Layout of various housing unit with making permanent burji/marking. completed.
RCC column with m20 , brick work with 1;6 mortar, 9" thickness of boundary wall, 6ft height of wall with plinth protection.
Proving anf Laying of morum in layers of 150 mm thick included raimmimg watering , 6 mtr wide road provided
Narrow footpath provided with roads
EXISTING GROUND WATER SUPPLY AND SHORTLY THROUGH AMRIT YOJNA OF JAL NIGAM UNDE R PROGRESS
Providing and laying pipes of appropriate capacity and specification providing cushion of concrete around pipes and made connection From Sewer treatment plant
storm water drain shall be provided
Parks will be provided as per drawings to maintain green area.
plantation provided as per norms and to maintain greenary.
Ms pole fixed with CC included electrical copper wiring.
N/A
All internal sewer and sullage water line shall be connected to Sewer treatment plant
Waste disposal and collection will be Done at gate number 3 . where it will collect by nagar nigam waste collection facility.
All well designed rain water harvesting will be provided to conservation of water.
LED fittings and other energy system shall be provided.
Under ground and overhead water tank provided for fire safety.
NOT APPLICABLE
Both side stair case provided along with lift for emergency evacuation
Not Applicable
Total Area
2242.00 m²
24132.66 ft²