NEWActive

SMARTWORLD ONE DXP

GURUGRAM, GURGAON
02-12-2022
Launch Date
NEW
Type
2027-12-31
Completion Date

Overview

Launch Date

02-12-2022

Completion Date

2027-12-31

RERA ID

RERA-GRG-1217-2022

Basic Details

Project NameSMARTWORLD ONE DXP
Project IDRERA-GRG-1217-2022
Project TypeNEW
Applicant TypeCompany
Submission Date02-12-2022 01:32:36 PM
Builder NameNOURISH DEVELOPERS PRIVATE LIMITED
CINU70109HR2020PTC091616
PANXXXX384L
Emailsecretarial@smartworlddevelopers.com
WebsiteHttp://www.nourishdevelopersprivatelimited.com/
Phone (Mobile)9958552424
Phone (Landline)01246600000
Registered Address12A FLOOR TOWER 2 M3M INTERNATIONAL FINANCIAL CENTER SECTOR 66 GURGAON HR 122002 IN
Project AddressSEC-113
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameKOTAK MAHINDRA BANK ,UNIT NO. 8 & 9, SEWA CORPORATE PARK, MG ROAD, GURUGRAM, HARYANA 122002
Account Number4747014139
IFSC CodeKKBK0000261
MICR Code110485003
Branch Code000261

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)1. Mr. Gaurav Bansal, 2302, M3M Latitude, Golf Course Extension Road, Sector-65, Gurugram. 2. Mr. Rajat Jain, Villa No 44, Tulip Ivory, Gurugram, Sector-70. 3. Mr. Anuj Kumar Goel, House No-C-25, Street No.1, Near SunrisePublic School, Bhajanpura, Delhi. 4. Mr. Vivek Singhal, Flat No 7A, Tower-1, Fairway West, M3m Golf Estate, Sector-65, Gurugram. 5. Ms. Meenal Sood, C-81A, Moti Nagar, Ramesh Nagar, West Delhi. 6. Mr. Anil Mittal, House No 723, Sector-31, Gurugram, Haryana
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Attached as Annexure

Development Details

Land Area7.94 (Acre)
Proposed FAR3.41
Permissible FAR3.62
Total Licensed Land16.1125 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS2.0134
CONSTRUCTION OF ROADS3.3288
PAVEMENTS0
PARKS AND PLAYGROUNDS1.6529
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0.01633
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0.9286
Total7.94003

Cost Details

Land Cost28867.70 Lakhs
Other Cost39657.31 Lakhs
Estimated Project Cost135017.45 Lakhs
Estimated Infrastructure Cost7769.3 Lakhs
Estimated Apartment Construction Cost58723.14 Lakhs

Documents

TOWER-A,B,G,H 6TH FLOOR PLAN

Uploaded on: 02-12-2022

TOWER-A,B,G,H 26TH & 27TH FLOOR PLAN

Uploaded on: 02-12-2022

TOWER-A,B,G,H 28TH FLOOR PLAN

Uploaded on: 02-12-2022

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 02-12-2022

TOWER A&B_TYPICAL FLOOR PLANS (3RD-5TH,7TH,9TH,11TH-16TH)

Uploaded on: 02-12-2022

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 02-12-2022

TOWER-A,B,G,H ELEVATION PLAN-2

Uploaded on: 02-12-2022

TOWER-C,D,E,F ELEVATION PLAN

Uploaded on: 02-12-2022

TOWER-A,B,G,H 8TH FLOOR PLAN

Uploaded on: 02-12-2022

TOWER-C,D,E,F 10TH FLOOR PLAN

Uploaded on: 02-12-2022

PARKING PLAN-2

Uploaded on: 02-12-2022

TOWER-C,D,E,F ELEVATION PLAN-2

Uploaded on: 02-12-2022

STORM WATER LAYOUT

Uploaded on: 02-12-2022

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 02-12-2022

TOWER-A,B,G,H 2ST FLOOR PLAN

Uploaded on: 02-12-2022

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 02-12-2022

BASEMENT PLAN

Uploaded on: 02-12-2022

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 01-12-2022

TOWER-A,B,G,H ELEVATION PLAN-1

Uploaded on: 02-12-2022

SUPERIMPOSED DEMARCATION ON APPROVED LAYOUT PLAN

Uploaded on: 02-12-2022

STRUCTURAL PLAN-2

Uploaded on: 02-12-2022

TOWER-A,B,G,H 10TH FLOOR PLAN

Uploaded on: 02-12-2022

TOWER-A,B,G,H SECTION PLAN

Uploaded on: 02-12-2022

LANDSCAPE PLAN

Uploaded on: 01-12-2022

TOWER-C,D,E,F 6TH FLOOR PLAN

Uploaded on: 02-12-2022

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 01-12-2022

TOWER-C,D,E,F 1ST FLOOR PLAN

Uploaded on: 02-12-2022

TOWER-C,D,E,F 8TH FLOOR PLAN

Uploaded on: 02-12-2022

TOWER-A,B,G,H 1ST FLOOR PLAN

Uploaded on: 02-12-2022

PARKING PLAN

Uploaded on: 02-12-2022

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 01-12-2022

TOWER-C,D,E,F SECTION PLAN

Uploaded on: 02-12-2022

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 01-12-2022

BASEMENT PLAN-2

Uploaded on: 02-12-2022

TOWER-C,D,E,F 2ST FLOOR PLAN

Uploaded on: 02-12-2022

WATER SUPPLY LAYOUT

Uploaded on: 02-12-2022

BR-III

Uploaded on: 01-12-2022

ZONING PLAN

Uploaded on: 02-12-2022

TOWER-C,D,E,F 19TH FLOOR PLAN

Uploaded on: 02-12-2022

SEWER LAYOUT

Uploaded on: 02-12-2022

STRUCTURAL PLAN-1

Uploaded on: 02-12-2022

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 10-12-2022

TOWER C,D,E,&F_GF PLANS & AREA DIAGRAM

Uploaded on: 10-12-2022

TOWER A,B,G&H_2ND FLOOR; FIRE FIGHTING & ALARM SYSTEM LAYOUT

Uploaded on: 10-12-2022

TOWER C,D,E&F_TERRACE FLOOR; FIRE FIGHTING & ALARM SYSTEM LAYOUT

Uploaded on: 10-12-2022

TOWER-A,B,G,H 19TH FLOOR PLAN

Uploaded on: 10-12-2022

TOWER-C,D,E,F 27TH & 26TH FLOOR PLAN

Uploaded on: 10-12-2022

DEMARCATION PLAN

Uploaded on: 10-12-2022

ELECTRICITY SUPPLY PLAN

Uploaded on: 10-12-2022

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 10-12-2022

ROAD LAYOUT ON APPROVED SITE PLAN

Uploaded on: 10-12-2022

STREET LIGHT LAYOUT PLAN

Uploaded on: 10-12-2022

TOWER A,B,G&H_(3RD-5TH,7TH,9TH,11TH-18TH & 20TH-25TH) FLOOR; FIRE FIGHTING & ALARM SYSTEM LAYOUT

Uploaded on: 10-12-2022

TOWER A,B,G&H_10TH FLOOR; FIRE FIGHTING & ALARM SYSTEM LAYOUT

Uploaded on: 10-12-2022

TOWER A,B,G&H_28TH FLOOR; FIRE FIGHTING & ALARM SYSTEM LAYOUT

Uploaded on: 10-12-2022

TOWER C,D,E&F_1ST FLOOR; FIRE FIGHTING & ALARM SYSTEM LAYOUT

Uploaded on: 10-12-2022

TOWER C,D,E&F_6TH FLOOR; FIRE FIGHTING & ALARM SYSTEM LAYOUT

Uploaded on: 10-12-2022

TOWER C,D,E&F_10TH FLOOR; FIRE FIGHTING & ALARM SYSTEM LAYOUTED

Uploaded on: 10-12-2022

TOWER C,D,E&F_28TH FLOOR; FIRE FIGHTING & ALARM SYSTEM LAYOUT

Uploaded on: 10-12-2022

TOWER C,D,E&F_TYPICAL FLOOR(3RD-5TH,7TH,9TH,11TH-18TH & 20TH-25TH),; FIRE FIGHTING & ALARM SYSTEM LAYOUT

Uploaded on: 10-12-2022

TOWER E&F_STILT- GROUND FLOOR; FIRE FIGHTING & ALARM SYSTEM LAYOUT

Uploaded on: 10-12-2022

TOWER G&H_TERRACE FLOOR PLAN

Uploaded on: 10-12-2022

TOWER-C,D GROUND FLOOR PLAN

Uploaded on: 10-12-2022

TOWER G&H_TYPICAL FLOOR PLANS (17TH,18TH,20TH-25TH)

Uploaded on: 10-12-2022

TOWER-C,D,E,F 28ND FLOOR PLAN

Uploaded on: 10-12-2022

TOWER C,D,E,&F_TYPICAL FLOOR PLANS (3TH-5TH,7TH,9TH,11TH-18TH,20TH-25TH)

Uploaded on: 10-12-2022

TOWER C,D,E,&F_TERRACE ROOF LAYOUT

Uploaded on: 10-12-2022

TOWER C,D,E&F, 2_3 BHK APARTMENT PLAN

Uploaded on: 10-12-2022

TOWER A,B,G&H_3BHK_4BHK APARTMENT PLAN

Uploaded on: 10-12-2022

TOWER A,B,G&H_GF PLAN

Uploaded on: 10-12-2022

TOWER A,B,G&H_TYPICAL FLOOR PLANS (3RD-5TH,7TH,9TH,11TH-16TH)

Uploaded on: 10-12-2022

TOWER A,B,G&H_TYPICAL FLOOR PLANS (17TH,18TH,20TH-25TH)

Uploaded on: 10-12-2022

TOWER E&F_GF_STILT PLAN

Uploaded on: 10-12-2022

Statutory Approvals

ENVIRONMENT CLEARANCEDate: 24-12-2019Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 07-08-2018Status: ALREADY BEEN OBTAINED
ARAVALLI NOCDate: 27-08-2018Status: ALREADY BEEN OBTAINED
ASSURANCE CONSTRUCTION WATERDate: 09-08-2022Status: ALREADY BEEN OBTAINED
ASSURANCE OF TREATED WATERDate: 09-08-2022Status: ALREADY BEEN OBTAINED
CONSTRUCTION WATER NOCDate: 11-11-2022Status: ALREADY BEEN OBTAINED
DRINKING WATER ASSURANCEDate: 10-08-2022Status: ALREADY BEEN OBTAINED
SEWERAGE ASSURANCEDate: 09-08-2022Status: ALREADY BEEN OBTAINED
STORM WATER ASSURANCEDate: 09-08-2022Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
STPAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRICAL SUB STATIONAS PER PROJECT REPORT
BOUNDARY WALLAS PER PROJECT REPORT
UNDERGROUND TANKAS PER PROJECT REPORT

NOC

ROADSProvider: GMDAApproval Status: Pending
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

MR MANIK SHARMA
Name
MR MANIK SHARMA
PAN
XXXX240L
Email
secretarial@smartworlddevelopers.com
Mobile
8929034470
Landline
012446600000
Address
H.No. 544Sec-46 Urban Estate Amarnagar FaridabadHaryana-121003

Managing Director/CEO

NA
Name
NA
PAN
XXXX0000
Email
secretarial@smartworlddevelopers.com
Mobile
0000000000
Landline
0000000000
Address
NA

Directors

MR KRISHAN KUMAR SINGHAL
Name
MR KRISHAN KUMAR SINGHAL
PAN
XXXX079A
Email
secretarial@smartworlddevelopers.com
Mobile
9873245649
Landline
012446600000
Address
2415 Gali No 13 Kailash Nagar Gandhi Nagar S.O. East Delhi Delhi
MR DAVINDER SINGH MALIK
Name
MR DAVINDER SINGH MALIK
PAN
XXXX333J
Email
secretarial@smartworlddevelopers.com
Mobile
9999362227
Landline
012446600000
Address
4187 Defence Colony Jind Haryana
MR HARI EASWARAN
Name
MR HARI EASWARAN
PAN
XXXX297H
Email
secretarial@smartworlddevelopers.com
Mobile
9920320760
Landline
012446600000
Address
204 A Wing Eternia Hiranandani Gardens Powai Mumbai Maharashtra

Contact Details

Project ContactEmail: secretarial@smartworlddevelopers.comMobile: 9971161312Landline: 012446600000
Project Contact PersonName: VISHAL LALAEmail: secretarial@smartworlddevelopers.comMobile: 9971161312Landline: 012446600000

Land Details

Land Area7.94 (Acre)
Proposed FAR3.41
Permissible FAR3.62
Total Licensed Land16.1125 (Acre)

Land Usage

Land Cost28867.70 Lakhs
Other Cost39657.31 Lakhs
Estimated Project Cost135017.45 Lakhs
Estimated Infrastructure Cost7769.3 Lakhs
Estimated Apartment Construction Cost58723.14 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall----
Clubhouse/community centres---0
Electrical Sub Station----
Electricity Supply System---9.84
Firefighting Services----
Other---0
Parks and Playgrounds---0
Rain Water Harvesting----
Roads & Pavements---9.67
STP----
Security----
Sewerage treatment & garbage disposal---0
Shopping area---0
Storm Water Drainage---0
Street Light----
Underground Water Tank----
Water Supply System---0
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall3.937.8619.6639.32
Clubhouse/community centres0000
Electrical Sub Station0028.2970.73
Electricity Supply System49.2149.2198.4398.43
Firefighting Services6.3531.7731.7763.54
Other0000
Parks and Playgrounds3151530
Rain Water Harvesting000.892.24
Roads & Pavements19.3348.3396.6696.66
STP0011.6729.18
Security0.52.52.55
Sewerage treatment & garbage disposal22.6237.775.4175.41
Shopping area0000
Storm Water Drainage2.2411.1811.1822.36
Street Light0002.68
Underground Water Tank006.1415.35
Water Supply System29.3448.997.8197.81
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall78.6478.6474.747.18
Clubhouse/community centres0000
Electrical Sub Station141.47212.2254.64212.2
Electricity Supply System118.11118.11118.11118.11
Firefighting Services63.5476.2576.2576.25
Other0000
Parks and Playgrounds30363636
Rain Water Harvesting4.476.718.946.71
Roads & Pavements115.99115.99115.99115.99
STP58.3687.54116.7287.54
Security5666
Sewerage treatment & garbage disposal90.4990.4990.4990.49
Shopping area0000
Storm Water Drainage22.3626.8326.8326.83
Street Light9.3913.4220.1226.83
Underground Water Tank30.746.0561.446.05
Water Supply System117.37117.37117.37117.37
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall31.4511.800
Clubhouse/community centres0000
Electrical Sub Station169.76141.4784.8828.29
Electricity Supply System98.4359.0649.210
Firefighting Services76.2563.5438.1231.77
Other0000
Parks and Playgrounds36301812
Rain Water Harvesting6.714.472.680.89
Roads & Pavements96.665848.3329
STP87.5458.3635.0211.67
Security6532.5
Sewerage treatment & garbage disposal75.4145.2437.722.62
Shopping area0000
Storm Water Drainage26.8322.3613.4211.18
Street Light20.1220.1213.428.05
Underground Water Tank46.0530.718.426.14
Water Supply System97.8158.6848.929.34
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Boundary Wall----
Clubhouse/community centres0---
Electrical Sub Station70.73---
Electricity Supply System0---
Firefighting Services----
Other0---
Parks and Playgrounds3---
Rain Water Harvesting----
Roads & Pavements0---
STP----
Security----
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Street Light----
Underground Water Tank----
Water Supply System0---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES/LAMINATED WOODEN FLOOR/CERAMIC TILE
WALL FINISHING DETAILSLEVEL PLASTER / WHITE PUTTY
KITCHEN DETAILSAS PER APPROVED
BATHROOM FITTINGSAS PER APPROVED
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESALUMINIUM FRAME
GLASS WORKGLASS WITH ALUMINIUM FRAME
ELECTRIC FITTINGSLED TYPE FITTINGS IN COMMON AREA ONLY
CONDUCTING AND WIRING DETAILSPVC / MS CONDUIT WITH FR / FRLS PVC WIRES
CUPBOARD DETAILSNA
WATER STORAGENA
LIFT DETAILSSCHINDLER/THYSSENKRUPP/KONE/AS APPROVED AS PER VERTICAL TRAFFIC
EXTERNAL GLAZINGSEXTERNAL FAÇADE SGU / ACP / EXTERNAL PAINT OR AS APPROVED
WINDOWS/GLAZINGSNA
DOORSNA
MAIN DOORSWOODEN FRAME WITH FLUSH DOOR
INTERNAL DOORSWOODEN FRAME WITH FLUSH DOOR OR AS APPROVED
AIR CONDITIONINGMITSUBISHI/DAIKEN/AS APPROVED
ELECTRICAL FITTINGSLED TYPE FITTINGS IN COMMON AREA ONLY
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYPROVISION ONLY
EXTERNAL FINISHING/COLOUR SCHEMEGLASS WITH STONE / ALUMINIUM CLADDING / PAINT OR AS APPLICABLE
INTERNAL FINISHINGGYPSUM PLASTER & PAINT ONLY FOR COMMON AREA

Unit-wise Specifications

TOILET
FLOORANTISKID CERAMIC TILES
WALLSPLASTER+OBD
CEILINGGRID FALSE CEILING/OBD
COUNTERSN. A.
SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
FIXTURESAS PER APPROVED MAKE
KITCHEN
FLOORVITRIFIED TILES
WALLSPLASTER+OBD
CEILINGOBD
COUNTERSSTONE/MARBLE
FIXTURESAS PER APPROVED MAKE
KITCHEN APPLIANCESN. A.
SIT-OUTS
FLOORN. A.
WALLS & CEILINGN. A.
RAILINGSN. A.
FIXTURESN. A.
BED ROOMS
FLOORVITRIFIED TILES/LAMINATE WOODEN
WALLSPLASTER+OBD
CEILINGOBD
WARDROBESN. A.
MASTER TOILET
FLOORANTISKID CERAMIC TILES
WALLSPLASTER+OBD
CEILINGGRID FALSE CEILING/OBD
COUNTERSSTONE/MARBLE
SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
FITTING/FIXTURESAS PER APPROVED MAKE
MASTER BEDROOM/DRESSROOM
FLOORVITRIFIED TILES/LAMINATE WOODEN
WALLSPLASTER+OBD
CEILINGOBD
MODULAR WARDROBESN. A.
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES
WALLSPLATSER/OBD
CEILINGOBD
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORANTISKID CERAMIC TILES
WALLS & CEILINGPLASTER+PAINT
TOILETANTISKID CERAMIC TILES
BALCONYANTISKID CERAMIC TILES

Fee Details

Payment 1
amount:1259700
cheque no:514114
draft date:01-12-2022
payable to:HRERA Gurugram
payee bank:ICICI BANK LTD
Payment 2
amount:4295580
cheque no:514112
draft date:01-12-2022
payable to:HRERA Gurugram
payee bank:ICICI BANK LTD
Payment 3
amount:264540
cheque no:514113
draft date:01-12-2022
payable to:HRERA Gurugram
payee bank:ICICI BANK LTD