ONGOINGActive

SMARTWORLD ORCHARD

GURUGRAM, WAZIRABAD ST
01-09-2022
Launch Date
ONGOING
Type
2025-12-30
Completion Date

Overview

Launch Date

01-09-2022

Completion Date

2025-12-30

RERA ID

RERA-GRG-1121-2022

Basic Details

Project NameSMARTWORLD ORCHARD
Project IDRERA-GRG-1121-2022
Project TypeONGOING
Applicant TypeCompany
Submission Date01-09-2022 02:14:22 PM
Builder NameSUPOSHAA REALCON PRIVATE LIMITED
CINU70105HR2016PTC092957
PANXXXX101L
Emailsecretarial@smartworlddevelopers.com
Websitehttp://suposhaarealcon.com
Phone (Mobile)9958552424
Phone (Landline)0124660000
Registered Address12A FLOOR, TOWER 2 M3M INTERNATIONAL FINANCIAL CENTER, SECTOR-66 GURUGRAM, HARYANA
Project AddressSECTOR-61
DistrictGURUGRAM
TehsilWAZIRABAD ST

Bank Details

Bank NameKOTAK MAHINDRA BANK, GROUND FLOOR, JMD REGENT SQUARE MG ROAD, GURGAON-122002
Account Number7745099986
IFSC CodeKKBK0000261
MICR Code110485003
Branch Code000261

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)"1.Meenal Sood-C-81A, Moti Nagar, Ramesh Nagar H.O, West Delhi, Delhi 110015 2. Naman Gupta-704, Om Terrace, New City Light, China Gate, Surat, New Citylight, Surat, Surat City, Surat, Svr College, Gujarat, 395007 3.Gaurav Bansal-C-501, Lions Society, Opposite Tau Devi Lal Park, Sector 56, Gurgaon Sector 56, Gurgaon, Haryana - 122011 4. Rajat Jain-Villa no 44, Tulip Lvory, Gurgaon, Sector 70, Badshahpur, Gurgaon, Haryana-122101 5. Vivek Singhal-Flat No 7A, Tower 1, Fairway West, M3M Golf Estate, Sector 65, Badshahpur , Gurgaon, Haryana-122101 6. Anuj Kumar Goel- House No- C-25, Street No-1, Near Sunrise Public School, Bhajanpura, North East, Delhi- 110053"
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Upload

Development Details

Land Area23.29999 (Acre)
Proposed FAR2.629
Permissible FAR2.64
Total Licensed Land23.29999 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS13.39126
CONSTRUCTION OF ROADS4.73222
PAVEMENTS0
PARKS AND PLAYGROUNDS1.74752
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES2.33005
ANY OTHER0
AREA UNDER COMMERCIAL UNITS0.93094
VEGETABLE BOOTH0.007
STP0.111
TRANSFORMER0.001
UNDER GROUND WATER TANK0.049
Total23.29999

Cost Details

Land Cost28712.83 Lakhs
Other Cost11456.2 Lakhs
Estimated Project Cost98625.7 Lakhs
Estimated Infrastructure Cost54701.9 Lakhs
Estimated Apartment Construction Cost3754.85 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 25-08-2022

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 25-08-2022

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 25-08-2022

DEMARCATION PLAN

Uploaded on: 25-08-2022

ZONING PLAN

Uploaded on: 25-08-2022

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 25-08-2022

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 25-08-2022

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 01-09-2022

DOMESTIC WATER SUPPLY

Uploaded on: 19-09-2022

ELECTRICAL LAYOUT

Uploaded on: 19-09-2022

IRRIGATION WATER SUPPLY

Uploaded on: 19-09-2022

LANDSCAPE PLAN

Uploaded on: 19-09-2022

ROAD LAYOUT

Uploaded on: 19-09-2022

SEWERAGE LAYOUT

Uploaded on: 19-09-2022

STORM WATER LAYOUT

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-A; 01

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-A; 02

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-A; 03

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-A; 04

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-A; 05

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-A; 06

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-A; 07

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-A; 08

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-B; 01

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-B; 02

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-B; 03

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-B; 04

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-C; 01

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-C; 02

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-D; 01

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-D; 02

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-D; 03

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-D; 04

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-D; 05

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-D; 06

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-D; 07

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-D; 08

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-E; 01

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-E; 02

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-E; 03

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-E; 04

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-F; 01

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-F; 02

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-F; 04

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-F; 03

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-P1; 01

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-P2; 01

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-P4; 01

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-P5; 01

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-P6; 01

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-P7; 01

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-P8; 01

Uploaded on: 19-09-2022

BUILDING PLAN-TYPE-P9; 01

Uploaded on: 19-09-2022

1ST BASEMENT & GROUND FLOOR PLAN

Uploaded on: 06-10-2022

BR-III SUPOSHAA REALCON COMMERCIAL-2

Uploaded on: 06-10-2022

FIRST FLOOR & SECOND FLOOR PLAN

Uploaded on: 06-10-2022

SECTION & ELEVATION

Uploaded on: 06-10-2022

SITE PLAN & AREA CALCULATION

Uploaded on: 06-10-2022

THIRD FLOOR & TERRACE FLOOR PLAN

Uploaded on: 06-10-2022

Statutory Approvals

LICENCEDate: 16-09-2021Status: ALREADY BEEN OBTAINED
LICENCEDate: 25-05-2022Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 25-05-2022Status: ALREADY BEEN OBTAINED
ARAVALI NOCDate: 05-05-2022Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 01-04-2022Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: No
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: No

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
SECURITYAS PER PROJECT REPORT
STP OTHER THAN STRUCTURAL WORKSAS PER PROJECT REPORT
UNDERGROUND TANK OTHER THAN STRUCTURAL WORKSAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRICAL SUB STATION OTHER THAN STRUCTURAL WORKSAS PER PROJECT REPORT
BOUNDARY WALLAS PER PROJECT REPORT

NOC

ROADSProvider: GMDAApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNLApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

MANIK SHARMA
Name
MANIK SHARMA
PAN
XXXX240L
Email
secretarial@smartworlddevelopers.com
Mobile
8929034470
Landline
0124660000
Address
House No. 544 Top Floor Sector-46 Urban Estate Amarnagar Faridabad 121003 Haryana

Managing Director/CEO

N A
Name
N A
PAN
XXXX000X
Email
secretarial@smartworlddevelopers.com
Mobile
0000000000
Landline
00000000000
Address
N.A.

Directors

GAURAV BANSAL
Name
GAURAV BANSAL
PAN
XXXX092P
Email
secretarial@smartworlddevelopers.com
Mobile
9711048431
Landline
0124660000
Address
2302 M3M Latitude Golf Course Extension Road Sector 65 Badshahpur Gurugram-122101 Haryana
HARI EASWARAN
Name
HARI EASWARAN
PAN
XXXX2424
Email
secretarial@smartworlddevelopers.com
Mobile
9920320760
Landline
0124660000
Address
204 A Wing Eternia Hiranandani Gardens Powai Mumbai- 400076 Maharashtra
DAVINDER SINGH MALIK
Name
DAVINDER SINGH MALIK
PAN
XXXX333J
Email
secretarial@smartworlddevelopers.com
Mobile
9999362227
Landline
0124660000
Address
4187 Defence Colony Jind -126102 Haryana

Contact Details

Project ContactEmail: secretarial@smartworlddevelopers.comMobile: 9958552424Landline: 0124660000
Project Contact PersonName: AJAY BANSALEmail: secretarial@smartworlddevelopers.comMobile: 9958552424Landline: 0124660000

Land Details

Land Area23.29999 (Acre)
Proposed FAR2.629
Permissible FAR2.64
Total Licensed Land23.29999 (Acre)

Land Usage

Land Cost28712.83 Lakhs
Other Cost11456.2 Lakhs
Estimated Project Cost98625.7 Lakhs
Estimated Infrastructure Cost54701.9 Lakhs
Estimated Apartment Construction Cost3754.85 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements203.1
Water Supply System135.4
Storm Water Drainage0
Parks and Playgrounds0
Electrical Sub Station169.25
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal169.25

Quarterly Infrastructure Expenditure

2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall---12.44
Clubhouse/community centres--00
Electrical Sub Station---99.55
Electricity Supply System--00
Other--00
Parks and Playgrounds--00
Rain Water Harvesting---33.85
Rain water harvesting--16.92-
Roads & Pavements--57.26114.52
STP---32.16
Security----
Sewerage treatment & garbage disposal--39.2747.12
Shopping area--00
Storm Water Drainage--35.3570.7
Street Light----
Underground Tank---17.69
Underground tank other than structural works--8.85-
Water Supply System--78.01104.01
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall12.4449.7524.8724.87
Clubhouse/community centres0000
Electrical Sub Station0016.5916.59
Electricity Supply System21.0384.1242.0642.06
Other0000
Parks and Playgrounds9.739.739.739.73
Rain Water Harvesting16.9216.9228.21-
Rain water harvesting----
Roads & Pavements222.09229.03171.77140.45
STP032.1632.1632.16
Security--2.832.83
Sewerage treatment & garbage disposal78.5358.900
Shopping area0000
Storm Water Drainage35.3535.3558.920
Street Light8.9444.722.3513.41
Underground Tank35.3835.3853.0726.54
Underground tank other than structural works----
Water Supply System104.0178.0120.620
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall----
Clubhouse/community centres00--
Electrical Sub Station29.86---
Electricity Supply System126.17105.14--
Other00--
Parks and Playgrounds00--
Rain Water Harvesting----
Rain water harvesting----
Roads & Pavements00--
STP32.16---
Security----
Sewerage treatment & garbage disposal00--
Shopping area00--
Storm Water Drainage00--
Street Light----
Underground Tank----
Underground tank other than structural works----
Water Supply System00--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILE / LAMINATED WOODEN FLOORING / CERAMIC TILE
WALL FINISHING DETAILSPLASTER WITH PAINT
KITCHEN DETAILSGRANITE COUNTER WITH SS SINK
BATHROOM FITTINGSAS PER APPROVED MAKE
WOOD WORK ETCN.A.
DOORS AND WINDOS FRAMESN.A. " HARDWOOD DOOR FRAME WITH LAMINATED FLUSH/WOODEN DOOR
GLASS WORKN.A.
ELECTRIC FITTINGSAS PER APPROVED MAKE
CONDUCTING AND WIRING DETAILSAS PER APPROVED MAKE
CUPBOARD DETAILSN.A.
WATER STORAGEAS PER NORMS
LIFT DETAILS4 TO 6 PASSENGER LIFTS AS PER NORMS
EXTERNAL GLAZINGSALUMINUM GLAZING / UPVC GLAZING
WINDOWS/GLAZINGSALUMINUM GLAZING / UPVC GLAZING
DOORSN.A.
MAIN DOORS" HARDWOOD DOOR FRAME WITH LAMINATED FLUSH DOOR"
INTERNAL DOORSHARDWOOD DOOR FRAME WITH LAMINATED WOODEN DOOR
AIR CONDITIONINGVRV HIGH WALL UNITS IN APARTMENT SPLIT UNITS IN BASEMENT
ELECTRICAL FITTINGSAS PER APPROVED MAKE
CNG PIPE LINEAS PER APPROVED MAKE N.A.
PROVISION OF WIFI AND BROADBAND FACILITYRIGHT OF WAY FOR INFRASTRUCTURE TO BE PROVISIONED
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL WEATHERPROOF PAINT
INTERNAL FINISHINGN.A.

Unit-wise Specifications

TOILET
FLOORMATT FINISH TILES
WALLSTILE DADO AND PAINT
CEILINGFALSE CEILING / OBD
COUNTERSWASHBASIN WITH COUNTER
SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
FIXTURESAS PER APPROVED MAKE
KITCHEN
FLOORVITRIFIED TILE
WALLSCERAMIC TILE DADO ABOVE COUNTER AND PAINT
CEILINGFALSE CEILING / OBD
COUNTERSSTONE COUNTER WITH SS SINK
FIXTURESAS PER APPROVED MAKE
KITCHEN APPLIANCESN.A.
SIT-OUTS
FLOORN.A.
WALLS & CEILINGN.A.
RAILINGSN.A.
FIXTURESN.A.
BED ROOMS
FLOORVITRIFIED TILE / LAMINATED WOODEN FLOORING " PLASTIC PAINT / OBD" OBD N.A. MATT FINISH TILES TILE DADO AND PAINT FALSE CEILING / OBD WASHBASIN WITH COUNTER AS PER APPROVED MAKE AS PER APPROVED MAKE VITRIFIED TILE
WALLSVITRIFIED TILE / LAMINATED WOODEN FLOORING " PLASTIC PAINT / OBD" OBD N.A. MATT FINISH TILES TILE DADO AND PAINT FALSE CEILING / OBD WASHBASIN WITH COUNTER AS PER APPROVED MAKE AS PER APPROVED MAKE VITRIFIED TILE
CEILINGOBD
WARDROBESN.A.
MASTER TOILET
FLOORMATT FINISH TILES
WALLSTILE DADO AND PAINT
CEILINGFALSE CEILING / OBD
COUNTERSWASHBASIN WITH COUNTER
SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
FITTING/FIXTURESAS PER APPROVED MAKE
MASTER BEDROOM/DRESSROOM
FLOORVITRIFIED TILE / LAMINATED WOODEN FLOORING
WALLSPLASTIC PAINT / OBD
CEILINGOBD
MODULAR WARDROBESN.A.
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILE / LAMINATED WOODEN FLOORING
WALLSPLASTIC PAINT / OBD
CEILINGOBD
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORN.A.
WALLS & CEILINGN.A.
TOILETN.A.
BALCONYN.A.

Fee Details

Payment 1
amount:3046300
cheque no:513091
draft date:28-10-2021
payable to:HRERA Gurugram
payee bank:ICICI BANK LTD.
Payment 2
amount:1154000
cheque no:513090
draft date:28-10-2021
payable to:HRERA Gurugram
payee bank:ICICI BANK LTD.
Payment 3
amount:277600
cheque no:53740
draft date:29-08-2022
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK LTD.
Payment 4
amount:630400
cheque no:53741
draft date:29-08-2022
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK LTD.
Payment 5
amount:171600
cheque no:53783
draft date:15-09-2022
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK LTD.
Payment 6
amount:49100
cheque no:53784
draft date:15-09-2022
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK LTD.
Payment 7
amount:594522
cheque no:52022091900651194
draft date:19-09-2022
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK (RTGS)