Shaurya Nagar

Bareilly, Uttar Pradesh
10-05-2019
Launch Date
New
Type
09-11-2021
Completion Date

Overview

Launch Date

10-05-2019

Completion Date

09-11-2021

RERA ID

UPRERAPRJ488135

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)13330
Project NameShaurya Nagar
Registration Fee (in Rs.)72000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)30
DistrictBareilly
Original Start Date-
TehsilBareilly
Proposed Start Date10-05-2019
Sanctioning Competent AuthorityBareily Development Authority
Project Cost (in Lacs)2133
Proposed Completion Date09-11-2021

Location

Latitude

28°27'18.31'N

Longitude

79°25'25.99'E

Bank Details

Account no.8794002100000375
Name Of Account HolderRAKESH SHARMA LEAD MEMBER AND RAMESH GUPTA PARTNER
Bank NamePunjab National Bank
Branch AddressEkta Nagar Bareilly U.P
Branch NameEkta Nagar Bareilly U.P
IFSC CodePUNB0879400

Development Works

Demarcation of Plots

Each block is having length-69.54Mtr and width 10.510Mtr

Boundary Wall

1.67Mtr High Boundary wall has been raised

Road Work

Roads will be provided as per the sanctioned plan of 6Mtr,5Mtr,4Mtr respectively.

Footpaths

Footpaths are provided inside the parks

Water Supply Including Drinking Water Facilities

Total 2 No.tube-wells are proposed to meet total daily water demand (141KLD Per Day) of the colony. Anticipated yield of one tube-well 15000 Ltrs per day. One Tube-well will yield 180 Cum of water for 12Hours running a day. Depth of tube-well of diameter 450mm would be in the range 125-175m.

Sewer System

Sewer drains will be provided as per sanctioned plan

Drain

Drains will be provided as per sanctioned plan

Parks

2003 Sqm area is proposed in the project for Parks

Tree Planting

Around 110 Nos of trees will be planted in the parks as well as along the road side

Design For Electric Supply Including Street Lighting

650KVA transformer, poll mounted, Oil filled with off load tap changer will be provided. Roads and parks will be lighted with duel function light and wire polls. All Blocks will have the electric connection from the Meter room provided at the Ground Floor on stair case area wall.

Community Buildings

Three Convenient shops are provided as community building

Treatment and Disposal System of Sewage and Sullage water

Bio Sewage Treatment Plant of 110 KLD with Burmi Compost Technology will be used in the Project. Sewer line will be installed for disposal of Sullage water till the STP.

Solid Waste Management And Disposal System

A Common garbage area with three side covered walls will be provided in the project.

Water Conservation System

2 Rainwater recharge pits will be provided in the project and Drains will be provided for Water Conservation.

Energy Management System Including Use of Renewable Energy

Eco Friendly Flyash bricks will also be used along with Red Bricks in the project.

Fire Protection And Fire Safety System

A 5000 Ltr Fire Storage Tank is provided over each mumty. therefore around 40000 Ltrs water will always be stored for fire safety measures.

Social Infrastructure And Other Public Amenities Including Public Health Services

Shri Ram Murti Smarak Medical College 3.5Km from Proposed site

Emergency Evacuation Services

2 Stair Cases in each block are provided for Emergency Evacuation.

Other Miscellaneous Work

Lush Green Parks, Wide Roads, Open Parking along with Continent Shops.

Documents

Registry Document

No: 4543 | Date: 24-04-2019

Commencement Certificate

Other Plan(If Any)

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 07-07-2019

Commencement Certificate

Uploaded: 21-07-2019

Other Plan(If Any)

Uploaded: 21-07-2019

Proforma of Application Form

Uploaded: 07-07-2019

Proforma of Allotment Letter

Uploaded: 07-07-2019

Proforma of Conveyance Deed

Uploaded: 21-07-2019

Waste Disposal Plan

Uploaded: 21-07-2019

Water Supply Plan

Uploaded: 21-07-2019

Electricity Supply Plan

Uploaded: 07-07-2019

Development Work Plan

Uploaded: 07-07-2019

Affidavit

Uploaded: 21-07-2019

CA CERTIFICATE

Uploaded: 07-07-2019

ARCHITECT CERTIFICATE

Uploaded: 21-07-2019

ENGINEERS CERTIFICATE

Uploaded: 28-07-2019

Permits

Orignal Permit No9714 ???/??? ??? ??? ??/2018
Orignal Permit Date01-03-2019
Valid Upto29-02-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto28-02-2025
End Date10-05-2021
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Tasleem Khan
Contractor AddressSiklapur Chaudhary, Bareilly
Architect NameAnil Kumar Saxena
Architect AddressB-340, Rajendra Nagar, Bareilly
Architect Licence NumberCA-7315/82
Structural Engineer NameBrajpal Singh
Structural Engineer AddressA-64, Vaibhav Suncity Vistar, Bareilly
Mobile number(Project Co-ordinator)8194006692

Land Details

AFS

Showing 4 blocks with 20 units

Property Summary

Total Carpet Area

11260.80

121210.13 ft²

Total Units

480

1 different types

Blocks & Floors

4

5 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:23.46
Balconies:384
Parking ratio:0.00 per unit

Block 1

5 units

Block 2

5 units

Block 3

5 units

Block 4

5 units

Khasra Details

Total Area

13330.00

143482.79 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No1327,1328
Area(In Sq. Mt.)13330

Other Details

Contractor Name (if any)Tasleem Khan
Contractor AddressSiklapur Chaudhary, Bareilly
Architect NameAnil Kumar Saxena
Architect AddressB-340, Rajendra Nagar, Bareilly
Architect Licence NumberCA-7315/82
Structural Engineer NameBrajpal Singh
Structural Engineer AddressA-64, Vaibhav Suncity Vistar, Bareilly
Mobile number(Project Co-ordinator)8194006692