Launch Date
Completion Date
RERA ID
26.740664
81.072929
To be done by CC pillers.
NA
From the main entrance gate we have RCC road through out the project of width 7.5m,9m,12m,18m,24m respectively.
Interlocking tiles and green grass.
We will provide 2 Nos of pump for the requirement of blocks through underground pipelines, borewell, 3Nos of capacity.
Modular sewerage system shall be provided. All sewerage water shall go to the STP and overflow from the STP shall go to the sewerage system provided by the municipality.
Storm water tank shall be provided. Storm water from roads and other landscapes shall go to rain water harvesting pit for recharge of ground water level through storm water drain channel. Overflow from this pit will go to Municipal drain line.
We will provide green area with different activities and the green area will have gaming facilities for kids.
We will provide many types of trees all along the divider and footpaths.
We will design and implement the system as per the local electricity board and will consider centralized transformer, HT panel, LT panel, Feeder pillar and DG back for common services like external lighting, STP, Pump room, etc.
NA
Modular Sewerage system shall be provided. All the water will go to STP and overflow from STP will go to municipal drain.
There is a proper garbage collection area provided for solid waste management.
We will suggest individuals to use low flow fixtures as well as dual flush cisterns and raw water harvesting system to reduce water consumption and improve ground water level.
We will use LED lights fittings in the external areas as well as solar lights. In the pump room also we will use energy efficient motors. We will also suggest Individuals to use energy efficient lights and electrical equipments.
NA
NA
NA
NA
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
132941.00 m²
1430963.63 ft²