Site is located at Khasra No 160 Part, 161 Part, 164Part, 165/1Part, 165/2Part, 167Part, 170part, 174part,175part,245part, 246part and 250part. Side is located around 200 m from Bijli Bamba-Byepass Road, Meerut. Side is approximate 1 Km from Shatabdi Nagar RRTS station.
A 2-meter high, 230-mm thick brick wall with RCC columns and beams will be constructed. At the corner facing road, the project logo will be displayed with RERA Number and RERA QR code. Iconic design gate will be fixed at the entrance of the project.
Form the main entrance gate we have 80mm thick interlocking brick/RCC road throughout the project, whose wideness starts from 10mtrs.
1.5 m wide Footpath is provided for Pedestrian wherever required on the side of road in entry exit locations. Footpath will be build with pavour block tiles .
Drinking water supply will be made at the plot. Pipeline will be connected from water Overhead Tank. Water overhead Tank of 150 KLD will be build.
We will be providing STP and overflow from the STP will be connected with the drain system.
Storm water shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connected with drain line.
Parks / Green area in the project will be approx 6002.70 SQM approx. Children play area will be provided.
Yes, more than 130 Trees of different category such as ornamental, shady and native species shall be planted in the project.
Transformer, HT Panel Room, LT Panel Room, Designer Electric Poles, Led Lights will be Provided. All Electrical related workings shall be as per bureau of Indian standards, Indian Electricity rules.
Not provided/Not applicable.
All Sewerage water will go the STP and overflow from the STP will be connected with the Municipal sewerage system. When come into force.
Solid waste generated will be will be segregated at its point of generation in the different color bins on the basis of tis biodegradability at a single disposable point, the collection and disposal of the solid waste from the project is done in such a way that it will be scientifically dispose no causing any eyesore or adverse effect to the surroundings.
Rain water harvesting system with proper rainwater harvesting pit are provided on site, water savings fixture are provided in the building treated water from STP is to be used for flushing, gardening and landscaping purpose in the building, to conserve water and waste as less possible.
We will utilize LED lighting in external and common areas, along with solar lights in landscaped zones. All engineering equipment will be energy-efficient, and we will also recommend that individuals use LED lights and energy-efficient air conditioning systems.
Fire hydrants will be installed at the site. Water connection will be arranged for fire hydrants as per requirements.
Not to be provided.
Plotted development only, hence not applicable.
CCTV camera and guard hut will be provided at the entrance of the colony.
No: LEGAL AND ENCUMBRANCE DETAILS WITH MORTGAGE DEED AND LEGAL OPINION | Date: 20-12-2024
No: PAYMENT MADE RECEIPT AGAINST POINT NO-3 OF THE SANCTION LETTER | Date: 11-01-2025
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
39995.62 m²
430508.85 ft²