Launch Date
Completion Date
RERA ID
25.21556
82.56398
Plot is already well demarcated and all the development and construction work done under the boundary wall
Bricks made boundary wall combination of RCC is proposed around the project
6 Mt. wide drive way is proposed which connected to the 24 mt. wide main road.
Footpath will be built through interlocking tiles
Over head water tanks shall be provided on the building terrace for distribution through gravity
A Centralised sewer system is provided, under ground sewer line is constructed which will linked with main dumping point if required STP ETP plant will be installed as per requirment for recycling of waste material.
Storm water system will be provided which will be connected to the muncipal drain line as per specified plan
There is no park but green area is proposed as per sanctioned plan
There is several provisions for tree planting as per the approved area for the whole projec
centralized transformer HT panet, LT panel, Fender Fitur and DG back for comunen services the external lighting
There is no community building is proposed in our project.
A centralized sewerage system shall be provided which will be connected to the munchpat sewerage
There is proper garbage collection area for solid waste management
A well designed rainwater harvesting sistem shall be provided.
We will use LED lights as well as solar lights in external areas.
Since the building is less than 50 meter in height all the fire norms shall be folloved as per NBC and approval of the fire departinent.
Not Applicabile
Staircase will be provided with emergency exit doors in each floor
Luxurious entrance lobby shall be provided
Showing 1 blocks with 68 units
Total Carpet Area
4088.47 m²
44007.88 ft²
Total Units
66
2 different types
Blocks & Floors
1
9 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2348.00 m²
25273.64 ft²