Making suitable brick wall upto 1 feet from natural ground.
Boundary Wall with brick work in foundation upto 2 - 3 feet deep and upto height of 6 feet above natural ground level in all around the project. - 510 RMT (approx.)
Road work with specifications of subgrade, aggregate coats in two stages, premix coat and finally the seal coat. - 4159 Sq.mts. (approx.)
The footpath with curve stones soft and hard paving materials. - 1312 Sq.mts (approx.)
Water supply from borewell through underground water tanks to plot with suitable diameter of plots. - 650 RMT (Approx.)
Sewer system will be through main holes and with suitable diameter of pipes upto STP - 700 RMT (Approx.)
Drainage of storm water will be through main holes, open rain channels, suitable diameter of pipes up to water conservation systems. - 700 RMT (approx)
Park Development with green hazes, tidy plants and trees - 3430 Sq.mts (approx.
High and low height plants with different Qualities of Tree. - 28 Nos (approx.)
Electric supply with HT LP Panels using suitable electric cables through the project premises. - 15 KVA (Approx.)
N.A.
Sewage treatment plant with mixing tank, segregation tank, clarifier tank, aeration tank and sullage disposal beds. - 1 Nos
Suitable solid waste disposal systems to be install - 1 Nos - STP
Underground tank with incoming water pies and borewell field with and small boulder with suitable filter media. - 3 Nos (Approx.)
NA
NA
NA
NA
NA
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
23236.81 m²
250118.70 ft²