Have queries on this Project?
27.37258
77.23466
No: UP51921382950947X-161-23-05-2025 | Date: 23-05-2025
Total Area
113945.67 m²
1226499.80 ft²
by Fixing of RCC muddi on all corners of the plots
230 mm Wall in brick massonary with FPS Bricks of class designation 75 in ratio of 1.6 cement mortar on RCC footing and colum structure.
Laying of Road with proper longitudinal and cross-sectional road slopes in Cobble Stoneover well compacted subgrade with 75 mm and 50 mm layers of send.
Laying of designing Tiles of 40 mm over well compacted subgrade with GSB layers.
Laying of 50, 65, 80 (OD) UPVC Fresh Water Supply Line from Underground Tank to Individual plots with Proper Air Valve, Sluice Valve in Chambers, Scour Valve and Fire Brigade Outlet Connection at Underground Tank, as per MEP Drawings.
Laying of SN-4 pipes DWC pipes and making of circular manholes and retangular manhole of size 900 x 800 MM with 600 x 600 mm Manhole cover for main line with Proper finished formation level, Invert Level of manhole and connection to individual plots, as per MEP drawings.
Laying of DWC/RCC NP-3 pipes for Strom water drainage throughout the project with circular manholes and retangular catch basins of size 700 X 700 on main line, rectangular catch basin of size 450 x 450 x 450 for individual plots (in plot owners schope), de-Silting Chamber of dia 1.5 m and Recharge Well Size 1.2 Dia. In coordination with finished formation levels, invert level of manhole and flow rate, as per MEP drawings.
Landscaping of the parks with plantation including trees, shrubs and ground covers and recreational areas with benches, sports facilities such as badminton court, mini basketball court, and walkway.
Tree Plantation of Turmal Elia, Ficus Panda and palm tree throughout the project in parks and on Roadside to provide shade, as per landscape drawings.
Laying of overhead HT and LT cables from Main electricity board connection to Transformers and upto plots for individual connection (which shall be be directly obtained by the plot owners from the electricity board) along with fixing of 30 W and 50 W Street lighting on 9 m and 11 m Steel tubular poles with provision of required capacity Transformers as per UPPCL guidelines.
NA
Construction of STP collection tank along with modular treatment system and laying of DWC pipes from STP to individual plot and green areas for flushing and irrigation as per MEP drawings and overflow discharge connected to the Government Drain.
Construction of Garbage Rooms in bricks load bearing Structure with dustbin, collection room and loading area.
Installation of Rain Water Harvesting pits for percolation of rainwater to maintain the local groundwater level as per approved layout from applicable authority and laying of sewage treated Water Supply Line to plots and green area for flushing and irrigation, as per MEP drawings.
NA
NA
NA
NA
NA