Total Units
52
1 unit type
Carpet Area
19,075 ft²
1,772.16 m² · carpet only, excludes balcony
Blocks & Floors
2
6 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 367 ft² (34.08 m²)Balconies 0Parking per unit 0.00
All blocks
Showing 6 of 6 rows · 5 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit |
|---|---|---|---|---|
| EWS | GF | OTHER | 9 | 332 ft²30.88 m² |
| EWS | 1 | OTHER | 9 | 332 ft²30.88 m² |
| EWS | 2 | OTHER | 8 | 332 ft²30.88 m² |
| LIG | GF | OTHER | 9 | 401 ft²37.28 m² |
| LIG | 1 | OTHER | 9 | 401 ft²37.28 m² |
| LIG | 2 | OTHER | 8 | 401 ft²37.28 m² |
Total Plot Area
0.446 acres
1,804.64 m² · plot area
NA
Wall in brick masonry in ratio of 1;6 cement mortar.
Laying of roads with proper longitudinal and cross-sectional road slopes over well compacted subgrade with 75 mm or more layers of GSB as per requirement.
Laying of interlocking pavers of 40mm over well compacted subgrade with GSB layers.
Fresh Water Supply Line from common Tank as per MEP drwaings.
Laying of DWC pipes and making of circular manholes of required size e.g. (600x600mm) in brick masonry with manhole covers as per MEP design
Laying of DWC pipes and making of catch basin of required size e.g. (450x450mm) in brick masonry with mahole covers as per MEP design
Landscaping of the park with plantation including trees, shrubs and ground covers etc.
Plantation of various types of trees as per landscape consultant drawings e.g. (Champa etc. )
Laying of overhead HT and LT cables from main electricity board connection to transformers and upto plots for individual connections ( Which shall be directly obtained by the owners from the lelctricity board) along with fixing street lights with provision of required capacity transformers as per UPPCL guidelines.
NA
Construction of STP collection tank along with modular treatment system and laying of DWC pipes from STP as per MEP drawings. Treated water to be used for irrigation.
Designated area for collection and loading of Garbage with dustbins has beenP provided
Installation of Rain Water Harvesting system for Percolation of rainwater to maintain the local ground water levels as per approved norms and MEP drawings.
NA
NA
NA
NA
NA
Shri Radha Gulmohar-4 Ews And Lig is located in Mathura.
Yes. Shri Radha Gulmohar-4 Ews And Lig is registered under UPRERAPRJ481444/09/2024 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Shri Radha Gulmohar-4 Ews And Lig is 2 November 2026.
Shri Radha Gulmohar-4 Ews And Lig is developed by SJP GLOBAL LTD..
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.