHARMA
PAN
XXXX940E
Email
mdsoffice@sobha.com
Mobile
9880034885
Landline
08049320000
Address
B-2 291 Sobha Ivory No 71 St. Johns Road Bangalore-560042

Directors

MR RAMACHANDRA VENKATASUBBA RAO
Name
MR RAMACHANDRA VENKATASUBBA RAO
PAN
XXXX157L
Email
rvsraoin@yahoo.com
Mobile
9845014688
Landline
08049320000
Address
3326 GURU KRIPA 14TH MAIN RMV-SADASHIVANAGAR BANGALORE 560080
MR ANUP SANMUKH SHAH
Name
MR ANUP SANMUKH SHAH
PAN
XXXX340N
Email
anup@anupshahlawfirm.com
Mobile
9886127835
Landline
0804242300
Address
129 6th Main P and T Colony.sanjay Nagar. Bangalore 560094
MR T P SEETHARAM
Name
MR T P SEETHARAM
PAN
XXXX976M
Email
tpseetharam@gmail.com
Mobile
0804242300
Landline
0804242300
Address
Apartment No 1011 Casa Paradiso Sobha City Chokanahalli Village Bangalore 560064
MR SUMEET JAGDISH PURI
Name
MR SUMEET JAGDISH PURI
PAN
XXXX211J
Email
sumeet@samyayacap.com
Mobile
8049320000
Landline
08049320000
Address
Flat No 2 Building No 1 Malabar Hill Mumbai 400006

Contact Details

Project ContactEmail: scg.rera@sobha.comMobile: 9870429922Landline: 01244855555
Project Contact PersonName: JOBY FRANCISEmail: joby.francis@sobh.comMobile: 8800389988Landline: 1244855555

Land Details

Land Area0.76635 (Acre)
Proposed FAR0.22813
Permissible FAR1.75
Total Licensed Land39.375 (Acre)

Land Usage

Land Cost5345 Lakhs
Other Cost14917 Lakhs
Estimated Project Cost33904 Lakhs
Estimated Infrastructure Cost342.95 Lakhs
Estimated Apartment Construction Cost13299 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Street Light6
Shopping area0
Roads & Pavements26
Water Supply System30
Storm Water Drainage12
Parks and Playgrounds1
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal17

Quarterly Infrastructure Expenditure

2017 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0--0
Electricity Supply System0--0
Other0--0
Parks and Playgrounds0--0
Roads & Pavements0--0
Sewerage treatment & garbage disposal0--0
Shopping area0--0
Storm Water Drainage0--0
Street Light0--0
Water Supply System0--0
2018 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Light0000
Water Supply System0000
2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0.26000.26
Roads & Pavements7.62007.73
Sewerage treatment & garbage disposal4.88004.95
Shopping area0000
Storm Water Drainage3.6003.66
Street Light1.67001.7
Water Supply System8.81008.94
2020 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0.260.260.260.26
Roads & Pavements7.627.597.587.57
Sewerage treatment & garbage disposal4.884.864.854.85
Shopping area0000
Storm Water Drainage3.63.593.593.58
Street Light1.671.671.661.66
Water Supply System8.818.788.778.76
2021 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0.120.290.290.13
Roads & Pavements3.478.658.633.79
Sewerage treatment & garbage disposal2.225.545.532.43
Shopping area0000
Storm Water Drainage1.644.094.081.79
Street Light0.761.91.890.83
Water Supply System4.0210.019.984.39
2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-0--
Electricity Supply System-0--
Other-0--
Parks and Playgrounds-0.03--
Roads & Pavements-0.97--
Sewerage treatment & garbage disposal-0.62--
Shopping area-0--
Storm Water Drainage-0.46--
Street Light-0.21--
Water Supply System-1.13--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEFOR TOWER A2 AND B2:- LAMINATED WOODEN FLOORING AND SKIRTING / VITRIFIED TILE FLOORING AND SKIRTING /CERAMIC TILE. FOR TOWER C2:- NATURAL / ENGINEERED STONE FLOORING AND SKIRTING/ LAMINATED WOODEN FLOORING AND SKIRTING / VITRIFIED TILE FLOORING AND SKIRTING /CERAMIC TILE.
WALL FINISHING DETAILSFOR INTERNAL WALLS, PLASTIC EMULSION PAINT / CERAMIC WALL TILING WHEREVER APPLICABLE & TEXTURED PAINT FOR EXTERNAL WALLS.
KITCHEN DETAILSCERAMIC TILE FLOORING, WALL TILING & PLASTIC EMULSION PAINT FOR CEILING.
BATHROOM FITTINGSREPUTED MAKE OF CP FITTINGS & SANITARY WARE.
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESFRAME – TIMBER FRAME & SHUTTERS – WITH BOTH SIDE MASONITE SKIN.
GLASS WORKNA
ELECTRIC FITTINGSFITTING OF REPUTED MAKE APPROVED BY ISI & IS SPECIFICATION.
CONDUCTING AND WIRING DETAILSPVC CONDUITS AND COPPER CABLES OF REPUTED MAKE AS PER ISI AND IS SPECIFICATION.
CUPBOARD DETAILSNA
WATER STORAGECOMMON UGR OF 690 KL.
LIFT DETAILSFOR TOWER A2 AND B2:- CAPACITY - 2 NOS. OF 8 PASSENGER LIFT OF REPUTED MAKE IN ALL TOWERS. FOR TOWER C2:- CAPACITY - 1 NO. OF 15 PASSENGER & 2 NOS. OF 8 PASSENGER LIFT OF REPUTED MAKE.
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSHEAVY-DUTY ALUMINIUM GLAZED SLIDING WINDOWS & FRENCH WINDOWS MADE FROM SPECIALLY DESIGNED AND MANUFACTURED SECTIONS.
DOORSNA
MAIN DOORSFRAME – TIMBER. SHUTTERS – WITH BOTH SIDE MASONITE SKIN
INTERNAL DOORSMAIN DOOR & BEDROOM DOORS • FRAME – TIMBER. • SHUTTERS – WITH BOTH SIDE MASONITE SKIN. TOILET DOOR FRAME – TIMBER SHUTTERS –WITH OUTSIDE MASONITE AND INSIDE LAMINATE.
AIR CONDITIONINGPOWER CONNECTION MADE AVAILABLE FOR SPLIT AC IN LIVING, DINING AND ALL THE BED ROOMS.
ELECTRICAL FITTINGSNA
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYCONDUIT PROVISION FOR DEDICATED INTERNET CONNECTION MADE AVAILABLE WITH RJ-45 SOCKET OUTLET IN ONE OF THE BEDROOMS.
EXTERNAL FINISHING/COLOUR SCHEMEALL WALLS PAINTED IN TEXTURED PAINT.
INTERNAL FINISHINGPLASTIC EMULSION PAINT FOR WALLS & CEILING.

Unit-wise Specifications

TOILET
FLOORSUPERIOR QUALITY CERAMIC TILE FLOORING.
WALLSSUPERIOR QUALITY CERAMIC WALL TILING UP TO FALSE CEILING.
CEILINGFALSE CEILING WITH GRID PANELS.
COUNTERSNATURAL / ENGINEERED STONE VANITY COUNTERS.
SANITARY WARE/CP FITTINGSEUROPEAN WATER CLOSET WALL HUNG, COUNTER TOP WASH BASIN
FIXTURESCHROMIUM PLATED FITTINGS :- S/L DIVERTER BATH SPOUT OVERHEAD SHOWER S/ L BASIN MIXER ANGULAR STOP COCK HEALTH FAUCET CP P-TRAP WASTE COUPLING METRO POLE FLUSH VALVE COCKROACH TRAP GEYSER – HORIZONTAL OF 25 LTR CAPACITY
KITCHEN
FLOORSUPERIOR QUALITY CERAMIC TILE FLOORING.
WALLSSUPERIOR QUALITY CERAMIC TILING UP TO CEILING.
CEILINGPLASTIC EMULSION PAINT FOR CEILING.
COUNTERSNA
FIXTURESSINK MIXER (WALL MOUNTED) SINGLE BOWL SINGLE DRAIN SS SINK IN UTILITY 2 IN 1 BIB COCK IN UTILITY ANGULAR STOP COCK COCKROACH TRAP BIB COCK WITH NOZZLE IN LIVING / DINING SIT OUT (WHEREVER APPLICABLE)
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORSUPERIOR QUALITY CERAMIC TILE FLOORING AND SKIRTING.
WALLS & CEILINGPLASTIC EMULSION PAINT FOR CEILING. ALL WALLS PAINTED IN TEXTURED PAINT.
RAILINGSNATURAL / ENGINEERED STONE COPING FOR PARAPET/MS HANDRAIL AS PER DESIGN.
FIXTURESNA
BED ROOMS
FLOORSUPERIOR QUALITY VITRIFIED TILE FLOORING AND SKIRTING.
WALLSPLASTIC EMULSION PAINT FOR WALLS.
CEILINGPLASTIC EMULSION PAINT FOR CEILING.
WARDROBESNA
MASTER TOILET
FLOORSUPERIOR QUALITY CERAMIC TILE FLOORING.
WALLSSUPERIOR QUALITY CERAMIC WALL TILING UP TO FALSE CEILING
CEILINGFALSE CEILING WITH GRID PANELS.
COUNTERSNATURAL/ENGINEERED STONE VANITY COUNTERS.
SANITARY WARE/CP FITTINGSEUROPEAN WATER CLOSET WALL HUNG, COUNTER TOP WASH BASIN
FITTING/FIXTURESCHROMIUM PLATED FITTINGS :- S/L DIVERTER BATH SPOUT WITH BUTTON OVERHEAD SHOWER TELEPHONIC SHOWER S/ L BASIN MIXER ANGULAR STOP COCK HEALTH FAUCET CP P-TRAP WASTE COUPLING METRO POLE FLUSH VALVE COCKROACH TRAP GEYSER – HORIZONTAL OF 25 LTR CAPACITY
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORING AND SKIRTING.
WALLSPLASTIC EMULSION PAINT FOR WALLS.
CEILINGPLASTIC EMULSION PAINT FOR CEILING.
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORFOR TOWER A2 AND B2:- SUPERIOR QUALITY VITRIFIED TILE FLOORING AND SKIRTING. FOR TOWER C2:- SUPERIOR QUALITY NATURAL / ENGINEERED STONE FLOORING AND SKIRTING.
WALLSPLASTIC EMULSION PAINT FOR WALLS.
CEILINGPLASTIC EMULSION PAINT FOR CEILING.
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORFOR TOWER C2:- SUPERIOR QUALITY CERAMIC TILE FLOORING.
WALLS & CEILINGFOR TOWER C2:- PLASTIC EMULSION PAINT FOR WALLS & CEILING.
TOILETFOR TOWER C2:- SUPERIOR QUALITY CERAMIC TILE FLOORING. SUPERIOR QUALITY CERAMIC WALL TILING UP TO FALSE CEILING. NATURAL / ENGINEERED STONE VANITY COUNTERS. FALSE CEILING WITH GRID PANELS.
BALCONYSUPERIOR QUALITY CERAMIC TILE FLOORING AND SKIRTING. NATURAL / ENGINEERED STONE COPING FOR PARAPET/MS HANDRAIL AS PER DESIGN. PLASTIC EMULSION PAINT FOR CEILING. ALL WALLS PAINTED IN TEXTURED PAINT.

Fee Details

Payment 1
amount:161139
cheque no:14055
draft date:27-07-2017
payable to:HRERA Gurugram
payee bank:AXIS BANK LIMITED
Payment 2
amount:186798
cheque no:14053
draft date:27-07-2017
payable to:HRERA Gurugram
payee bank:AXIS BANK LIMITED
Payment 3
amount:9413
cheque no:609051
draft date:27-07-2017
payable to:HRERA Gurugram
payee bank:AXIS BANK LIMITED
Payment 4
amount:268013
cheque no:290902
draft date:25-07-2018
payable to:HRERA Gurugram
payee bank:AXIS BANK LIMITED