NewActive

ROYAL VILLAS

Bareilly, Uttar Pradesh
01-03-2020
Launch Date
New
Type
05-07-2027
Completion Date

Overview

Launch Date

01-03-2020

Completion Date

05-07-2027

RERA ID

UPRERAPRJ665165

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)12709
Project NameROYAL VILLAS
Registration Fee (in Rs.)69000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)89
DistrictBareilly
Original Start Date-
TehsilBareilly
Proposed Start Date01-03-2020
Sanctioning Competent AuthorityBareily Development Authority
Project Cost (in Lacs)2100
Proposed Completion Date05-07-2027

Location

Latitude

28.351783

Longitude

79.457029

Bank Details

Account no.39406399540
Name Of Account HolderAera Construction Private Limited
Bank NameState Bank of India
Branch Address148, Civil Lines, SBI Administrative Office, Ground Floor, Bareilly UP 243001
Branch NameState Bank of India Civil Lines Bareilly
IFSC CodeSBIN0017644

Development Works

Demarcation of Plots

Done

Boundary Wall

1.8 - 2.1 M Height Boundary Wall Designed,

Road Work

Bitumenous/ Trimix Concrete Roads As Per Design By Architects.

Footpaths

Suitable Pathway Designed For Roads In Concrete/ Pavers/ Tiles / Equivalent Finishes

Water Supply Including Drinking Water Facilities

Centralized/ Borewell Water For Drinking And Domestic Use

Sewer System

Centralized Sewer System Shall Be Provided

Drain

Centralized Drainage System Shall Be Provided

Parks

Provision Of Several Parks/ Green Belts In Front And Allround Of Apartment Towers As Per Arch. Design

Tree Planting

Provision Of Complete Tree Plantation And Green Belts Designed By Landscape Architects

Design For Electric Supply Including Street Lighting

Provision Of Centralised Electrical Supply System. As Per Norms & Specifications/ Requirements Ofpvvnl, U.P.P.C.L.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Provision Of Centralised Sewerage System Going To Nagar Nigam Sewer Line

Solid Waste Management And Disposal System

Proper Garbage Collection Area Is Designated To Be Disposed As Per Town Area System

Water Conservation System

A Complete System Of Rain Water Harvesting Or Rain Water Recharge Pits Is Designed By Consultants As Per Requirements

Energy Management System Including Use of Renewable Energy

We Will Use Led Light Fittings In External Areas

Fire Protection And Fire Safety System

NA

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

NA

Other Miscellaneous Work

NA

Documents

Registry Document

No: 1197 | Date: 29-01-2020

Sale Deed

No: 8894 | Date: 15-07-2014

Sale Deed

No: 8915 | Date: 16-07-2014

Sale Deed

No: 8895 | Date: 15-07-2014

Sale Deed

No: 8240 | Date: 24-07-2015

Extract of Khatauni

No: 1426-1431 | Date: -

Extract of Khatauni

No: 1426-1431 | Date: -

Extract of Khatauni

No: 1426-1431 | Date: -

Registry Document

No: 114 | Date: 03-08-2011

Extract of Khatauni

No: Reply to query letter for registration of Royal Villas | Date: -

Extract of Khatauni

No: Reply to query letter-Royal Villas (02.07.2020) | Date: -

Other Plan(If Any)

CA CERTIFICATE

Details of Encumbrances

Uploaded: 25-03-2020

Commencement Certificate

Uploaded: 25-03-2020

Proforma of Application Form

Uploaded: 25-03-2020

Proforma of Allotment Letter

Uploaded: 25-03-2020

Proforma of Conveyance Deed

Uploaded: 25-03-2020

Proforma of Completion Certificate(Occupancy)

Uploaded: 25-03-2020

Waste Disposal Plan

Uploaded: 25-03-2020

Water Supply Plan

Uploaded: 25-03-2020

Electricity Supply Plan

Uploaded: 25-03-2020

Development Work Plan

Uploaded: 25-03-2020

Affidavit

Uploaded: 25-03-2020

ARCHITECT CERTIFICATE

Uploaded: 26-05-2020

ENGINEERS CERTIFICATE

Uploaded: 25-03-2020

Permits

Orignal Permit NoMAP20180425122316387
Orignal Permit Date06-07-2019
Valid Upto05-07-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto05-07-2027
End Date05-07-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)RASHID JI
Contractor AddressVill Udla Jagir, Bareilly
Architect NameNITIN SINGHAL
Architect AddressTulip Grace IVRI road Bareilly U.P.
Architect Licence NumberCA/9822668
Structural Engineer NameBrijpal Singh
Structural Engineer AddressA.64 Vaibhav Suncity Vistar bareilly U.P.
Mobile number(Project Co-ordinator)9897311407

Khasra Details

Total Area

720.75

7758.08 ft²

6 plots
Khasra
TypeKhasra
Khasra/Plot No808
Area(In Sq. Mt.)710.75
Khasra
TypeKhasra
Khasra/Plot No809
Area(In Sq. Mt.)2,075.33
Khasra
TypeKhasra
Khasra/Plot No810
Area(In Sq. Mt.)3,186.79
Khasra
TypeKhasra
Khasra/Plot No814
Area(In Sq. Mt.)1,558.31
Khasra
TypeKhasra
Khasra/Plot No815
Area(In Sq. Mt.)2,700.44
Khasra
TypeKhasra
Khasra/Plot No816
Area(In Sq. Mt.)2,477.54

Other Details

Contractor Name (if any)RASHID JI
Contractor AddressVill Udla Jagir, Bareilly
Architect NameNITIN SINGHAL
Architect AddressTulip Grace IVRI road Bareilly U.P.
Architect Licence NumberCA/9822668
Structural Engineer NameBrijpal Singh
Structural Engineer AddressA.64 Vaibhav Suncity Vistar bareilly U.P.
Mobile number(Project Co-ordinator)9897311407
ROYAL VILLAS by AERA CONSTRUCTION AND DEVELOPERS PVT. LTD.ARSHAD HASAN KHANMASOOD HASAN KHANMHOD RAFI | ReraTracker