NewActive

Roselia Grand

Kanpur Nagar, Uttar Pradesh
01-12-2023
Launch Date
New
Type
30-11-2028
Completion Date

Overview

Launch Date

01-12-2023

Completion Date

30-11-2028

RERA ID

UPRERAPRJ438757

Location

Latitude

26.29085

Longitude

80.20155

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)14508
Project NameRoselia Grand
Registration Fee (in Rs.)78000
AddressPlot No. 26 of Block No.11, RLDA situated at Gwaltoli
Village/Locality/Sector etc.RLDA, Gwaltoli
StateUttar Pradesh
Project Duration (In month)60
DistrictKanpur Nagar
Original Start Date-
TehsilKanpur
Proposed Start Date01-12-2023
Sanctioning Competent AuthorityKanpur Development Authority
Project Cost (in Lacs)28601
Proposed Completion Date30-11-2028

Bank Details

Account Details
Name of the AccountNILANSH BUILDCON PRIVATE LIMITED-COLLECTION ACCOUNT- ROSELIA GRAND
Account Number923020069938719
Bank NameAxis Bank
Branch NameSwaroop Nagar
Branch AddressSwaroop Nagar, Kanpur
Branch StateUttar Pradesh
Branch DistrictKanpur Nagar
IFSC CodeUTIB0001519
Separate Account Details
Name of the AccountNILANSH BUILDCON PRIVATE LIMITED-SEPARATE ACCOUNT- ROSELIA GRAND
Account Number923020070016392
Bank NameAxis Bank
Branch NameSwaroop Nagar
Branch AddressSwaroop Nagar, Kanpur
Branch StateUttar Pradesh
Branch DistrictKanpur Nagar
IFSC CodeUTIB0001519
Transaction Account Details
Name of the AccountNILANSH BUILDCON PRIVATE LIMITED-TRANSACTION ACCOUNT- ROSELIA GRAND
Account Number923020069522479
Bank NameAxis Bank
Branch NameSwaroop Nagar
Branch AddressSwaroop Nagar, Kanpur
Branch StateUttar Pradesh
Branch DistrictKanpur Nagar
IFSC CodeUTIB0001519

Development Works

Demarcation of Plots

We have one plot of size 14508.41 sq. mtr.having 2 main entrance gate from the 36 m wide front road.

Boundary Wall

6m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.

Road Work

From the main entrance gate we have RCC road of 6m driveway and kerb stone through out the project.

Footpaths

We will provide 1.0 m wide footpath at suitable places

Water Supply Including Drinking Water Facilities

We will provide Two nos. of pump for the requirement of domestic use through underground boring.

Sewer System

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.

Drain

Storm water shall be Provided in form of underground pipe drains in 150/200/300 mm dia PVC/RCC pipes with catch basins.These drains from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.

Parks

We will provide green area with the different activities and kids play area

Tree Planting

Good height trees will be planted @ 50 trees per hectare in our project

Design For Electric Supply Including Street Lighting

We will design & implement the system as per local electricity Board Transformer(500kva), HT panel, LT Panel, Feeder Pillar and DG (300 kva) back for common service like External lighting, Fountain, STP, Pump room & limited power backup for flats.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP of capacity 120KLD and overflow from the STP shall be connected with the Municipal sewerage system.,when come into force.Trated wtaer recycling system will also be used.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided through nagar nigam facility for the solid waste management.

Water Conservation System

We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.

Fire Protection And Fire Safety System

We will provide Fire Fighting facility in common areas as per fire department rules facilities like yard hydrant,extinguisher,hosereel,sprinker system and PA system will also be provided

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

Seprate fire staircase with fire rated doors will be use as Emergency Evacuation Services.

Other Miscellaneous Work

NA

Documents

Lease Deed

No: 6688 | Date: 11-07-2022

Details of Encumbrances

Uploaded: 30-11-2023

Commencement Certificate

Uploaded: 08-11-2023

Other Plan(If Any)

Uploaded: 30-11-2023

Proforma of Application Form

Uploaded: 09-11-2023

Proforma of Allotment Letter

Uploaded: 09-11-2023

Proforma of Conveyance Deed

Uploaded: 09-11-2023

Waste Disposal Plan

Uploaded: 09-11-2023

Water Supply Plan

Uploaded: 09-11-2023

Electricity Supply Plan

Uploaded: 09-11-2023

Development Work Plan

Uploaded: 09-11-2023

Affidavit

Uploaded: 08-12-2023

CA CERTIFICATE

Uploaded: 18-12-2023

ARCHITECT CERTIFICATE

Uploaded: 08-12-2023

ENGINEERS CERTIFICATE

Uploaded: 18-12-2023

Other

Uploaded: 08-11-2023

Proforma of Agreement for Sale

Uploaded: 18-12-2023

Permits

Orignal Permit NoGroup Housing/04836/KDA/BP/22-23/1419/03082023
Orignal Permit Date18-10-2023
Valid Upto17-10-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto08-10-2031
End Date30-11-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Self
Contractor AddressSelf
Architect NameRajiv Bajpai C/o PRAGATI DESIGNERS & DEVELOPERS
Architect AddressFLAT NO.205,8/220, ANAND KESAV ARYA NAGAR ,KANPUR-208002
Architect Licence NumberCA/2002/29796
Structural Engineer NameDr Maksood C/o NNC DESIGN INTERNATIONAL CONSULTING
Structural Engineer AddressG-70, 2nd Floor, Jaswant Plaza, Near Kalindi Kunj, Main Sarita Vihar Road, New Delhi-110025
Mobile number(Project Co-ordinator)9935080900

Land Details

AFS

Showing 12 blocks with 87 units

Property Summary

Total Carpet Area

12523.56 m²

134802.35 ft²

Total Units

62

4 different types

Blocks & Floors

12

16 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:201.99 m²
Balconies:306
Parking ratio:0.00 per unit

Block TOWER-1

52 units

Block COMMERCIAL-1

4 units

Block COMMERCIAL-2

4 units

Block VILLA-1

3 units

Block VILLA-2

3 units

Block VILLA-3

3 units

Block VILLA-4

3 units

Block VILLA-5

3 units

Block VILLA-6

3 units

Block VILLA-7

3 units

Block VILLA-8

3 units

Block VILLA-9

3 units

Khasra Details

Total Area

14836.00 m²

159693.22 ft²

1 plot
Plot
TypePlot
Khasra/Plot No26
Area(In Sq. Mt.)14836

Other Details

Contractor Name (if any)Self
Contractor AddressSelf
Architect NameRajiv Bajpai C/o PRAGATI DESIGNERS & DEVELOPERS
Architect AddressFLAT NO.205,8/220, ANAND KESAV ARYA NAGAR ,KANPUR-208002
Architect Licence NumberCA/2002/29796
Structural Engineer NameDr Maksood C/o NNC DESIGN INTERNATIONAL CONSULTING
Structural Engineer AddressG-70, 2nd Floor, Jaswant Plaza, Near Kalindi Kunj, Main Sarita Vihar Road, New Delhi-110025
Mobile number(Project Co-ordinator)9935080900