Completed, according to the measurement and dimensions of approved layout with proper setback.
Completed, Boundary wall made of brick work of 9 inches of 5 feet height. Plaster has applied on both side along with double coat of paint.
Completed, construction of road with 15 cm thick layer of stone soiling coat 12 cm thick linter coat and 8 cm thick coat of stone ballast, 2 cm thick premixing carpet with seal coat. The road is upto the mark.
Not applicable.
Completed, construction of O.H.T., fixing of submersible pump and boring of tube well 100 mm size. Supply and laying of 90mm dia PVC ISI mark pipe. Water will get stored in Overhead Tank from there will supplied to individual units.
Completed, supply laying and jointing 150-250mm dia RCC hume pipe in proper slop. Construction of inspection camber and fixing of sewage treatment plant as per specification of UPPCB. All the waist water drain has connected to sewage treatment plant and after filter that will be used for plants and park.
Completed, construction of K.C. "A", K..C. "B" and "U" type drain as per standard design and specification by E/I etc. The water will get collected through drains in STP.
Completed, construction of park including of earth work in excavation foundation brick ballast. Suitable for children and adults for sports and physical activiteis.
Completed, tree plantation including care and maintenance.
Completed, supply and fixing of poles with conductors as per specification of UPSEB. ISI mark wires and switches are used with proper earthing arrangements.
Not applicable.
Completed, supply and fixing of sewage treatment plant as per specification of UPPCB. Waste water form units will be collected at STP to make it reusable for gardening, washing etc.
Completed, construction of dalav ghar as per design approved by Authority. It will be used to collect waste at one place. It helps to keep society clean.
Completed, construction of Rain Water Harvesting System. Rain water will be stored under ground with the help of harvesting point constructed at different location.
Not applicable.
Not applicable.
Not applicable.
Not applicable.
Completed, work in relation to betterment and requirement of project.
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
24920.00 m²
268236.39 ft²