Launch Date
Completion Date
RERA ID
26.747843
83.228526
NA
NA
50.00 Meter, 36.00 Meter,18.00 Meter,30.00 Meter Road is proposed with 0.25 Meter GSB and 0.20 Meter WMM, 0.075 Meter DBM, 0.040 Meter BC
there is provision of 1.5 meter footpath along the road
there shall be provision of proper water supply and drinking water facility with pump room and water storage facility
MBBR severage system shall be installed and there shall be provision of sewer system and stp, wtp in the project. Rain water shall be re used.
proper drain channel shall be provided. storm water drainage system shall be provided
Park and other horticulture is in design and specification of the project
Proper tree planting is in the development of the project.
We will design with the accordance this with electricity board. Electric supply and provision of street lights and hi max shall be provided
Not applicable
MBBR sewerage treatment plant shall be installed. STP and WTP is proposed in the project development. Overflow shall be connected to Municipal drain
MBBR sewerage treatment plant shall be installed. Solid waste management and disposal system shall be done by different ways like pit base composting and other modern ways..
Rain water harvesting is proposed in the project
Solar system is proposed in the plan
we are making fire station
Already provided in the project
Already provided in the project
NA
Showing 1 blocks with 1 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
148750.30 m²
1601133.38 ft²