NewActive

SBI Enclave

Lucknow, Uttar Pradesh
17-01-2018
RERA Received Date
New
Type
30-01-2021
Completion Date

Overview

RERA Received Date

17-01-2018

Completion Date

30-01-2021

RERA ID

UPRERAPRJ14899

Location

Latitude

26 46 13 N

Longitude

80 58 26 E

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)3410
Project NameSBI Enclave
Registration Fee (in Rs.)22500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)37
DistrictLucknow
Original Start Date-
TehsilSarojini Nagar
Proposed Start Date17-01-2018
Sanctioning Competent AuthorityU.P. Awas Evam Vikas Parishad
Project Cost (in Lacs)3074
Proposed Completion Date30-01-2021

Bank Details

Account no.35956484371
Name Of Account HolderU P AWAS VIKAS PARISHAD LUCKNOW
Bank NameSTATE BANK OF INDIA
Branch AddressTARAWALI KOTHI, MOTI MAHAL MARG, HAZRATGANJ
Branch NameLUCKNOW MAIN BRANCH
IFSC CodeSBIN0000125

Development Works

Demarcation of Plots

GH 1 Sector-5 Awadh Vihar Yojna Lucknow

Boundary Wall

As per design/ Specification

Road Work

As per design/ Specification

Footpaths

As per design/ Specification

Water Supply Including Drinking Water Facilities

With Tubewell/ UGR/ OHT on terrace

Sewer System

Proposed to be connected with the sewer network of Awadh Vihar yojna

Drain

Proposed to be connected with the Drain network of Awadh Vihar yojna

Parks

As per Norms

Tree Planting

As per Norms

Design For Electric Supply Including Street Lighting

As per design/ Specification

Community Buildings

As per design/ Specification

Treatment and Disposal System of Sewage and Sullage water

Through the common treatment plant in Awadh Vihar yojna lucknow

Solid Waste Management And Disposal System

As per Norms

Water Conservation System

Provision for rain water harvesting is proposed

Energy Management System Including Use of Renewable Energy

Solar energy

Fire Protection And Fire Safety System

As per Norms

Social Infrastructure And Other Public Amenities Including Public Health Services

As per Norms

Emergency Evacuation Services

As per Norms

Other Miscellaneous Work

Green area has been propsed

Documents

Registry Document

No: 2686/2005 | Date: 05-12-2007

Registry Document

No: 2686/2005 | Date: 05-12-2007

Commencement Certificate

Uploaded: 05-07-2018

Other Plan(If Any)

Uploaded: 05-07-2018

Proforma of Application Form

Uploaded: 05-07-2018

Proforma of Allotment Letter

Uploaded: 05-07-2018

Development Work Plan

Uploaded: 05-07-2018

Affidavit

Uploaded: 06-07-2018

ARCHITECT CERTIFICATE

Uploaded: 05-07-2018

ENGINEERS CERTIFICATE

Uploaded: 05-07-2018

Registry Document In Case of Own Land

Uploaded: 17-01-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 17-01-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 25-01-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 25-01-2018

Floor plans of all types

Uploaded: 25-01-2018

Floor plans of all types

Uploaded: 25-01-2018

Proforma of Application Form

Uploaded: 25-01-2018

Affidavit

Uploaded: 17-02-2018

Permits

Orignal Permit No244/2017/R-1/H.C./28-12-2017
Orignal Permit Date28-12-2017
Valid Upto27-12-2022
Revalidated Permit No483/SE(hq)/226
Revalidated Permit Date31-01-2018
Revalidated Permit Valid Upto31-07-2020
Permit Extendable Upto27-12-2022
End Date31-07-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)UNDER PROCESS
Contractor AddressUNDER PROCESS
Architect NameCIVIL CONSULTANTS
Architect Address003 GAURI APARTMENTS, MEERABAI MARG LUCKNOW
Architect Licence NumberCA/84/8214
Structural Engineer NameUNDER PROCESS
Structural Engineer AddressUNDER PROCESS
Mobile number(Project Co-ordinator)879510173

Land Details

AFS

Showing 2 blocks with 17 units

Property Summary

Total Carpet Area

5232.88

56326.20 ft²

Total Units

68

3 different types

Blocks & Floors

2

9 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:76.95
Balconies:32
Parking ratio:0.00 per unit

Block A

9 units

Block B

8 units

Khasra Details

Total Area

3410.00

36704.90 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-1 Sector-5
Area(In Sq. Mt.)3410

Other Details

Contractor Name (if any)UNDER PROCESS
Contractor AddressUNDER PROCESS
Architect NameCIVIL CONSULTANTS
Architect Address003 GAURI APARTMENTS, MEERABAI MARG LUCKNOW
Architect Licence NumberCA/84/8214
Structural Engineer NameUNDER PROCESS
Structural Engineer AddressUNDER PROCESS
Mobile number(Project Co-ordinator)879510173