27.8573
79.896017
Total Units
0
0 unit types
Carpet Area
0 ft²
0.00 m² · carpet only, excludes balcony
Blocks & Floors
0
0 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 0 ft² (0.00 m²)Balconies 0Parking per unit 0.005 of 5 rows list no units (1 floor is empty), so they add nothing to these totals
Showing 5 of 5 rows · 3 of 12 columns
| Block | Floor | Type |
|---|---|---|
| — | — | — |
| — | — | — |
| — | — | — |
| — | — | — |
| — | — | — |
Total Plot Area
0.0054 acres
22.00 m² · plot area
We have one plot of size 22001.4 having 1 main entrance gate from the 12 & 7.50 m wide two front road.
2.4 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
12m wide main road and 9m/7.5m wide branch roads shall be with sub base of stone soling & WBM with Bitumen Carpet on top and Kerb stone etc
For Foothpaths: Pathway tiles over base of PCC & subbase of soling.
For Water Supply & Drinking Water Supply Water Treatment plant will be provided. Portable Water will be supplied through underground piping.
Sewerage system shall be Provided. All Sewerage & Waste water shall go to the STP and bypass from the STP shall be connected with the Municipal Sewer Line.
Storm water drainage system shall be Provided. Storm water from Roof Top, Roads, Green areas and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharging the Ground water table. Overflow from Rain water Harvesting Pits shall be connect with Municipal drain line.
We will provide landscaped green area.
We will provide many type of trees all along the boundary wall & green area
For Electrical Supply centralized Transformer, HT Panel, LT Panel, Feeder Pillar for common services like External lighting, STP, Pump room etc. shall be provided as per the guidelines of local electricity Board.
NA
Sewerage system shall be Provided. All Sewerage & Waste water shall go to the STP and bypass from the STP shall be connected with the Municipal Sewer Line.
There are a proper garbage collection area provided for the solid waste management.
We will suggest to individual to use low flow fixtures as well dual flush cistern and rain water harvesting system to reduce the water consumption and improve the ground water level.
NA
NA
NA
NA
NA
Royal Estate Phase 1 is located in Shahjahanpur.
Yes. Royal Estate Phase 1 is registered under UPRERAPRJ538009/11/2025 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Royal Estate Phase 1 is 8 December 2029.
Royal Estate Phase 1 is developed by SPKN & SONS PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.