25.461908
78.531601
Plot is already demarcated all the development and construction work will be done as per sanctioned plan.
Brick made boundary wall combination of RCC is proposed around the project at the height of 8 ft is proposed as per sanctioned plan.
9 Mt wide Apex road is proposed as per sanctioned plan.
1 mt. wide footpath using interlocking paver block is proposed along both side of the road, will be developed as per sanctioned plan.
Water supply using drinking water facility will provide threw pipe line is proposed as per sanctioned plan.
A centralised sewer system is provided, underground sewer line is constructed which will linked with main dumping point. If required STP ETP plant will be installed as per requirement for recycling of waste material. Service manhole (inside Plot)- Size 600X600 (outside Plot) Size 5000/8000
Storm water system will be provided which will be connected to the Municipal drain line as per specified plan.
Park is proposed as per sanctioned plan. many types of bushes trees and flowers will be planted at the park.
Tree planting is proposed as per sanctioned plan.
Centralized transformer, HT panel, LT panel, Feeder Pillar and DG backup for common services like external lighting. is proposed as per sanctioned plan.
There is no community building proposed in our project.
For treatment and disposal system of sewage and sullage water, STP is proposed as per sanctioned plan.
For Waste management and garbage collection dustbin is proposed as per layout and after completing the project it will be handed over to the local municipal corporation.
A well designed rainwater harvesting system shall be provided.
We will use LED lights as well as solar lights in external areas.
N/A
N/A
N/A
N/A
Total Area
7505.00 m²
80783.07 ft²