OngoingActive

Saya Gold Avenue (Phase 2)

Ghaziabad, Uttar Pradesh
01-07-2015
Launch Date
Ongoing
Type
30-06-2021
Completion Date

Overview

Launch Date

01-07-2015

Completion Date

30-06-2021

RERA ID

UPRERAPRJ6678

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)20036
Project NameSaya Gold Avenue (Phase 2)
Registration Fee (in Rs.)105500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)72
DistrictGhaziabad
Original Start Date01-07-2015
TehsilGhaziabad
Proposed Start Date01-07-2015
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)64312
Proposed Completion Date30-06-2021

Location

Latitude

77 22 00

Longitude

28 38 07

Bank Details

Account no.003866200000222
Name Of Account HolderSAYA HOMES RERA ACC PH II
Bank NameYES Bank Ltd
Branch AddressRajnagar District Centre , Ghaziabad
Branch NameRajnagar District Centre , Ghaziabad
IFSC CodeYESB0000038

Development Works

Demarcation of Plots

Not applicable

Boundary Wall

RCC solid walls

Road Work

Internal road as 6m wide for traffic and fire tender movement. Would be a VDF Flooring on the treated water proofed area

Footpaths

Interlokcing pavers

Water Supply Including Drinking Water Facilities

Flushing Water tank, Fire and Domestic Tank of requisite capacity in all towers.

Sewer System

Underground system using uPVC (SN-4) Sewer pipes.

Drain

Underground system using uPVC (SN-4) pipes.

Parks

AS PER LANDSCAPE LAYOUT PLAN

Tree Planting

AS PER LANDSCAPE LAYOUT PLAN

Design For Electric Supply Including Street Lighting

Electrical Meter Room near the entrance gate of the premises. ESS at the east face of the premises.

Community Buildings

The Club House built up area shall be 2218 sqmts.

Treatment and Disposal System of Sewage and Sullage water

The soil & waste from Toilets & Kitchen will be collected in Manholes in single network of R.C.C. pipes laid under ground having Manholes / Inspection Chambers at appropriate intervals.

Solid Waste Management And Disposal System

Bio-Mechanical Composter. It converts organic waste added to the machine into nitrogen rich compost by reducing its volume by almost 70-80% of the original.

Water Conservation System

Provision of Rain Water Harvesting and Water Conservation using low flow fixtures. Flow restrictor will be used to restrict the flow of water to achieve the objective.

Energy Management System Including Use of Renewable Energy

Solar Panels Installation for supply the hot water to the top 10 floors of each towers.

Fire Protection And Fire Safety System

"A fire ring main will be laid in the campus, which will feed wet risers of various towers and also the yard hydrants. "

Social Infrastructure And Other Public Amenities Including Public Health Services

Not applicable

Emergency Evacuation Services

Staircases and Fire lifts

Other Miscellaneous Work

Not applicable

Documents

Registry Document

No: Bahi no- 1, Jild no-29584, Page n0 -145 to 182, Serial no - 8688. | Date: 05-05-2015

Details of Encumbrances

Commencement Certificate

Proforma of Allotment Letter

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Water Supply Plan

Electricity Supply Plan

Development Work Plan

Affidavit

Other Plan(If Any)

Uploaded: 17-07-2018

Proforma of Application Form

Uploaded: 11-07-2018

CA CERTIFICATE

Uploaded: 29-07-2018

ARCHITECT CERTIFICATE

Uploaded: 29-07-2018

ENGINEERS CERTIFICATE

Uploaded: 29-07-2018

Registry Document In Case of Own Land

Uploaded: 31-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 31-07-2017

Waste Disposal Plan

Uploaded: 31-07-2017

Electricity Supply Plan

Uploaded: 31-07-2017

Development Work Plan

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Commencement Certificate

Uploaded: 31-07-2017

Affidavit

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Details of Encumbrances

Uploaded: 26-10-2017

Other Plan(If Any)

Uploaded: 19-12-2017

Other Plan(If Any)

Uploaded: 05-04-2018

Permits

Orignal Permit No41/191/Zone 6/12-13
Orignal Permit Date22-06-2015
Valid Upto29-09-2018
Revalidated Permit No41/191/ZONE-6/202-13
Revalidated Permit Date22-06-2015
Revalidated Permit Valid Upto21-06-2020
Permit Extendable Upto21-06-2023
End Date30-06-2021
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Prime Perfect Buildcon Pvt. Ltd.
Contractor Address78A, Rahul Vihar, Secttor - 12 Ghaziabad UP
Architect NameShivendra Nath
Architect AddressPlot No. 753 Second Floor Sec- 5 Vaishali, GZB
Architect Licence NumberCA/2012/56592
Structural Engineer NameOptimum Design Pvt Ltd.
Structural Engineer AddressB-24, Sector - 67 Noida
Mobile number(Project Co-ordinator)9818599221

Land Details

AFS

Showing 4 blocks with 277 units

Property Summary

Total Carpet Area

71496.62 m²

769582.47 ft²

Total Units

773

4 different types

Blocks & Floors

4

40 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:92.49 m²
Balconies:917
Parking ratio:0.00 per unit

Block SG 1

74 units

Block SG 2

80 units

Block SG 3

79 units

Block SG 5

44 units

Khasra Details

Total Area

20036.00 m²

215665.50 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoBahi no- 1, Jild no-29584, Page n0 -145 to 182, Se
Area(In Sq. Mt.)20036

Other Details

Contractor Name (if any)Prime Perfect Buildcon Pvt. Ltd.
Contractor Address78A, Rahul Vihar, Secttor - 12 Ghaziabad UP
Architect NameShivendra Nath
Architect AddressPlot No. 753 Second Floor Sec- 5 Vaishali, GZB
Architect Licence NumberCA/2012/56592
Structural Engineer NameOptimum Design Pvt Ltd.
Structural Engineer AddressB-24, Sector - 67 Noida
Mobile number(Project Co-ordinator)9818599221