Have queries on this Project?
27.566868
77.659342
Showing 2 blocks with 82 units
Total Carpet Area
19447.28 m²
209328.58 ft²
Total Units
198
2 different types
Blocks & Floors
2
14 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
15929.70 m²
171465.70 ft²
The GH plot alotted by local authoriy is well demarcated and under the possession of promoter .
the boundary wall is already constrcated in phase 1 of the project and mainteined as of now and to be countinued in phase 2 .
N/A
The pathways as per sansaction map shoiuld be developed in the project around the towers .
The project shall be provided with an adequte and continuous water supply through aproved sources, inculding provison for safe and potable drinking water RAW WATER UG TANK 180 KL , DOMESTIC UG TANK 180 KL , FIRE UGT 75KL AND FIRE OHT 10KL in the compliance with local authorities .
The Project shall have a well designed sewerage system about 100KLD connected to the approved municipal sewer line with proper disposal arrangements ensuring hygiene .
The project shall be provided with an efficient storm water drainage system to ensure proper disposal of rainwater and comply with local authority
The project shall include landscape park areas for recreation and open space developed and maintained as per the prproved layout plan and applicable loacal authority norms
The project shall inculeds the tress from 1mtrs to 4 mtrs heights evergreen plants .
The project shall be equipped with a planned electrical supply system with edeqate load capacituy along with provison of street lighting in common areas 2nos. 750kva + 1no. 500 kva dg set and 2nos 800kva + 1 no. 1000kva oil type transformer
n/a
same as the above mention in sewer system plan in the project
n/a
n/a
N/a
The project shall be provided with a comprehensive fire protection and fire safety system inculding fire fighting equipment and safty measures as per approved plans
N/A
The project shall have adequate emergency evacuation arrangemmnets , including clealy marked exits , access routes and saftey provisions to ensure safe and timely evacuation in case of fire
n/a
Sanskar City Phase 2 is located in Mathura.
Yes. Sanskar City Phase 2 is registered under UPRERAPRJ824000/06/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Sanskar City Phase 2 is 23 November 2030.
Sanskar City Phase 2 is developed by N P INFRATECH PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.