Have queries on this Project?
27.857098
79.898757
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
35607.00 m²
383270.19 ft²
We have one plot of size 35606.58 sq. mtr.having entrance from the 12 m wide road.
2.4 m high and 230 mm thick Brick work and rcc work in column, beam and footing.
12m wide main road and 9m/7.5m wide branch roads shall be with sub base of stone soling & WBM with Bitumen Carpet on top and Kerb stone etc
For Foothpaths: Pathway tiles over base of PCC & sub-base of soling.
For Water Supply & Drinking Water Supply Water Treatment plant will be provided. Portable Water will be supplied through underground piping.
Sewerage system shall be Provided. All Sewerage & Waste water shall go to the STP and bypass from the STP shall be connected to the Municipal Sewer Line.
Storm water drainage system shall be Provided. Storm water from Roof Top, Roads, Green areas and other landscape areas shall be connected to the Storm water concealed drain line and go to the Rain water harvesting Pit for recharging the Ground water table. Overflow from Rain water Harvesting Pits shall be connect with Municipal drain line.
We will provide landscaped green area.
We will provide many type of trees all along the boundary wall & green area
For Electrical Supply centralized Transformer, HT Panel, LT Panel, Feeder Pillar for common service like External lighting, STP, Pump room etc shall be provided as per the guidelines of local electricity Board.
NA
Sewerage system shall be Provided. All Sewerage & Waste water shall go to the STP and bypass from the STP shall be connected with the Municipal Sewer Line.
There are a proper garbage collection area provided for the solid waste management
We will suggest to individual to use low flow fixtures as well dual flush cistern and rain water harvesting system to reduce the water consumption and improve the ground water level.
NA
NA
NA
NA
NA