Total Plot Area
3.32 acres
13,442.29 m² · plot area
The project spans a total land area of 13442.29 Sq. Meter. Each plot will be precisely demarcated on-site as per the approved layout plan, ensuring absolute transparency in boundary identification. The land is under complete and legal possession with a clear title, providing potential buyers with full assurance regarding the authenticity and security of ownership
Boundary wall length is 356.20 mt and 7.00 ft high perimeter wall, constructed with high-quality brickwork of reinforced cement, is planned for the project. This structure is designed to ensure enhanced security, maximum privacy and a clearly defined boundary for the entire project
The total road area covers 3650.28 Sq. Meters. The development plan includes well designed 9 meter and 12 meter wide roads finished with durable high grade blacktop (bituminous) surfacing for smooth transit
Complementing the road infrastructure, we are incorporating dedicated green median strips or central verges along every row to enhance the aesthetic appeal and pedestrian experiance
To ensure a reliable and efficient drinking water supply, we will implement a robust underground pipeline network. The system will be powered approx. two high capacity pumping sets (Approx. 25,000 Liters per Hour each), providing built in redundancy and consistent performance. This infrastructure is specifically engineered to ensure uninterrupted water availability for all residents while maintaining optimal water pressure throughout the project
The project will feature an advanced on site STP with an approximate capacity of 220 KLD. All sewage generated within the premises will be directed to this plant for treatment. To ensure seamless waste management and strict environmental compliance, any treated overflow from the STP will be securely connected to the municipal sewerage network
A dedicated drainage network 3 wide nali (Drains) along the road perimeter will direct all surface runoff to the on site treatment facility, preventing waterlogging and ensuring comprehensive water management across the township
We will develop a 2017.66 Sq. meter park featuring professional landscaping and multi purpose open spaces. The park will host diverse flora, providing a versatile recreational retreat for residences
We will plant a variety of evergreen trees (ranging from 1m to 4m in height) along all internal roads, creating a natural green canopy and promoting year around environmental freshness
The Project will features a centralized transformer with an approx. 500 KVA capacity. The entire electrical grid and external lighting system will be designed and implemented in strict accordance with the Local Electricity Board guidelines. To ensure safety and sustainability, all external common areas and internal roads will be illuminated by high efficiency LED street lights, providing superior visibility and significant energy savings
NA
The project features a dual system approach for treated sewage and sullage water disposal, prioritizing eco friendly discharge and local sanitation standards
A structured system for the collection and segregation of solid waste will be implemented, ensuring hygienic disposal in co-ordination with Municipal waste management services
We are committed to sustainability through rainwater harvesting and water efficient distribution systems to recharge the local water table and minimize wastage
Along the energy efficient LED fittings in common areas, we actively encourage the use of solar panels for individual units to promote renewable energy and reduce long term utility costs
The project will include essential fire safety measures, including clear access routes for emergency vehicles and strategically placed fire hydrants/equipment as per local safety norms
NA
NA
NA
Sainik Galaxy Garden 2 is located in Lucknow.
Yes. Sainik Galaxy Garden 2 is registered under UPRERAPRJ594002/10/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Sainik Galaxy Garden 2 is 26 August 2029.
Sainik Galaxy Garden 2 is developed by NEW SAINIK NAGAR BUILDERS AND DEVELOPERS PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.