This Project is of 7695.23 sq. mtr. having one main entrance gate from the front road (NH-731). The township consists of 23 residential plots and 1 commercial (sector shopping) plot. The total plotted residential area is approximately 2658.39 sq.m. Each plot is demarcated on site with permanent boundary stones and survey markings as per the sanctioned layout plan approved by the Lucknow Development Authority. Plot sizes range approximately between 103 sq.m. to 152 sq.m.
Boundary wall of 2.1 m height surrounding the project. The boundary wall is constructed along the full perimeter of the project land with brick masonry and plaster finish. One main entrance gate of approximately 6–7 meters width with security provision is provided.
From the main entrance gate with interlocking brick / RCC road / granite cobble stone / bituminous road throughout the project. Roads are of width 9 mtr, 12 mtr, and 18 mtr. The total road area in the project is approximately 3672.33 sq.m. including internal circulation roads. Roads are constructed with proper sub-grade preparation, granular sub-base, base course and finished surface with drainage slope on both sides.
We have provided footpaths of height 150 mm and width 1500 mm. Footpaths with paver blocks is constructed along major internal roads covering approximately 685.30 running meters along the road edges with precast kerb stones.
We have provided two pumps for the requirement of the project through underground pipelines. Each pump is connected with an underground water storage tank of approximately 6,00,000 liters capacity. Water supply is distributed through HDPE/PVC pipelines of approximately 90 mm to 160 mm diameter across the entire layout.
Centralized sewerage system is operational. All sewerage will go to the STP for treatment. After treatment, water will be recycled and used in gardening. Overflow from the STP shall be connected with the municipal sewerage system when it comes into force. Sewer pipelines of approximately 250-400 mm diameteris laid across the internal roads with inspection chambers at intervals of approximately 15–20 meters.
Storm water is provided. Storm water from roads and landscape areas shall be connected to the storm water drain channel and directed to rainwater harvesting pits to recharge groundwater. Storm water drains of approximately 300-400 mm width and 750 mm depth is constructed along the internal road network covering approximately 700–800 running meters.
We have provided green areas with different activities and the green area will have gaming facilities, decorative elements and landscaping. Total green/open space provided in the project is approximately 1213.43 sq.m. as per the approved layout plan. The park will include landscaped lawns, walking pathways, seating areas and children’s play equipment.
We will provide various types of trees in the green area. Approximately 29 trees including shade trees and ornamental plantation will be planted along the internal roads and park area as per the landscape plan.
We have designed and implemented the system as per the local electricity board norms including centralized transformer, HT panel, LT panel and feeder pillar. A dedicated transformer of approximately 250-400 KVA capacity will be installed. Around 25–30 LED street lights of 60 watts will be installed along internal roads at intervals of approximately 15–20 meters.
Not Applicable
Centralized sewerage system is operational. All sewerage will go to the STP for treatment. After treatment, water will be recycled and used in gardening. Overflow from the STP shall be connected with the municipal sewerage system when it comes into force. The STP have a treatment capacity of upto 850 KLD based on the projected population in the project.
A proper garbage collection area will be provided for solid waste management. A designated waste collection area of approximately 20–25 sq.m. has been developed within the project with separate bins for biodegradable and non-biodegradable waste. Waste will be periodically collected by local municipal authorities.
We will suggest individuals use low-flow fixtures and dual flush cisterns along with rainwater harvesting systems to reduce water consumption and improve groundwater levels. Approximately 4–5 rainwater harvesting pits have been constructed in the project area for groundwater recharge.
We will use LED light fittings in external areas. A panel room will also be provided to control this. Energy efficient LED lighting will be used for all external lighting with an estimated connected load of approximately 2–3 KW. Provision for installation of rooftop solar panels of approximately 5 KW capacity for common area lighting will also be kept.
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Sapphire Royale Extension is located in Lucknow.
Yes. Sapphire Royale Extension is registered under UPRERAPRJ927902/06/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Sapphire Royale Extension is 30 September 2026.
Sapphire Royale Extension is developed by SAPPHIRE INFRAVENTURES PVT. LTD.AREEBA KHANSALMA KHATOON.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.