RERA Received Date
Completion Date
RERA ID
25.382611
82.895583
Yes, the demarcation of the plot has been successfully completed, covering a total land area of 1,034.40 sq.mtrs.
Yes, a 1.8 mtrs. high boundary wall has been constructed with RCC footings and RCC columns at intervals, along with 230mm brickwork and plaster on both sides, including provision for boundary wall lights, etc.
Yes, compacted earth with a consolidated subgrade has been prepared, followed by laying two layers of 115 mm thick water bound macadam, along with RCC flooring (M20, trimix finish) provided with minimum reinforcement, and construction joints filled with polysulphide sealant (Thio flex 600),etc
Yes, a 1.5 mtrs. wide footpath will be constructed using interlocking pavers, as per the sanctioned plans.
Yes, adequate provision for treatment, storage, and distribution networks will be made as per the prescribed norms. The standards laid down by the GOI for providing potable water supply shall be ensured.
Yes, a proper sewerage system will be constructed using RCC/UPVC pipes as per the approved drawings, and the sewage will be treated through an STP. The treated water from the STP will be reused as mentioned above, and the residual discharge will be disposed of into the government system.
Yes, the drainage system will be constructed using RCC/UPVC pipes as per the approved drawings. The system will comprise an internal drainage network with ultimate disposal, including 100 mm diameter vertical pipes and 200 mm diameter ground pipes.
NA
Yes, 20 trees will be planted along the boundary wall and internal roads, wherever feasible, to create a green and shaded environment.
Yes, transformers with RMU will be installed along with energy meters for each flat and distribution boards, including backup power supply through armoured cables of the required capacities. Street lighting will be provided with single poles having double lights wherever necessary and single poles with single lights where required, using LED fixtures for energy efficiency, along with series connection connected to the main Control Panel. The electrical Infrastructure will include one 100 KVA DG and one 160 KVA Transformer.
NA
Yes, a septic tank measuring 3 meters x 2 metres with a depth of 3 metres will be provided for the treatment of sewage water. The treated water will be reused for horticulture and the flushing system. Solid waste will be segregated and disposed of in accordance with the prescribed conditions.
Yes, a septic tank and designated garbage storage yards will be provided.
Yes, an adequate number of rainwater harvesting pits have been provided.
Yes, solar panels and LED lights shall be extensively used.
Yes, a public addressing system will be provided, along with sprinklers in the parking and common areas. External fire hydrants will be installed, and each typical floor will be equipped with a hose reel cabinet with hydrant and addressable smoke detectors. Proper signage will be displayed on every floor and at fire escape staircases. A fire main switch will be provided in each lift, along with a fireman switch at the entrance gate for fire brigade operations, etc.
NA
Firefighting equipment, such as fire extinguishers, fire suppression systems, fire hydrants, and fire sprinkler systems, will be installed as per the norms of the fire department.
A proper security system, including security guards, CCTV cameras, and controlled access, will be provided
Showing 1 blocks with 20 units
Total Carpet Area
333.30 m²
3587.61 ft²
Total Units
20
1 different types
Blocks & Floors
1
2 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1855.00 m²
19967.03 ft²