Launch Date
Completion Date
RERA ID
27 12 29.5 N
77 56 55.4 E
Project is of Multistory residential apartment
The project is covered by 7 feet high boundary wall to provide safety for residents
C.C. Interlocking Paver Block in Parking & Drive Way
No footpath as it is a multi storey apartment
6 Huge size overhead tanks for 24 hours water supply and 6 submersible pumps to fill the water tanks
Sewer tank which will be connected to sewer line in future
All the flats have proper drainage system
3 parks having fountain , jogging track , swings for kids etc
Small and Medium size trees are planted in park and along with boundary wall for fresh air to residents
Street light is placed all over the boundary wall for proper lighting . The lighting is designed in such a way so that no part of the appartment is left in dark
No community hall but the building has sufficient common area with huge park for its residents
Sewer Tank for disposal of sullage water which would be connected to main sewer line in future
Garbage will be removed by the cleaning staff on daily basis from door to door and will be properly disposed off through municipal department
Rain water harvesting system installed
Generator powerbackup
Fire extinguisher and all fire fighting devices
School and hospital is in 1 km radius
2 staircase on each floor
the project is connected with 45 ft road and 200 mt from 80 ft road
Showing 2 blocks with 15 units
Total Carpet Area
14157.00 m²
152384.53 ft²
Total Units
180
2 different types
Blocks & Floors
2
5 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
12330.00 m²
132718.89 ft²