NewActive

SIYA COMPLEX

Sant Ravidas Nagar, Uttar Pradesh
01-01-2025
RERA Received Date
New
Type
20-12-2029
Completion Date

Overview

RERA Received Date

01-01-2025

Completion Date

20-12-2029

RERA ID

UPRERAPRJ809405/02/2026

Location

Latitude

25.377699

Longitude

82.568274

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)4872
Project NameSIYA COMPLEX
Registration Fee (in Rs.)59000
AddressKhasra No. 93 Mi Rajpura Housing Scheme Phase 2 Bhadohi
Village/Locality/Sector etc.Rajpura
StateUttar Pradesh
Project Duration (In month)60
DistrictSant Ravidas Nagar
Original Start Date-
TehsilBhadohi
Proposed Start Date01-01-2025
Sanctioning Competent AuthorityAny Other Competent Authority
Project Cost (in Lacs)1454
Proposed Completion Date20-12-2029

Bank Details

Account Details
Name of the AccountBHADOHI INDUSTRIAL DEVELOPMENT AUTHORITY COLLECTION ACCOUNT FOR SIYA COMPLEX
Account Number628205501084
Bank NameICICI BANK
Branch NameBHADOHI
Branch AddressPLOT NO 72/71, SUDHA COMPLEX, CHAK SAIF MAIN ROAD, BHADOHI UP- 221401
IFSC CodeICIC0000820
Branch DistrictSant Ravidas Nagar
Branch StateUttar Pradesh
Branch Email Address[email protected]
Separate Account Details
Name of the AccountBHADOHI INDUSTRIAL DEVELOPMENT AUTHORITY SEPARATE ACCOUNT FOR SIYA COMPLEX
Account Number628205501082
Bank NameICICI BANK
Branch NameBHADOHI
Branch AddressPLOT NO 72/71, SUDHA COMPLEX, CHAK SAIF MAIN ROAD, BHADOHI UP- 221401
Branch StateUttar Pradesh
Branch DistrictSant Ravidas Nagar
IFSC CodeICIC0000820
Transaction Account Details
Name of the AccountBHADOHI INDUSTRIAL DEVELOPMENT AUTHORITY RERA TRANSACTION ACCOUNT FOR SIYA COMPLEX
Account Number628205501083
Bank NameICICI BANK
Branch NameBHADOHI
Branch AddressPLOT NO 72/71, SUDHA COMPLEX, CHAK SAIF MAIN ROAD, BHADOHI, UP- 221401
Branch StateUttar Pradesh
Branch DistrictSant Ravidas Nagar
IFSC CodeICICI0000820

Development Works

Demarcation of Plots

Plot is already demarcated. all the development and construction work will be done under the demarcated plot.

Boundary Wall

N/A. (Siya Complex is Situated in a well established Bhadohi Industrial Development Authority BIDA Rajpura Scheme Phase-2 Colony).

Road Work

Siya Complex is Located in an already developed Scheme in which North Side 12.00 M Wide Bituminious Road and East Side and South side 09.00 M wide Road around the building .

Footpaths

A footpath with a PCC base and 20 mm thick Chequered paver blocks shall be provided as per the drawings.

Water Supply Including Drinking Water Facilities

The water supply system for the building shall be designed to ensure reliable, hygienic, and adequate water availability for fire protection as well as domestic use. Source & Storage: • For domestic use undergrond tank of capacity of 25000 liters through overhead water tank • The primary source of water shall be a bore well (tube well). • Water from the bore well shall be conveyed through suitable pipelines to the Rooftop Water Tank . • The Water Tank shall be compartmentalized into Fire Water Tank and Domestic Water Tank as per applicable norms. Fire Water Priority: • Water from the bore well shall first be filled into the Fire Water Tank in the Storage tank to ensure uninterrupted fire-fighting water availability. • After the fire tank is fully charged, overflow water shall be diverted to the Domestic Water Tank. Pumping & Distribution: • Water from the domestic section of the Water tank shall be pumped using electrically operated pumps to the Overhead Tank (OHT). • The pumping system shall include necessary control valves, non-return valves, pressure gauges, and isolation valves. • Adequate pump capacity shall be provided to maintain required pressure and flow. Gravity Distribution: • From the water Tank, water shall be supplied through a gravity-based distribution system. • Vertical risers and horizontal distribution pipelines shall be provided to supply water to all toilets and other domestic points across all floors. System Design: • The entire distribution network shall be designed to optimize flow rate, pressure, and water quality. • All pipelines shall be of approved material and size, suitable for potable water. • The system shall comply with relevant CPWD / NBC / Local Authority norms.

Sewer System

Siya Complex is located in an already developed scheme sewerage system shall be provided for the building to ensure safe and hygienic disposal of wastewater. • All soil, waste, and sewage from toilets and other sanitary fixtures shall be collected through a dedicated sewerage network. • The sewer lines shall be constructed using R.C.C. pipes, laid at proper gradients to ensure self-cleansing velocity. • Inspection chambers / manholes of 450 mm internal diameter shall be provided at suitable intervals, junctions, changes in direction, and levels, as per the approved MEP system design and relevant standards. • The sewerage network shall be designed to prevent leakage, backflow, and odor nuisance. • All sewer lines shall be properly vented and provided with necessary traps as per plumbing norms. • The system shall comply with applicable CPWD / NBC / Local Authority guidelines

Drain

A separate storm water drainage system with ground water recharge provision (rainwater harvesting) shall be provided for the site. • Rainwater from terraces, roofs, paved areas, and open spaces shall be collected through a dedicated storm water drainage network. • The collected storm water shall be conveyed through properly sized pipelines and drains to rainwater harvesting / ground water recharge structures. • Adequate filter media and silt traps shall be provided before recharge to prevent choking and contamination. • Excess storm water, after groundwater recharge, shall be safely discharged into the BIDA storm water drain line as per the approved layout and specified plan. • The entire system shall be designed to prevent waterlogging and ensure efficient surface runoff management. • The storm water drainage system shall comply with applicable NBC / CPWD / Local Authority guidelines .• Desilting Chamber of 2.5m X 1.5 m X 1.0 m recharge pit of 3 m dia and recharge borewell of 300 mm dia of 15 m depth.

Parks

N/A. (Siya Complex is Situated in a well established Bhadohi Industrial Development Authority BIDA Rajpura Scheme Phase-2 Colony).

Tree Planting

Planted trees and bushes is the part of green area As per sanctioned plan.

Design For Electric Supply Including Street Lighting

A Centralized transformer, HT panel, LT panel, Feeder Pillar, and DG backup for common services like external lighting and other essential area is proposed as per sanctioned plan, L.T. Cable line, Feeder pillar, Street lights, will be provided. A 600x600 mm manhole will be provided for the L.T., L.V., and H.T. lines. Transformer capacity is 300 KVA.

Community Buildings

N/A. (Siya Complex is Situated in a well established Bhadohi Industrial Development Authority BIDA Rajpura Scheme Phase-2 Colony).

Treatment and Disposal System of Sewage and Sullage water

A comprehensive system shall be provided for the collection, treatment, and disposal of sewage and sullage water generated from the building. • All sewage and sullage water from toilets and other sanitary fixtures shall be collected through a separate sewerage network. • The collected wastewater shall be conveyed through R.C.C. sewer lines laid at appropriate gradients to the Septic Tank. • The entire treatment and disposal system shall be designed to prevent contamination, odor nuisance, and environmental pollution

Solid Waste Management And Disposal System

A systematic Solid Waste Management and Disposal System shall be provided to ensure hygienic handling and environmentally safe disposal of solid waste generated from the premises. • Recyclable waste shall be stored separately and handed over to authorized recyclers / agencies. • Non-recyclable and inert waste shall be disposed of through the Municipal solid waste collection system. • The entire solid waste management system shall comply with Solid Waste Management Rules, 2016 and guidelines issued by the Local Authority

Water Conservation System

A comprehensive Water Conservation System shall be implemented to promote efficient use of water and minimize wastage within the premises. • Rainwater harvesting and groundwater recharge systems shall be incorporated to utilize rainwater effectively. • The overall system shall be designed in compliance with NBC / CPWD / Local Authority guidelines and applicable water conservation norms.

Energy Management System Including Use of Renewable Energy

We will use LED lights as well as solar lights in external areas for energy management system and considering Roof Top Solar Power Plant in selective areas as per UP Neda Lucknow requirement.

Fire Protection And Fire Safety System

NA

Social Infrastructure And Other Public Amenities Including Public Health Services

N/A. (Siya Complex is Situated in a well established Bhadohi Industrial Development Authority BIDA Rajpura Scheme Phase-2 Colony).

Emergency Evacuation Services

NA

Other Miscellaneous Work

NA

Documents

Extract of Khatauni

No: 1996 | Date:

Extract of Khatauni

No: 1430-1435 ( Khasra N. 93 Mi | Date:

Details of Encumbrances

Uploaded: 02-02-2026

Commencement Certificate

Uploaded: 03-02-2026

Proforma of Application Form

Uploaded: 02-02-2026

Proforma of Allotment Letter

Uploaded: 09-02-2026

Proforma of Conveyance Deed

Uploaded: 02-02-2026

Waste Disposal Plan

Uploaded: 04-09-2025

Water Supply Plan

Uploaded: 04-09-2025

Electricity Supply Plan

Uploaded: 04-09-2025

Development Work Plan

Uploaded: 04-09-2025

Affidavit

Uploaded: 03-02-2026

CA CERTIFICATE

Uploaded: 05-02-2026

ARCHITECT CERTIFICATE

Uploaded: 15-02-2026

ENGINEERS CERTIFICATE

Uploaded: 06-02-2026

Other

Uploaded: 04-09-2025

Proforma of Agreement for Sale

Uploaded: 11-02-2026

Permits

Orignal Permit No13612
Orignal Permit Date21-12-2024
Valid Upto20-12-2029
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto20-12-2032
End Date20-12-2029
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)RKD Aluminium Peopels
Contractor AddressKhemapur Gorai District Varanashi
Architect NameKISHORE KAPOOR
Architect AddressFlat no. 3, Block 2, Rajshree apartments, Siddhgiribagh, Varanasi
Architect Licence NumberCA/87/10966
Structural Engineer NameRam Darash Bharti
Structural Engineer AddressBIDA Bhawan Rjpura Road Bhadohi -221401
Mobile number(Project Co-ordinator)9450236763

Land Details

AFS

Showing 1 blocks with 4 units

Property Summary

Total Carpet Area

76553.00

824008.84 ft²

Total Units

61

1 different types

Blocks & Floors

1

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:1254.97
Balconies:0
Parking ratio:0.00 per unit

Block 0

4 units

Khasra Details

Total Area

5610.00

60385.48 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No93 Mi
Area(In Sq. Mt.)5610

Other Details

Contractor Name (if any)RKD Aluminium Peopels
Contractor AddressKhemapur Gorai District Varanashi
Architect NameKISHORE KAPOOR
Architect AddressFlat no. 3, Block 2, Rajshree apartments, Siddhgiribagh, Varanasi
Architect Licence NumberCA/87/10966
Structural Engineer NameRam Darash Bharti
Structural Engineer AddressBIDA Bhawan Rjpura Road Bhadohi -221401
Mobile number(Project Co-ordinator)9450236763