RERA Received Date
Completion Date
RERA ID
25.377699
82.568274
Plot is already demarcated. all the development and construction work will be done under the demarcated plot.
N/A. (Siya Complex is Situated in a well established Bhadohi Industrial Development Authority BIDA Rajpura Scheme Phase-2 Colony).
Siya Complex is Located in an already developed Scheme in which North Side 12.00 M Wide Bituminious Road and East Side and South side 09.00 M wide Road around the building .
A footpath with a PCC base and 20 mm thick Chequered paver blocks shall be provided as per the drawings.
The water supply system for the building shall be designed to ensure reliable, hygienic, and adequate water availability for fire protection as well as domestic use. Source & Storage: • For domestic use undergrond tank of capacity of 25000 liters through overhead water tank • The primary source of water shall be a bore well (tube well). • Water from the bore well shall be conveyed through suitable pipelines to the Rooftop Water Tank . • The Water Tank shall be compartmentalized into Fire Water Tank and Domestic Water Tank as per applicable norms. Fire Water Priority: • Water from the bore well shall first be filled into the Fire Water Tank in the Storage tank to ensure uninterrupted fire-fighting water availability. • After the fire tank is fully charged, overflow water shall be diverted to the Domestic Water Tank. Pumping & Distribution: • Water from the domestic section of the Water tank shall be pumped using electrically operated pumps to the Overhead Tank (OHT). • The pumping system shall include necessary control valves, non-return valves, pressure gauges, and isolation valves. • Adequate pump capacity shall be provided to maintain required pressure and flow. Gravity Distribution: • From the water Tank, water shall be supplied through a gravity-based distribution system. • Vertical risers and horizontal distribution pipelines shall be provided to supply water to all toilets and other domestic points across all floors. System Design: • The entire distribution network shall be designed to optimize flow rate, pressure, and water quality. • All pipelines shall be of approved material and size, suitable for potable water. • The system shall comply with relevant CPWD / NBC / Local Authority norms.
Siya Complex is located in an already developed scheme sewerage system shall be provided for the building to ensure safe and hygienic disposal of wastewater. • All soil, waste, and sewage from toilets and other sanitary fixtures shall be collected through a dedicated sewerage network. • The sewer lines shall be constructed using R.C.C. pipes, laid at proper gradients to ensure self-cleansing velocity. • Inspection chambers / manholes of 450 mm internal diameter shall be provided at suitable intervals, junctions, changes in direction, and levels, as per the approved MEP system design and relevant standards. • The sewerage network shall be designed to prevent leakage, backflow, and odor nuisance. • All sewer lines shall be properly vented and provided with necessary traps as per plumbing norms. • The system shall comply with applicable CPWD / NBC / Local Authority guidelines
A separate storm water drainage system with ground water recharge provision (rainwater harvesting) shall be provided for the site. • Rainwater from terraces, roofs, paved areas, and open spaces shall be collected through a dedicated storm water drainage network. • The collected storm water shall be conveyed through properly sized pipelines and drains to rainwater harvesting / ground water recharge structures. • Adequate filter media and silt traps shall be provided before recharge to prevent choking and contamination. • Excess storm water, after groundwater recharge, shall be safely discharged into the BIDA storm water drain line as per the approved layout and specified plan. • The entire system shall be designed to prevent waterlogging and ensure efficient surface runoff management. • The storm water drainage system shall comply with applicable NBC / CPWD / Local Authority guidelines .• Desilting Chamber of 2.5m X 1.5 m X 1.0 m recharge pit of 3 m dia and recharge borewell of 300 mm dia of 15 m depth.
N/A. (Siya Complex is Situated in a well established Bhadohi Industrial Development Authority BIDA Rajpura Scheme Phase-2 Colony).
Planted trees and bushes is the part of green area As per sanctioned plan.
A Centralized transformer, HT panel, LT panel, Feeder Pillar, and DG backup for common services like external lighting and other essential area is proposed as per sanctioned plan, L.T. Cable line, Feeder pillar, Street lights, will be provided. A 600x600 mm manhole will be provided for the L.T., L.V., and H.T. lines. Transformer capacity is 300 KVA.
N/A. (Siya Complex is Situated in a well established Bhadohi Industrial Development Authority BIDA Rajpura Scheme Phase-2 Colony).
A comprehensive system shall be provided for the collection, treatment, and disposal of sewage and sullage water generated from the building. • All sewage and sullage water from toilets and other sanitary fixtures shall be collected through a separate sewerage network. • The collected wastewater shall be conveyed through R.C.C. sewer lines laid at appropriate gradients to the Septic Tank. • The entire treatment and disposal system shall be designed to prevent contamination, odor nuisance, and environmental pollution
A systematic Solid Waste Management and Disposal System shall be provided to ensure hygienic handling and environmentally safe disposal of solid waste generated from the premises. • Recyclable waste shall be stored separately and handed over to authorized recyclers / agencies. • Non-recyclable and inert waste shall be disposed of through the Municipal solid waste collection system. • The entire solid waste management system shall comply with Solid Waste Management Rules, 2016 and guidelines issued by the Local Authority
A comprehensive Water Conservation System shall be implemented to promote efficient use of water and minimize wastage within the premises. • Rainwater harvesting and groundwater recharge systems shall be incorporated to utilize rainwater effectively. • The overall system shall be designed in compliance with NBC / CPWD / Local Authority guidelines and applicable water conservation norms.
We will use LED lights as well as solar lights in external areas for energy management system and considering Roof Top Solar Power Plant in selective areas as per UP Neda Lucknow requirement.
NA
N/A. (Siya Complex is Situated in a well established Bhadohi Industrial Development Authority BIDA Rajpura Scheme Phase-2 Colony).
NA
NA
Showing 1 blocks with 4 units
Total Carpet Area
76553.00 m²
824008.84 ft²
Total Units
61
1 different types
Blocks & Floors
1
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5610.00 m²
60385.48 ft²