We have one plot of size 4703 sq. mtr.having 1 main entrance gate from the 66 m wide front road.
2 m high and 230 mm thick Brick work and rcc work in column and beam.
From the main entrance gate we have 80 mm thick interlocking brick /RCC road through out the project.
We would not provide any footpath
We will provide Two nos. of pump for the requirement of blocks through underground pipelines
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatement. after treatement ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system in future or a seasonal natural drain running along the site boundary. .
Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.
We will provide green area with the different activities and the green area will have gaming facilities for kids.
We will provide many type of trees in green area
We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, STP, Pump room etc.
One community building will be developed under project premises with Multipurpose Hall For Yoga/Meeting/Indoor Games,Well Equipped Gym,Society Office,Shop etc.
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatement. after treatement ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system in future or a seasonal natural drain running along the site boundary.
There are a proper garbage collection area provided for the solid waste management.
A well designed rain water harvesting system shall be provided for the whole building complex to conserve water.
We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Since the building is less than 45m in height all the fire norms shall be followed as NBC and approval of fire department
We are providing common washrooms for the visitors/drivers, guard rooms, etc.
Fire Staircase is provided in the building, with fire exit signboards & sprinklers in basements. There will be 1 (one) access and exit in case of emergency
We will provide grand entrance gate etc.
Showing 2 blocks with 130 units
Total Carpet Area
10043.74 m²
108109.81 ft²
Total Units
130
4 different types
Blocks & Floors
2
15 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5560.00 m²
59847.28 ft²