Sahu City Phase 2

Lucknow, Uttar Pradesh
02-11-2023
RERA Received Date
New
Type
24-10-2028
Completion Date

Overview

RERA Received Date

02-11-2023

Completion Date

24-10-2028

RERA ID

UPRERAPRJ391104/02/2024

Location

Latitude

26.47019

Longitude

81.04115

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)56703
Project NameSahu City Phase 2
Registration Fee (in Rs.)289000
AddressProposed Housing Project at Villages-Moazzamnagar,Kabirpur , Sultanpur Road, Lucknow.
Village/Locality/Sector etc.Moazzamnagar,Kabirpur
StateUttar Pradesh
Project Duration (In month)60
DistrictLucknow
Original Start Date-
TehsilMohanlalganj
Proposed Start Date02-11-2023
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)55265
Proposed Completion Date24-10-2028

Bank Details

Account Details
Name of the AccountSLDPL Collection A/c – Sahu City Phase 2
Account Number120025187153
Bank NameCanara Bank
Branch NameHazratganj Lucknow Branch
Branch AddressP.B. No 260,31 By 32,Halwasiya Court, M.G. Rd, Hazaratganj Lucknow
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeCNRB0000363
Separate Account Details
Name of the AccountSLDPL SEP Bank A/c - Sahu City Phase 2
Account Number120025257970
Bank NameCanara Bank
Branch NameHazratganj Lucknow Branch
Branch AddressP.B. No 260,31 By 32,Halwasiya Court, M.G. Rd, Hazaratganj Lucknow
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeCNRB0000363
Transaction Account Details
Name of the AccountSLDPL RERA Trans A/c Sahu City Phase - 2
Account Number120025171025
Bank NameCanara Bank
Branch NameHazratganj Lucknow Branch
Branch AddressP.B. No 260,31 By 32,Halwasiya Court, M.G. Rd, Hazaratganj Lucknow
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeCNRB0000363

Development Works

Demarcation of Plots

We have a plot, which is divided into two sectors, namely Sector-A & Sector -B.

Boundary Wall

Boundary wall shall be minimum 1.80 meters high from formed ground level, and shall be constructed of RCC, Block Work, MS Grill. MS Grill ( painted) shall be provided on front side to enhance visibility of teh complex and for aesthetic & architectura considerations /Intent.

Road Work

We have bituminous road from external main road ( Sultanpur Road) leading to Sector A, Sector B and then within the boundary of Sector A & Sector B we shall have paver block road/ Cement Concrete Road. The width of the roads is as stated in the lay out plan.

Footpaths

Footpaths are planned along the main road.

Water Supply Including Drinking Water Facilities

We have planned two bore wells, underground water storage, over head storage and pump room for pumping the water to OHT. OHT shall be on terrace of each tower. Underground tank shall be common for teh Towers.

Sewer System

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.

Drain

Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line when come in to existence/force

Parks

We will provide green area as per norms with the different activities and the green area will have gaming facilities for kids.

Tree Planting

We will provide trees all along the main road, boundary wall & in green areas.

Design For Electric Supply Including Street Lighting

We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting,Lifts, STP, Pump room etc.

Community Buildings

We are providing Club buildings two numbers under Tower-2 & Tower-3 on Stilt Floor of these two towers. Banquets Hall on usual charges as may be decided by the Builderand or RWA on its formation.

Treatment and Disposal System of Sewage and Sullage water

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

We are providing Rain water harvesting pits, treated water from STP shall be used for Flushing & horticulture etc to minimise the water consumption from external sources including bore wells and also to improve ground water level etc.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights etc as per norms. In Pump room also all the equipment shall have energy efficient motors, efficient Lifts of reputed make. And we will suggest to individual also to use power saving fixtures & equipment.

Fire Protection And Fire Safety System

We will provide Fire Fighting facility in common areas as per approval/recommendations of Local Fire Authorities.

Social Infrastructure And Other Public Amenities Including Public Health Services

Banquets Hall on chargeable basis is being provided, school plot is being provided for construction of a primary school, club buildings on ground floor/ stilt floor of two Towers I.e. Tower 2 & Tower 3 are being provided.

Emergency Evacuation Services

We are providing fire tower as per norms, refuge areas in Towers 1 to Tower-5 and shall be providing signages at critical location for the help of users/visitors.

Other Miscellaneous Work

NA

Documents

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Extract of Khatauni

No: 1428-1433 | Date: -

Sale Deed

No: 16838 | Date: 14-09-2015

Sale Deed

No: 3088 | Date: 28-07-2008

Sale Deed

No: 18166 | Date: 08-10-2015

Sale Deed

No: 3411 | Date: 20-08-2008

Registry Document

No: 11402 | Date: 23-11-2023

Registry Document

No: 11401 | Date: 23-11-2023

Registry Document

No: 15540 | Date: 27-02-2023

Extract of Khatauni

No: 1422-1427 | Date: -

Sale Deed

No: 2792 | Date: 20-02-2014

Sale Deed

No: 2791 | Date: 20-02-2014

Extract of Khatauni

No: Service Plan | Date: -

Extract of Khatauni

No: Affidavit_Legal Heir_Death Certificate | Date: -

Sale Deed

No: 39850 | Date: 22-12-2023

Sale Deed

No: 39851 | Date: 22-12-2023

Extract of Khatauni

No: 1428-1433 | Date: -

Details of Encumbrances

Uploaded: 28-11-2023

Commencement Certificate

Uploaded: 28-10-2023

Other Plan(If Any)

Uploaded: 01-12-2023

Proforma of Application Form

Uploaded: 31-10-2023

Proforma of Allotment Letter

Uploaded: 31-10-2023

Proforma of Conveyance Deed

Uploaded: 31-10-2023

Waste Disposal Plan

Uploaded: 04-12-2023

Water Supply Plan

Uploaded: 04-12-2023

Electricity Supply Plan

Uploaded: 04-12-2023

Development Work Plan

Uploaded: 04-12-2023

Affidavit

Uploaded: 23-12-2023

CA CERTIFICATE

Uploaded: 02-12-2023

ARCHITECT CERTIFICATE

Uploaded: 28-11-2023

ENGINEERS CERTIFICATE

Uploaded: 01-12-2023

Other

Uploaded: 01-12-2023

Proforma of Agreement for Sale

Uploaded: 04-12-2023

Permits

Orignal Permit NoGroup Housing/08713/LDA/BP/22-23/1822/06072023
Orignal Permit Date25-10-2023
Valid Upto24-10-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto24-10-2031
End Date24-10-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen
Orignal Permit NoGroup Housing/08713/LDA/BP/22-23/1822/06072023
Orignal Permit Date25-10-2023
Valid Upto24-10-2028
Revalidated Permit NoGroup Housing/08713/LDA/BP/22-23/1822/06072023
Revalidated Permit Date25-10-2023
Revalidated Permit Valid Upto24-10-2028
Permit Extendable Upto24-10-2031
End Date24-10-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Self
Contractor AddressSelf
Architect NameMs. Sapna Kumar
Architect AddressA1/54, LGF, Safdarjung Enclave, New Delhi-110029
Architect Licence NumberCOA1995/18201
Structural Engineer NameMr Amrit Pal of TPC Technical Projects
Structural Engineer AddressB-74, Sector-57, NOIDA (UP) 201301
Mobile number(Project Co-ordinator)9918101595

Land Details

AFS

Showing 10 blocks with 609 units

Property Summary

Total Carpet Area

81876.02

881305.29 ft²

Total Units

1260

4 different types

Blocks & Floors

10

26 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:64.98
Balconies:1583
Parking ratio:0.00 per unit

Block Emerald T1

100 units

Block Emerald T2

100 units

Block Pearl T1

100 units

Block Pearl T2

100 units

Block Pearl T3

100 units

Block LIG Block

27 units

Block EWS Block

56 units

Block KIOSKS

1 units

Block Pearl Complex

12 units

Block Emerald Complex

13 units

Khasra Details

Total Area

56703.00

610345.42 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68 KHA, 69, 70, 71, 73, 74, 78, 79, 182, 211KHA, 213, 214, 218, 219, 220, 221, 222, 223, 224, 225, 226KA, 226KHA, 228, 229, 230, 231, 231 MIJULA, 1&3, 3KA
Area(In Sq. Mt.)56703

Other Details

Contractor Name (if any)Self
Contractor AddressSelf
Architect NameMs. Sapna Kumar
Architect AddressA1/54, LGF, Safdarjung Enclave, New Delhi-110029
Architect Licence NumberCOA1995/18201
Structural Engineer NameMr Amrit Pal of TPC Technical Projects
Structural Engineer AddressB-74, Sector-57, NOIDA (UP) 201301
Mobile number(Project Co-ordinator)9918101595