OngoingActive

Rudra Vindhyadham

Mirzapur, Uttar Pradesh
16-11-2015
RERA Received Date
Ongoing
Type
31-03-2022
Completion Date

Overview

RERA Received Date

16-11-2015

Completion Date

31-03-2022

RERA ID

UPRERAPRJ196778

Location

Latitude

25.136165

Longitude

82.564261

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)15627
Project NameRudra Vindhyadham
Registration Fee (in Rs.)83500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)77
DistrictMirzapur
Original Start Date16-11-2015
TehsilMirzapur
Proposed Start Date16-11-2015
Sanctioning Competent AuthorityMirzapur-Vindhyanchal Development Authority (SPL. Area)
Project Cost (in Lacs)455
Proposed Completion Date31-03-2022

Bank Details

Account no.40313243555
Name Of Account HolderNMPL- SEPARATE BANK AC FOR RUDRA VINDHYADHAM
Bank NameSTATE BANK OF INDIA
Branch AddressSBI MAIN BRANCH, 1ST FLOOR, DUNKEENGANJ
Branch NameSME MIRZAPUR
IFSC CodeSBIN0063736

Development Works

Demarcation of Plots

This is single Plot shaped having total 1 no. of entry gate and 1 no. of exit gate from the 46 m wide front road. Site is surrounded by other plots of farmers from the three sides.

Boundary Wall

1.8- 2.1m high and 200 mm thick boundary wall designed. Brick work of 9 inches and Rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.

Road Work

Trimix raod will be used as per design suggested by the architect for internal road.

Footpaths

All internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes.

Water Supply Including Drinking Water Facilities

Ground water may also be used. Also end user shall be used their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity

Sewer System

Centralized Sewearge system shall be provided. All sewerage water shall go to STP for treatment. After treatment, water shall be recycled and it will use in gardening , flush tanks and vehicle washing. Overflow from the STP shall connect with Municiple sewerage system in future or a seasonal natural drain running along the site boundary.

Drain

Storm water system shall be provided. Storm water from roads and other landscape area shall connect to Storm water drain channel and go to Rain water harvesting Pit for recharging the ground water and overflow shall connect with Municiple drain line

Parks

There are many green/ landscape area in front / side of building including green parks, play areas for childrens and different recretional activities.

Tree Planting

There are different type of tree plantation is proposed at side in order to maintain greenary and natural view.

Design For Electric Supply Including Street Lighting

We have designed the system as per local electricity board and consider centralized transformer, HT panel, LT Panel, STP, Pump room etc

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Centralized Sewerage system shall be provided. All sewerage water shall go to the STP for treatment. After treatment, water shall recycled and it will use in gardening, flush tanks and vehicle washing. Overflow from the STP shall connect with Municiple sewerage system in future or a seasonal natural drain running along with site boundary

Solid Waste Management And Disposal System

There are proper garbage collection area provided for the solid waste management,

Water Conservation System

A well designed rain water harvesting system shall be provided for the whole building complex to conserve water

Energy Management System Including Use of Renewable Energy

We will use LED Lights fitting in external area as well as solar lights. In STP and Pump Room all the equipment shall have energy efficient motor. Terrace will be provided with Solar Voltaic Panels to provide renewable source of energy for common areas in buiding complex.

Fire Protection And Fire Safety System

NA

Social Infrastructure And Other Public Amenities Including Public Health Services

Sewerage, Storm water and water supply system shall be provided. We have proposed common pump room with primary filteration, transfer pumps to fill the domestic overhead tank. Water for domestic use and flushing go down through gravity from domestic as well as flushing tanks. All sewerage shall go to the STP for recycling the water. Storm water for roof, roads and other area shall connect to the storm water drain channel and go to the rain water harvesting pit for recharging the ground water and overflow shall connect with municiple drain or a seasonal natural drain running along the site boundary.

Emergency Evacuation Services

NA

Other Miscellaneous Work

NA

Documents

Registry Document

No: 1439 | Date: 14-03-2012

Extract of Khatauni

No: Affidavit related to bookings/ sales | Date: -

Extract of Khatauni

No: Extract of khautauni | Date: -

Extract of Khatauni

No: Development work plan, Electricity Supply Plan, Water supply plan, Waste Disposal Plan | Date: -

Extract of Khatauni

No: Khautauni | Date: -

Extract of Khatauni

No: Civil court order | Date: -

Details of Encumbrances

Uploaded: 02-09-2021

Commencement Certificate

Uploaded: 11-08-2021

Other Plan(If Any)

Uploaded: 13-08-2021

Proforma of Application Form

Uploaded: 13-08-2021

Proforma of Allotment Letter

Uploaded: 13-08-2021

Proforma of Conveyance Deed

Uploaded: 13-08-2021

Waste Disposal Plan

Uploaded: 11-08-2021

Water Supply Plan

Uploaded: 11-08-2021

Electricity Supply Plan

Uploaded: 11-08-2021

Development Work Plan

Uploaded: 11-08-2021

Affidavit

Uploaded: 13-08-2021

CA CERTIFICATE

Uploaded: 02-09-2021

ARCHITECT CERTIFICATE

Uploaded: 11-08-2021

ENGINEERS CERTIFICATE

Uploaded: 11-08-2021

Permits

Orignal Permit No167/2020-21
Orignal Permit Date30-09-2020
Valid Upto29-09-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto29-09-2028
End Date31-03-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Gopal Das
Contractor Address147 D Badali Katra Dankinganj Aghauli, Mirzapur
Architect NameSachin Dubey
Architect AddressRudra House, 15/63, Civil Lines, Opposite Green Park stadium, Gate no 2, Kanpur
Architect Licence NumberCA/2004/34680
Structural Engineer NameMaqsud E Nazar
Structural Engineer AddressG-70, 2nd Floor, Jaswant Plaza, Near Kalandi Kunj, Main Sarita Vihar Road, Okhla, New delhi
Mobile number(Project Co-ordinator)9554950304

Land Details

Plot

Showing 1 blocks with 5 units

Property Summary

Total Carpet Area

0.00

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN
Balconies:0
Parking ratio:NaN per unit

Block undefined

5 units

Khasra Details

Total Area

15626.64

168203.59 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot NoPlot No. 573, 574, 568, 567/2, 575, 578, 579, 583, 582, 584, 585 and 55, 56, 57, 58/1, 58/2 situated at Mirzapur Kala and Mauza Bathuwa with in Pargana Kantit, Tappa 84, Distt. Mirzapur
Area(In Sq. Mt.)15626.64

Other Details

Contractor Name (if any)Gopal Das
Contractor Address147 D Badali Katra Dankinganj Aghauli, Mirzapur
Architect NameSachin Dubey
Architect AddressRudra House, 15/63, Civil Lines, Opposite Green Park stadium, Gate no 2, Kanpur
Architect Licence NumberCA/2004/34680
Structural Engineer NameMaqsud E Nazar
Structural Engineer AddressG-70, 2nd Floor, Jaswant Plaza, Near Kalandi Kunj, Main Sarita Vihar Road, Okhla, New delhi
Mobile number(Project Co-ordinator)9554950304