Launch Date
Completion Date
RERA ID
24.477308
77.646413
Residential Plots of different sizes for public, plots as approved by the authorities and demarcated on approved map and accordingly the demarcation will be done on the site.Plots In Sq Mtr. 0-100 (63), 100-150 (35), 150-200 (1) & Commercial Plot Space Area 326.75 Sq. Mtr
Construction of Boundry wall will be 8 Feet height with Brick Work and RCC Coloumn
Details of Road as follows: - Main Entry Road is Flexible Pavement Roadand with width 15 meter, thickness of Sub base - 300mm and Bitumen thickness -40mm. Remaining 9m,7.5m Roads are Rigid Pavement road M-20 grade of thickness 150mm for main road and 100mm for Branch Roads.
NA
Supply and laying of 80 mm dia pipe ISI mark including of fitting labour material T & P etc. required proper completion of work as directed by engineer incharge and construction of underground water tank
Sub-mains with provision to link the disposal to each and every plot through chambers/ manholes will be laid in front of all the plots and these sub-mains will be connected to the manholes of trunk mains laid in the service corridors of the arterial and sub-arterial roads. The trunk mains will ultimately terminate into the STP where the sewerage will be treated. Supply, laying and jointing 600mm dia to 200mm dia NP-3 hume pipe in proper slop and alignment
Construction of "U" type K.C.A. and "B" type drain with base concrete brick work. Cement, sand plaster and cc all
Park and all green areas have been demarcated. Boundary wall work on parks has been initiated. Actual horticulture work shall be started after completion of civil work.
Trees of different species will be planted on the periphery of the site and along roads, Big leaf trees will also be provided on the periphery.
Supply and fixing electric poles with conducors as per specification of UPSEB etc.
NA
STP Plant of Capacity 10 KLD has been Installed for Sewer Treatment and 63 mm MDPE Pipe has been laid for the treated water for the parks.
Places has been demarked and created for garbage collection and Construction of Dalav Ghar as per detail design and specification approved by MVDA etc.
Rain water harvesting all complete with RWP line
NA
NA
NA
NA
Construction of boundary wall
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
16869.00 m²
181576.23 ft²