NewActive

SAHIB GREENS

Lucknow, Uttar Pradesh
26-05-2025
RERA Received Date
New
Type
25-05-2030
Completion Date

Overview

RERA Received Date

26-05-2025

Completion Date

25-05-2030

RERA ID

UPRERAPRJ721108/09/2025

Location

Latitude

26.47470

Longitude

80.53430

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)2873
Project NameSAHIB GREENS
Registration Fee (in Rs.)19500
AddressPART OF KHASRA NO.-588/1 VILL. - BARGAWA, WARD - HINDNAGAR, LUCKNOW.
Village/Locality/Sector etc.VILL.- BARGAWAN
StateUttar Pradesh
Project Duration (In month)60
DistrictLucknow
Original Start Date-
TehsilSarojini Nagar
Proposed Start Date26-05-2025
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)4500
Proposed Completion Date25-05-2030

Bank Details

Account Details
Name of the AccountMega Infra Developers-Collection Account-Sahib Greens
Account Number44374647104
Bank NameState Bank of India
Branch NameSME Nirala Nagar Branch, Lucknow
Branch AddressSME Nirala Nagar Branch, Lucknow
IFSC CodeSBIN0063814
Branch DistrictLucknow
Branch StateSelect
Branch Email Address[email protected]
Separate Account Details
Name of the AccountMega Infra Developers-Separate Account-Sahib Greens
Account Number44374630279
Bank NameState Bank of India
Branch NameSME Nirala Nagar Branch, Lucknow
Branch AddressSME Nirala Nagar Branch, Lucknow
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeSBIN0063814
Transaction Account Details
Name of the AccountMega Infra Developers-Transaction Account-SahibĀ Greens
Account Number44374658795
Bank NameState Bank of India
Branch NameSME Nirala Nagar Branch, Lucknow
Branch AddressSME Nirala Nagar Branch, Lucknow
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeSBIN0063814

Development Works

Demarcation of Plots

We have one plot of size 2926.20 sq. mtr. having 1 main entrance gate.

Boundary Wall

1.8 - 2.1 mtr high and 200 mm thick Boundary wall desigend. Brick work of 9 inches and RCC work in beam - columns shall be used as per design. Broad Entrance Gates shall be developed with Boundary Wall.

Road Work

6 Meter Trimix Road on the perifery of the plot

Footpaths

All internal roads shall have 1.0 Mtr footpath with matt finish tile pavers or equivalent as per landscape design

Water Supply Including Drinking Water Facilities

All units shall be provided with domestic water supply for house hold activities. Users can have their individual RO system for flushing. For the same, water tank of 37.50 KL are getting created on terrace. Separate tanks are provided for fire water.

Sewer System

The Sewar System shall be connected in the main sewer line by Nagar Nigam as the site is handovered to Nagar Nigam

Drain

Storm water system shall be provided. Storm water from roads & other landscape area shall be connected to the Storm water drain channel & go to the Rain Water Harvesting Pit for recharge the Ground Water.

Parks

There are significant green area beside the building including green parks, play areas for children & different recreational activities.

Tree Planting

The trees of category ornamental, shady and native species shall be planted in the entire project as per the species recommended in the landscape in order to maintain greenary & natural view.

Design For Electric Supply Including Street Lighting

The Electrical system have been desiged as per local Electricity Board, and centralized system has been considered consists Transformer, HT Panel, LT Panel, Feeder Pillar, and DG syetem

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

It is a handovered area to the Municipal Corporation and the government STP is operational, so the treatment of the Sewage and Sullage will be in the STP installed by the government through the sewar conncetions

Solid Waste Management And Disposal System

There are proper garbage collection area provided for the solid waste management.

Water Conservation System

A well designed rain water harvesting system shall be provided for the whole premises to conserve water.

Energy Management System Including Use of Renewable Energy

Energy efficient LED lights shall be used in the external areas along with the Solar lights. Water saving plumbing and sanitary fitting & fixtures shall be used.

Fire Protection And Fire Safety System

All the Fire norms shall be followed as NBC and approval of Fire Department.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

Fire Staircase shall be provided in each building with fire resistant doors, basements have one access and exit in case of emergency. Dedicated assembly areas shall be defined in the campus. Adequate signages shall also be provided.

Other Miscellaneous Work

Lush green shrubs at vacant space on ground etc.

Documents

Extract of Khatauni

No: 1427-1432 | Date: -

Registry Document

No: 32468 | Date: 04-10-2023

Registry Document

No: 15051 | Date: 29-07-2025

Extract of Khatauni

No: Death Certificate Harbhajan Kaur | Date: -

Sale Deed

No: 27870 | Date: 04-03-1993

Sale Deed

No: 27871 | Date: 04-03-1993

Sale Deed

No: 27872 | Date: 04-03-1993

Registry Document

No: Registered Will of Harbhajahan Kaur (578) | Date: 16-12-1997

Extract of Khatauni

No: Land Chart of Khasra 588/1 | Date: -

Extract of Khatauni

No: Affidavit for Khasra Mutation | Date: -

Details of Encumbrances

Uploaded: 18-08-2025

Commencement Certificate

Uploaded: 16-08-2025

Proforma of Application Form

Uploaded: 26-08-2025

Proforma of Allotment Letter

Uploaded: 26-08-2025

Proforma of Conveyance Deed

Uploaded: 26-08-2025

Waste Disposal Plan

Uploaded: 16-08-2025

Water Supply Plan

Uploaded: 16-08-2025

Electricity Supply Plan

Uploaded: 16-08-2025

Development Work Plan

Uploaded: 08-09-2025

Affidavit

Uploaded: 26-08-2025

CA CERTIFICATE

Uploaded: 26-08-2025

ARCHITECT CERTIFICATE

Uploaded: 26-08-2025

ENGINEERS CERTIFICATE

Uploaded: 26-08-2025

Other

Uploaded: 16-08-2025

Proforma of Agreement for Sale

Uploaded: 26-08-2025

Permits

Orignal Permit NoAffordable Housing/15682/LDA/BP/23-24/2871/03042025
Orignal Permit Date26-05-2025
Valid Upto25-05-2030
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto25-05-2033
End Date25-05-2030
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)MEGA INFRA DEVELOPERS
Contractor AddressB-1/236, VIKRANT KHAND, GOMTI NAGAR, LUCKNOW
Architect NameKAUSAR PARVEZ
Architect AddressB-1/236, VIKRANT KHAND, GOMTI NAGAR, LUCKNOW
Architect Licence NumberCA/90/13244
Structural Engineer NameASHOK GUPTA
Structural Engineer Address2/127, VIJAY KHAND, GOMTI NAGAR, LUCKNOW
Mobile number(Project Co-ordinator)7600200400

Land Details

AFS

Showing 1 blocks with 60 units

Property Summary

Total Carpet Area

5397.43 m²

58097.40 ft²

Total Units

60

2 different types

Blocks & Floors

1

8 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:89.96 m²
Balconies:135
Parking ratio:0.00 per unit

Block SAHIB GREENS

60 units

Khasra Details

Total Area

2926.20 m²

31497.32 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot NoPART OF KHASRA NO.- 588/1
Area(In Sq. Mt.)2926.20

Other Details

Contractor Name (if any)MEGA INFRA DEVELOPERS
Contractor AddressB-1/236, VIKRANT KHAND, GOMTI NAGAR, LUCKNOW
Architect NameKAUSAR PARVEZ
Architect AddressB-1/236, VIKRANT KHAND, GOMTI NAGAR, LUCKNOW
Architect Licence NumberCA/90/13244
Structural Engineer NameASHOK GUPTA
Structural Engineer Address2/127, VIJAY KHAND, GOMTI NAGAR, LUCKNOW
Mobile number(Project Co-ordinator)7600200400
SAHIB GREENS by MEGA INFRA DEVELOPERSBHUPINDER KAUR SAHNIGURMEET SINGH SAHNI | ReraTracker