Launch Date
Completion Date
RERA ID
77 27 2.92-98 36 9.64
77 27 6.02-28 36 11.38
Not Applicable
Combination of Planters with RCC /Brick solid walls and MS Works
Internal road as 6m wide for pedestrian /vehicular traffic and fire tender movement. Would be a combination of Concrete Pavers/Stone /Grass Pavers
Combination of Concrete Pavers/Stone /Grass Pavers
Flushing water, fire and domestic water tanks of requisite capacity at various locations
Underground system using uPVC (SN-4) Sewer pipes.
Underground system using uPVC (SN-4) pipes.
AS PER LANDSCAPE LAYOUT PLAN
AS PER APPROVED HORTICULTURE LAYOUT PLAN. Total number of 28 plants and 28 evergreen trees proposed in the project
AS PER EXTERNAL LIGHTING PLAN
Not Applicable
The soil and waste from toilets & kitchen will be collected in manholes in single network of RCC pipes laid under ground having manholes / inspection chambers at appropriate intervals.
As per Environment Approval and conditions laid down by the competent authorities.
Water Conservation using low flow fixtures. Flow restrictor will be used to restrict the flow of water to achieve the objective.
As per Environment Approval and conditions laid down by the competent authorities.
A fire ring main will be laid in the campus, which will feed wet risers of various floors and also the yard hydrants. The internal fire hydrant cabinet shall be strategically located near staircase for fire fighting requirement.
As per plan
Staircases and Fire lifts
As per plan
No: Book no 1, Volume 19890, page no 391-442, Document No. 6524 | Date: 28-03-2016
Showing 1 blocks with 960 units
Total Carpet Area
32741.81 m²
352429.57 ft²
Total Units
1177
2 different types
Blocks & Floors
1
27 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
12000.00 m²
129166.80 ft²