Demarcation has been completed as per layout.
The project will be secured with a robust boundry wall, comprising a 5.0 m deep RCC M25 diaphragm substructure for structural stability. The visible portion of the wall shall have a height of 3.6 m, providing security, privacy, and a defined project perimeter. The design ensures long-term durability, resistance to lateral soil pressures, and compliance with structural safety standards.
The internal roads are design and constructed to comply with NBC, suitable for carrying fire tenders. The payment structure is engineered with adequate sub-base, base and wearing course thicknesses to ensure durability, stability, and long service life under sustained load conditions.
The project will be provided with durable footpaths with PCC base.
Water will be sourced from the bore well and pumped to the Over Head Tanks (OHT) via underground storage for distribution. An exclusive RCC storage tank is provided for domestic water supply, ensuring adequate capacity, reliable storage, and unintrrupted supply to all units within the project.
The development is equipped with a well-planned sewer network comprising wastewater pipes and soil waste pipes. These pipelines are connected to strategically located inspection chambers, ensuring ease of maintenance and monitoring. The entire network leads to the STP, where wastewater is treated to prescribed standards. The treated water is then stored in an RCC storage tank and reused for garden.
The project shall be provided with surface drainage. These drains are designed for efficient collection and discharge of surface runoff. Thereby facilitating smooth disposal of stormwater and preventing surface waterlogging within the premises.
Provided
The landscape development includes plantation of Polyalthiya longifolia (Ashoka/ Mast Tree), a vertical evergreen species with non-invasive roots, planted at such spacing to form a uniform green avenue and act as a natural screen. To enhance the ground cover and provided a lush visual effect, Alternanthera shrubs shall be planted underneath, creating a layered planting scheme that adds color, texture, and density to the landscape.
The project will be equiped with high street lighting poles, fabricated from hot-dip galvanized steel for enhanced durability and corrosion resistance. Each pole will be fitted with energy-efficient LED street lights. The network will include evenly spaced inspection chambers for ease of maintenance. c/c as per requirments.
The ground floor of the clubhouse is dedicated entirely to a community building, designed to serve as a central space for social interaction, gatherings and recreational activities for residents. The layout ensures accessibility, functional utility, and a welcomoing environment, fostering a sense of community within development.
The development is equipped with a well-planned sewer network of wastewater pipes and soil waste pipes. These pipelines are connected to strategically located inspection chambers, ensuring ease of maintenance and monitoring. The entire network leads to the STP, where wastewater is treated to prescribed standards. The treated water is then stored in an RCC storage tank and reused for garden irrigation thereby promoting sustainability and reducing fresh water consumption.
Garbage generated within the project will be manually collected from each floor and transported to a designated garbage processing area. After segregation and temporary processing, the waste shall be removed from the site by the Municiple Corporation, ensuring hygienic handling, compliance with local regulations and maintenance of a clean and healthy environment within the premises.
The treated water is then stored in an RCC storage tank and reused for garden irrigation and drip irrigation along the roadside, thereby promoting sustainability and reducing fresh water consumption.
The project shall be equipped with a solar water heating system for kitchens designed to comply with the Energy Management System (EMS) requirments. The system utilizes renewable solar energy to reduce conventional energy consumption, enhance sustainability, and support efficient energy management across the development.
The project shall be equipped with a comprehensive fire protection and fire safety system in compliance with applicable fire safety regulations and the fire approval. Key components include- Fire extinguishers for localised fire control. Hose reels and wet risers for immediate fire fighting access. Yard hydrants for outdoor fire suppression. Automatic sprinkler system for continuous area protection. Manually operated electric fire systems and electrically operated fire system for emergency intervention. Automatic detection and alarm system for early warning and safety monitoring. Underground static water storage tank and terrace tanks to ensure adequate water supply for firefighting. Pump near UG tank to maintain pressure and facilitate rapid water delivery to all firefighting systems. This integrated system ensures efficient fire response, occupant safety, and compliance with statutory fire safety standards throughout the development.
The ground floor of the clubhouse is dedicated entirely to a community building, designed to serve as a central space for social interaction, gatherings, and recreational activities for residents. The layout ensures accessibility, functional utility, and a welcoming environment, fostering a sense of community within the development.
A dedicated refuge area has been provided on the 18th floor, adjacent to Staircase-1, to ensure the safety of occupants in the event of a fire or emergency. The space is designed to comply with fire safety regulations, offering a protected and easily accessible safe zone where residents can temporarily assemble while awaiting evacuation or rescue.
Club House with recreational activities.
Showing 2 blocks with 193 units
Total Carpet Area
19442.56 m²
209277.77 ft²
Total Units
181
5 different types
Blocks & Floors
2
24 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
6724.98 m²
72387.01 ft²