Launch Date
Completion Date
RERA ID
26.902730
81.102784
As per sanction plan this is rectangular plot. Having total 1 no. of entry gate and 1 no. of exit gate from the 18m wide road ,Site is surrounded by other plots on one side and one side by promoters plot.
1.8 - 2.1m high and 200 mm thick Boundry wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary .
Trimix / asphalt road will be used as per design suggested by the Architect for internal road.
All Internal roads will have narrow footpath with pavers or equivalent finishes as per landscape design.
All apartments shall be provided with domestic water for household activities and STP treated water for flushing. Clear water may also be used and user can have their individual RO system as per their requirements. The STP treated water shall also be supplied for irrigation purposes . For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water.
Centralized Sewerage system shall be Provided. All Sewarge water shall be go to the STP for treatment . after treatment , water shall be recycled and it will use in gardening. flush tanks and vehicle washing , overflow from the STP shall be connect with the Municiple sewarage system.
Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for Recharge the ground water and overflow shall be connect with Municiple drain line .
There are significant green area beside building including green parks, play areas for childrens and different recretional activities.
The trees of category ornamental , shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintain greenary and natural view.
We have designed the system as per local electricity Board and consider centralized Transformer , HT panel , LT panel , Feeder Pillar and DG back for common service like External lighting with timer control , STP , Pump Room Etc.
NA
Centralized Sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for tretement after treatment , water shall be recycle and it will use in gardening , flush tank and vehicle washing , overflow from the STP shall be connect with the Municiple sewarage system.
Project shall have waste segregation area . The solid waste shall be encouraged for segregation. Dustbin shall be provided for segregated waste in the common areas within the campus and other waste shall be handed over to the government vendors for further disposal.
A well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of recharge pits.
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor . also timer controlled panels shall be used for efficient energy management .
All fire norms shall be followed as per NBC Part 4 Code and approval of fire department fire sprinklers , FHC with pumps are provided as per norms .
NA
Fire Staricase is provided in the each building , basements have access and exit in case of emergency . Dedicated assembly areas defined in the campus . Adedquate signage is also provided.
NA
Showing 4 blocks with 84 units
Total Carpet Area
13341.46 m²
143606.14 ft²
Total Units
160
3 different types
Blocks & Floors
4
11 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
11483.00 m²
123601.86 ft²