Launch Date
Completion Date
Configurations
Sizes
Project Size
Total Floors
Launch Price
RERA ID
28.4613583
77.5400194
Not Applicable
Boundary Wall 1.5m high all around.
9.0m wide internal road finished in a combination of pavers and greenscaping.
As per Landscape Drawing, pavers
Water supply to be taken from GNIDA. WTP to be installed in the project.
Underground sewer line will be laid. STP will be installed. Sewer connection will be obtained from authority.
Drain line will be laid and connection will be obtained from authority.
As per Landscape Drawing, Approx 6000 sqm Green Area.
As per Landscape Drawing, 60 Nos. Trees
HT power connection will be taken from NPCL. Electrical yard will be provided with dedicated Transformers, HT/LT Panels and DG Sets. Street lights will be installed with EB power supply as well as backup power supply.
Recreation Area, Gym, Lounge etc.
Dedicated Sewage Treatment Plant will be installed for Sewage Treatment.
Organic waste composter will be installed for solid waste management. Disposal of inorganic waste will be done thru authorised agency.
Terrace rain water tank will be provided for storage and reuse, Surface rain water recharge tank will be provided.
EB Power Supply thru NPCL Backup Power - DG following CPCB guidelines Emergency power - UPS Renewable power - Solar as per MOEF guidelines Equipment selection - with proper energy efficiency as per green building norms.
As per provisional Fire NOC
Community building, Swimming Pool
Fire Staircase provided as per sanction plan, Signages and Fire Evacuation plan will be installed.
Not Applicable
Showing 2 blocks with 286 units
Total Carpet Area
38950.73 m²
419261.76 ft²
Total Units
420
5 different types
Blocks & Floors
2
46 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
14001.00 m²
150705.36 ft²