NewActive

Shalimar Sky Garden

Lucknow, Uttar Pradesh
25-10-2023
Launch Date
New
Type
25-10-2028
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

25-10-2028

RERA ID

UPRERAPRJ160941

Location

Latitude

26.872849

Longitude

80.999595

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)13058
Project NameShalimar Sky Garden
Registration Fee (in Rs.)141000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)61
DistrictLucknow
Original Start Date-
TehsilLucknow
Proposed Start Date25-10-2023
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)33089
Proposed Completion Date25-10-2028

Bank Details

Account Details
Name of the AccountSREDPL Collection A/c-Shalimar Sky Garden
Account Number5458523581
Bank NameCentral Bank of India
Branch NameHazratganj, Lucknow
Branch Address72, MG Marg, Lucknow, 226001
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeCBIN0280139
Separate Account Details
Name of the AccountSREDPL Separate A/c- Shalimar Sky Garden
Account Number5458523659
Bank NameCentral Bank of India
Branch NameHazratganj, Lucknow
Branch Address72, MG Marg, Lucknow, 226001
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeCBIN0280139
Transaction Account Details
Name of the AccountSREDPL Transaction A/c- Shalimar Sky Garden
Account Number5458523693
Bank NameCentral Bank of India
Branch NameHazratganj, Lucknow
Branch Address72, MG Marg, Lucknow, 226001
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeCBIN0280139

Development Works

Demarcation of Plots

This is one plot polygon shaped abutting 76 mtr Faizabad highway from North and 18 mtr wide road on West side. Site is surrounded by other plots from other sides. Site has one entrance and one exit.

Boundary Wall

1.8 - 2.1m high and 200 mm thick Boundary wall designed. Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates are developed with boundary.

Road Work

Trimix finish/ bitumen will be used as per design suggested by the Architect for internal road.

Footpaths

All internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes.

Water Supply Including Drinking Water Facilities

All apartments shall be provided with domestic water for household activities and STP treated water for flushing. Clear water may also be used and user can have their individual RO system as per their requirement. The STP treated water shall also be supplied for irrigation purposes. For the same water tanks will be constructed in underground and on terrace. Separate tanks are provided for fire water.

Sewer System

Centralized Sewerage system shall be Provided. All Sewerage water shall go to the STP for treatment. after treatment ,water shall be recycled and it will used in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system.

Drain

Storm water system shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.

Parks

There are significant green area beside building including green parks, play areas for childrens and different recreational activities.

Tree Planting

The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommended in the landscape in order to maintain greenery and natural view.

Design For Electric Supply Including Street Lighting

We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control,STP,Pump room etc.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Centralized Sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for treatment after treatment ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system.

Solid Waste Management And Disposal System

Project shall have  waste segregation area. The solid waste shall be encouraged for segregation. Dustbins shall be provided for segregated waste in the common areas within the campus and other waste shall be handed over to the government vendors for further disposal.

Water Conservation System

A well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of recharge pits

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. Also timer controlled panels shall be used for efficient energy management.

Fire Protection And Fire Safety System

All Fire norms shall be followed as per NBC Part 4 code and approval of fire department. fire sprinklers,FHC with pumps are provided as per norms.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

Fire Staircase is provided in the each building, basements have access and exit in case of emergency. Dedicated assembly areas defined in the campus. Adequate signage is also provided.

Other Miscellaneous Work

NA

Documents

Sale Deed

No: 5871 | Date: 22-06-2005

Extract of Khatauni

No: No-booking Affidavit | Date: -

Extract of Khatauni

No: Standing Instructions Letter | Date: -

Details of Encumbrances

Uploaded: 14-09-2023

Commencement Certificate

Uploaded: 29-08-2023

Other Plan(If Any)

Uploaded: 30-08-2023

Proforma of Application Form

Uploaded: 15-09-2023

Proforma of Allotment Letter

Uploaded: 15-09-2023

Proforma of Conveyance Deed

Uploaded: 16-09-2023

Waste Disposal Plan

Uploaded: 30-08-2023

Water Supply Plan

Uploaded: 30-08-2023

Electricity Supply Plan

Uploaded: 30-08-2023

Development Work Plan

Uploaded: 30-08-2023

Affidavit

Uploaded: 30-08-2023

CA CERTIFICATE

Uploaded: 01-09-2023

ARCHITECT CERTIFICATE

Uploaded: 14-09-2023

ENGINEERS CERTIFICATE

Uploaded: 01-09-2023

Other

Uploaded: 30-08-2023

Permits

Orignal Permit NoResiComm Building/08828/LDA/BP/22-23/3142/18072023
Orignal Permit Date28-08-2023
Valid Upto27-08-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto27-08-2031
End Date25-10-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Mr. Sanjeev Saluja M/s. Sawhney Buildwell LLP
Contractor Address129-C, Gbind Nagar, Race Course, Dehradun, Uttarakhand-248001
Architect NameMr. Rudraksha Charan (42MM Architecture)
Architect AddressD-102 Chhatarpur, New Delhi-110074
Architect Licence NumberCA/2011/53000
Structural Engineer NameMr. Pankish Goel (TPC Technical Projects Consultants Pvt. Ltd.)
Structural Engineer AddressB-74, Sector-57, Noida-201301
Mobile number(Project Co-ordinator)8527567652

Land Details

AFS

Showing 1 blocks with 130 units

Property Summary

Total Carpet Area

30051.24

323468.54 ft²

Total Units

124

3 different types

Blocks & Floors

1

23 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:242.35
Balconies:480
Parking ratio:0.00 per unit

Block Tower A

130 units

Khasra Details

Total Area

13067.82

140660.71 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoTC 47, 48
Area(In Sq. Mt.)13067.82

Other Details

Contractor Name (if any)Mr. Sanjeev Saluja M/s. Sawhney Buildwell LLP
Contractor Address129-C, Gbind Nagar, Race Course, Dehradun, Uttarakhand-248001
Architect NameMr. Rudraksha Charan (42MM Architecture)
Architect AddressD-102 Chhatarpur, New Delhi-110074
Architect Licence NumberCA/2011/53000
Structural Engineer NameMr. Pankish Goel (TPC Technical Projects Consultants Pvt. Ltd.)
Structural Engineer AddressB-74, Sector-57, Noida-201301
Mobile number(Project Co-ordinator)8527567652