Launch Date
Completion Date
RERA ID
77 22 00
28 38 07
Not Applicable
RCC solid walls with MS Works
Internal road as 6m wide for traffic and fire tender movement. Would be concrete pavers
Interlocking pavers
Flushing Water tank, Fire and Domestic Tank of requisite capacity in all towers.
Underground system using uPVC (SN-4) Sewer pipes.
Underground system using uPVC (SN-4) pipes.
AS PER LANDSCAPE LAYOUT PLAN
Total number of 50 lants and 50 evergreen trees proposed in the project
Electrical Meter Room near the entrance gate of the premises. ESS at the east face of the premises
The Club House built up area shall be 2168 sqmts.
The soil & waste from Toilets & Kitchen will be collected in Manholes in single network of R.C.C. pipes laid under ground having Manholes / Inspection Chambers at appropriate intervals.
Bio-Mechanical Composter. It converts organic waste added to the machine into nitrogen rich compost by reducing its volume by almost 70-80% of the original.
Provision of Rain Water Harvesting and Water Conservation using low flow fixtures. Flow restrictor will be used to restrict the flow of water to achieve the objective.
Solar Panel Installation for supply of hot water in kitchen though geyser for 20% of population of tower from Top
"A fire ring main will be laid in the campus, which will feed wet risers of various towers and also the yard hydrants. "
Not Applicable
Staircases and Fire lifts
Not Applicable
No: Bahi no- 1, Jild no-29584, Page n0 -145 to 182, Serial no - 8688. | Date: 05-05-2015
Showing 4 blocks with 312 units
Total Carpet Area
70998.43 m²
764220.00 ft²
Total Units
847
4 different types
Blocks & Floors
4
40 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
20036.00 m²
215665.50 ft²