RCC solid walls with MS Works
Internal road as 6m wide for traffic and fire tender movement. Would be concrete pavers
Interlokcing pavers
Flushing Water tank, Fire and Domestic Tank of requisite capacity in all towers.
Underground system using uPVC (SN-4) Sewer pipes.
Underground system using uPVC (SN-4) pipes.
AS PER LANDSCAPE LAYOUT PLAN
AS PER LANDSCAPE LAYOUT PLAN. Total number of 50 plants and 50 evergreen trees proposed in the project
AS PER EXTERNAL LIGHTING PLAN
The Club House built up area shall be 1178.732 sqmts.
The soil & waste from Toilets & Kitchen will be collected in Manholes in single network of R.C.C. pipes laid under ground having Manholes / Inspection Chambers at appropriate intervals.
Bio-Mechanical Composter. It converts organic waste added to the machine into nitrogen rich compost by reducing its volume by almost 70-80% of the original.
Provision of Rain Water Harvesting and Water Conservation using low flow fixtures. Flow restrictor will be used to restrict the flow of water to achieve the objective.
Solar Panel Installation for supply of hot water in kitchen though geyser for 20% of population of tower from Top
A fire ring main of 150 mm dia will be laid in the campus, which will feed wet risers of various towers and also the yard hydrants. At each floor wet riser will have 63 mm dia single headed hydrant valve, 30 meter long & 20 mm dia rubber hose reel with shut off nozzle, 2 nos 63 mm dia & 15 meter long RRL type hose pipes and branch pipe with nozzle. The internal fire hydrant cabinet shall be strategically located near staircase for fire fighting requirement.
Not applicable
Staircases and Fire lifts
Not applicable
Total Area
7822.00 m²
84195.23 ft²