Launch Date
Completion Date
RERA ID
28.29.51.82
77.32.18.77
RCC boundary wall with Grill
boundary wall
pavers/trimix conc chequered tiles
pavers
water supply will be given by G NOIDA . Internal distribution will be done by Us
Sewer system up to plot boundary will be done by Gnoida . Internal system will be developed by Us
Drainage system will be provided by G noida up to plot boundary . Inside it will be delovped by us
Central Park will be developed by us
more then 140 trees will be planted by us
As per electricity design norms with 50 percent Diversity Factor
Community building with Gym, Party hall ,Pool table TT table swimming pool with Kid pool
IGBC gold certified Green Building with STP and Duel plumbing system
Bia degradable waste will be converted in Manure and used in Land scaping Segregation of waste and other waste will be disposed to Gnoida Agency
Rain water Harvesting as per IGBC and EC norms
As per IGBC and 30 kw on line solar roof top system for basement lighting
as per Fire NOC received by us
Kids play area Pray buildings jogging Track Play area in the project
As per Fire Noc
As per sanctioned plan
Showing 6 blocks with 326 units
Total Carpet Area
68608.69 m²
738497.08 ft²
Total Units
1102
5 different types
Blocks & Floors
6
34 floors across all blocks
Parking
212
0 garages, 212 open
Total Area
20073.90 m²
216073.45 ft²