Launch Date
Completion Date
RERA ID
26.884066
80.9555256
As per approved sanction plan.This is single plot L shaped , having total 1 no. of entry/Exit gate and 1no. of exit gate from the 18 mtr wide front road.Site is surronded by North & East with developers plot and other plot from West side.
1.8 - 2.1m high and 200 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.
Trimix / asphalt road will be used as per deisgn suggested by the Architect for internal road.
All internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes as per landscape design.
All apartments shall be provided with domestic water for household activities and STP treated water for flushing. Clear water may also be used and user can have their individual RO system as per their requirement.The STP treated water shall also be supplied for irrigation purposes. For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water.
Centralized Sewerage system shall be Provided. All Sewerage water shall go to the STP for treatement. after treatement ,water shall be recycled and it will be used in gardening and flush tanks. oveflow from the STP shall be connected with the Municiple sewarage system.
Storm water system shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connected with Municiple drain line.
There are significant green area beside building including green parks, play areas for childrens and different recretional activities.
The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintatin greenary and natural view.
We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control,STP,Pump room etc.
Fully centralised AC community center is proposed on ground floor in one tower and Club House comprising swimming pool, multiple facilities viz. gym facility, indoor playing areas etc is proposed at 18th floor in one tower.
Centralized Sewerage system shall be Provided. All Sewerage water shall go to the central STP for treatement, after treatement ,water shall be recycled and it will be used in gardening, flush tanks. Oveflow from the STP shall be connected with the Municiple sewarage system.
There are proper garbage collection area provided for the solid waste management.
A well designed rain water harvesting system shall be provided for the whole building/villa complex to conserve water.
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor.
All the fire norms shall be followed as NBC and approval of fire department
Green/ landscape area in front/ beside of Villas including green parks, play areas for children and different recreational activities.
Fire Staricase is provided in the each building, with fire resistant doors, basements have 1 (one) accesse and exit in case of emergency. Dedicated assembly areas defined in the campus.Adequate signage is also provided.
Lush green shrubs at vacant space on ground etc.
Showing 3 blocks with 45 units
Total Carpet Area
16066.05 m²
172933.36 ft²
Total Units
87
3 different types
Blocks & Floors
3
19 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
8162.00 m²