Launch Date
Completion Date
RERA ID
28 36' 49'
77 26' 43'
as per plan
RCC wall with MS railings
Trimix/ pavers/chequared tiles
pavers
the water supply/sewer system/Drain will be provided by GNOIDA up to plot boundary. The internal distribution will be done by us
-do-
-do-
As per sanction plan
-d-
the electricity supply will be provided by NPCL/UPPCL.the internal distribution and design will be done with 50% diversity will be done by us
As per sanctioned plan
STP 150 KLDS 2 nos and discharges from STP will be used in flushing and landscaping. Extra discharge will be disposed in GNOIDA sewer
Organic waste Compost plant will be installed
As per sanction plan and guideline of GREEN Buildings
Online soler system of 20 KW capacity will be installed for basement lighting
AS per Fire NOC
As per sanctioned plan
As per sanctioned plan
-do-
Showing 5 blocks with 269 units
Total Carpet Area
60731.55 m²
653708.33 ft²
Total Units
983
6 different types
Blocks & Floors
5
34 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
20120.77 m²
216577.96 ft²